starter DODGE NEON 2000 Service Service Manual

DODGE NEON 2000 Service Service Manual NEON 2000 DODGE DODGE https://www.carmanualsonline.info/img/12/56910/w960_56910-0.png DODGE NEON 2000 Service Service Manual

Page 751 of 1285

DODGE NEON 2000  Service Service Manual (27) Start engine and run until operating temper-
ature is reached.
(28) Ensure engine is properly positioned. Refer to
Torque Struts in this section for adjustment proce-
dure.
(29) Adjust transmissi

Page 752 of 1285

DODGE NEON 2000  Service Service Manual (2) Install intake manifold to lower support
bracket bolts (Fig. 31). Tighten bolts to 11 N´m (95
in. lbs.).
(3) Remove covering from fuel injector holes and
insure the holes are clean. Install fuel

Page 844 of 1285

DODGE NEON 2000  Service Service Manual 1 second. Therefore, battery voltage is not supplied to
the fuel pump, ignition coil, fuel injectors and heated
oxygen sensors.
ENGINE START-UP MODE
This is an OPEN LOOP mode. If the vehicle is in
par

Page 845 of 1285

DODGE NEON 2000  Service Service Manual ²All inputs monitored for proper voltage range.
²All monitored components (refer to the Emission
section for On-Board Diagnostics).
The PCM compares the upstream and downstream
heated oxygen sensor

Page 850 of 1285

DODGE NEON 2000  Service Service Manual CLUTCH INTERLOCK/UPSTOP SWITCH
DESCRIPTION
The clutch interlock/upstop switch is an assembly
consisting of two switches: an engine starter inhibit
switch (interlock) and a clutch pedal upstop switch
(

Page 851 of 1285

DODGE NEON 2000  Service Service Manual signal to the PCM, allowing engine starter operation.
The interlock switch is not adjustable.
Clutch Pedal Upstop Switch
With the clutch pedal at rest, the clutch pedal
upstop switch is closed, allowi

Page 928 of 1285

DODGE NEON 2000  Service Service Manual (11) Disconnect the vehicle speed sensor connector
(Fig. 39).
(12) Raise vehicle on hoist.
(13) Remove transaxle oil drain plug and drain oil
into a suitable container.
(14) Remove both axle shafts. R

Page 929 of 1285

DODGE NEON 2000  Service Service Manual (23) Carefully lower engine and transaxle on screw
jack until proper removal clearance is obtained.
(24) Obtain a helper to assist in holding transaxle
while removing transaxle-to-engine mounting bolt

Page 988 of 1285

DODGE NEON 2000  Service Service Manual INSTALLATION
(1) Install cable assembly through floor pan open-
ing and secure to floor pan with grommet plate and
one screw (Fig. 16). Make sure the three grommet
plate studs protrude through cable a

Page 997 of 1285

DODGE NEON 2000  Service Service Manual PARK/NEUTRAL STARTING AND BACK-UP
LAMP SWITCH
TEST
The park/neutral starting switch is the center ter-
minal of the three terminal switch. It provides
ground for the starter solenoid circuit through t
Page:   < prev 1-10 ... 11-20 21-30 31-40 41-50 51-60 next >