belt DODGE NEON 1999 Service Manual PDF

DODGE NEON 1999 Service Manual PDF NEON 1999 DODGE DODGE https://www.carmanualsonline.info/img/12/56911/w960_56911-0.png DODGE NEON 1999 Service Manual PDF

Page 745 of 1200

DODGE NEON 1999  Service Manual PDF pulley bracket and tighten fasteners to 31 N´m (275
in. lbs.) (Fig. 51).
(11) Pull tensioner plunger pin. Pretension is cor-
rect when pin can be removed and installed.
(12) Rotate crankshaft 2 revol

Page 746 of 1200

DODGE NEON 1999  Service Manual PDF TIMING BELTÐWITH MECHANICAL TENSIONER
CHECKING BELT TIMINGÐCOVER INSTALLED
²Remove number one spark plug.
²Using a dial indicator, set number one cylinder
to TDC on the compression stroke.
²Remov

Page 747 of 1200

DODGE NEON 1999  Service Manual PDF (3) Remove crankshaft damper bolt. Remove
damper using the large side of Special Tool 1026 and
insert 6827-A (Fig. 56).
(4) Lower vehicle and place a jack under engine.
(5) Remove right engine mount.

Page 748 of 1200

DODGE NEON 1999  Service Manual PDF CAMSHAFT AND CRANKSHAFT TIMING
PROCEDURE AND BELT INSTALLATIONÐ
SOHC ENGINE
(1) Set crankshaft sprocket to TDC by aligning the
sprocket with the arrow on the oil pump housing,
then back off to 3 notc

Page 749 of 1200

DODGE NEON 1999  Service Manual PDF the passenger compartment; at the lower edge of
instrument panel; near the steering column.
²Turn the ignition switch on and access the ªmis-
cellaneousº screen.
²Select ªre-learn cam/crankº opt

Page 750 of 1200

DODGE NEON 1999  Service Manual PDF (4) Install oil filter and adaptor.
(5) Install transaxle lower dust cover.
(6) Install powertrain bending strut.
(7) Install front engine mount and bracket.
CAUTION: The torque procedure for the stru

Page 755 of 1200

DODGE NEON 1999  Service Manual PDF (11) Install oil pump. If crankshaft end play is to
be checked refer to service procedures in this section.
(12) Install crankshaft sprocket.
(13) Install oil filter adapter and filter.
(14) Install o

Page 756 of 1200

DODGE NEON 1999  Service Manual PDF (5) Torque all oil pump attaching bolts to 28 N´m
(250 in. lbs.)
(6) Install new front crankshaft seal using Special
Tool 6780 (Fig. 88).
(7) Install crankshaft sprocket, using Special Tool
6792 (Fig

Page 757 of 1200

DODGE NEON 1999  Service Manual PDF PISTON AND CONNECTING ROD
REMOVAL
(1) Remove top ridge of cylinder bores with a reli-
able ridge reamer before removing pistons from cyl-
inder block.Be sure to keep tops of pistons
covered during thi

Page 759 of 1200

DODGE NEON 1999  Service Manual PDF (6) Tap the piston down in cylinder bore, using a
hammer handle. At the same time, guide connecting
rod into position on connecting rod journal.
(7) Install rod caps. InstallNewbolts and tighten
to 27