torque YAMAHA GRIZZLY 700 2022 User Guide

Page 128 of 176

9-29
94. Install the drain bolt and its new gasket, and
then tighten the bolt to the specified torque.
5. Refill with the recommended differential gear oil to the brim of the filler hole as shown.
NOTICE: Be sure no foreign material en-
ters the differential gear case.
[ECB00412]
6. Check the oil filler bolt gasket for damage, and replace it if necessary.
7. Install the oil filler bolt and its gasket, and then tighten the bolt to the specified torque.
8. Check the differential gear case for oil leak- age. If oil is leaking, check for the cause.EBU23473CoolantThe coolant level should be checked regularly. In
addition, the coolant must be changed at the in-
tervals specified in the periodic maintenance
chart.
Tightening torque:
Differential gear oil drain bolt:9.8 N·m (0.98 kgf·m, 7.2 lb·ft)
1. Differential gear oil filler bolt
2. Gasket
3. Differential gear oil
4. Correct oil level
1
2
3
4
Recommended differential gear oil: See page 11-1.
Tightening torque: Differential gear oil filler bolt:23 N

Page 133 of 176

9-34
9
6. Place a container under the coolant reservoir
to collect the used coolant.
7. Remove the coolant reservoir cap.
8. Disconnect the coolant reservoir hose on the coolant reservoir side, and then drain the
coolant from the coolant reservoir.
9. After draining the coolant, thoroughly flush the cooling system with clean tap water.
10. Install the coolant drain bolt and its new gas- ket, and then tighten the bolt to the specified
torque. 11. Connect the coolant reservoir hose.
12. Pour the recommended coolant into the radi-
ator until it is full.
13. Pour the recommended coolant into the res- ervoir to the maximum level mark, and then
install the reservoir cap.
14. Loosen the water pump air bleed bolt, with- out removing it, to allow all of the air to es-
cape from the air bleed bolt hole.
1. Coolant reservoir hose
Tightening torque:Coolant drain bolt:10 N·m (1.0 kgf·m, 7.4 lb·ft)1. Water pump air bleed bolt
1
UBLT60E0.book Page 34 Tuesday, July 13, 2021 9:16 AM

Page 134 of 176

9-35
915. When coolant begins to flow out of the bolt
hole, tighten the water pump air bleed bolt to
the specified torque.
16. Remove panel E. (See page 9-10.)
17. Loosen the clamp screw, and then remove the V-belt cooling duct. 18. Loosen the cylinder head air bleed bolt, with-
out removing it, to allow all of the air to es-
cape from the air bleed bolt hole.
19. When coolant begins to flow out of the bolt hole, tighten the cylinder head air bleed bolt
to the specified torque.
20. Start the engine and let it idle for ten minutes.
21. Rev the engine five times.
Tightening torque:
Water pump air bleed bolt:10 N·m (1.0 kgf·m, 7.4 lb·ft)
1. V-belt cooling duct
2. Clamp screw
1
2
1. Cylinder head air bleed boltTightening torque:Cylinder head air bleed boltW10 N

Page 135 of 176

9-36
9
22. Pour additional coolant into the radiator until
it is full.
23. Stop the engine and allow it to cool. If the coolant level has dropped after the engine
has cooled, add sufficient coolant until it
reaches the top of the radiator, and then in-
stall the radiator cap.
24. Start the engine, and then check for coolant leakage.
TIPIf any leakage is found, have a Yamaha dealer
check the cooling system. 25. Install the V-belt cooling duct, and then tight-en the clamp screw.
26. Install the footboard by installing the bolts and nuts, and then tighten them to the speci-
fied torques.
TIPTighten footboard bolts B in the order shown. 1. Footboard nut
2. Footboard bolt A
3. Footboard bolt B
3
1
2
1
UBLT60E0.book Page 36 Tuesday, July 13, 2021 9:16 AM

Page 136 of 176

9-37
927. Install the panels.
EBU34234Cleaning the air filter elementThe air filter element should be cleaned at the in-
tervals specified in the periodic maintenance
chart. Clean or replace the air filter element more
frequently if you ride in unusually wet or dusty ar-
eas.TIPThere is a check hose at the bottom of the air filter
case. If dust or water collects in this hose, empty
the hose and clean the air filter element and air fil-
ter case. 1. Park the ATV on a level surface.
Tightening torques:
Footboard nut:4.0 N

Page 140 of 176

9-41
93. Tap the tailpipe lightly, and then use a wire
brush to remove any carbon deposits from
the spark arrester portion of the tailpipe and
inside of the tailpipe housing.
4. Check the gasket for damage. Replace if nec- essary.
5. Install the gasket onto the tailpipe, then insert the tailpipe into the muffler and align the bolt
holes.
6. Install the bolts and tighten to the specified torque.
EBU23932V-belt case drain plugAfter riding in water deep enough to allow it to en-
ter the V-belt case, remove the V-belt case drain
plug to drain the water from the case.TIPIf water drains from the V-belt case after removing
the plug, have a Yamaha dealer check the ATV as
the water may affect other engine parts. Tightening torque:Tailpipe bolt:10 N

Page 154 of 176

9-55
9
Select a suitable charger and follow the manu-
facturer’s instructions.
NOTICEECB00933To charge a VRLA (valve-regulated lead-acid)
battery, a special battery charger is required.
Using a conventional battery charger will dam-
age the battery. To store the battery
If the ATV will not be used for more than one
month, remove the battery, fully charge it, and
then place it in a cool, dry place.
 If the battery will be stored for more than two
months, check it at least once a month and fully
charge it if necessary.NOTICEECB00942Always keep the battery charged. Storing the
battery in a discharged state for an extended
period of time will cause permanent battery
damage.
 Do not store the battery in an excessively
cold or warm place [below freezing or above
30 °C (90 °F)].
To install the battery
1. Place the battery in its compartment.
2. Connect the positive battery lead first, then connect the negative battery lead by installing
their bolt. NOTICE: When installing the bat-
tery, the main switch must be off, and the
positive lead must be connected before
the negative lead.
[ECB01111]
3. Install the battery holding plate by installing the nuts.
4. Install the front carrier by installing the bolts and tightening them to the specified torques.1. Positive battery lead (red)
2. Negative battery lead (black)
12
UBLT60E0.book Page 55 Tuesday, July 13, 2021 9:16 AM

Page 155 of 176

9-56
9
5. Install the panel.
TIP
Make sure the positive and negative battery
leads are installed as shown.
 Fully charge the battery before installing it.
EBU30525Replacing a fuse
Tightening torques:
Carrier bolt (upper):34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (lower): 34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (under the fenders): 7 N·m (0.7 kgf·m, 5.2 lb·ft)
1. Fuse box
2. Main fuse
3. EPS fuse
4. Fuel injection system spare fuse
5. Fuel injection system fuse
2345
1
UBLT60E0.book Page 56 Tuesday, July 13, 2021 9:16 AM

Page 161 of 176

9-62
9
EBU25705Installing a wheel1. Install the wheel with the arrow mark pointingin the forward rotating direction of the wheel.
2. Install the wheel nuts with their tapered side towards the wheel. 3. Lower the ATV to the ground.
4. Tighten the wheel nuts to the specified
torques.1. Arrow mark
2. Forward rotating direction
3. Wheel nut
1
2
3
3
1. Tapered nutTightening torquesW Front wheel nut:55 N

Page:   < prev 1-10 11-20