Piston rod torque HONDA CIVIC 1999 6.G Workshop Manual

HONDA CIVIC 1999 6.G Workshop Manual CIVIC 1999 6.G HONDA HONDA https://www.carmanualsonline.info/img/13/6068/w960_6068-0.png HONDA CIVIC 1999 6.G Workshop Manual

Page 220 of 2189

HONDA CIVIC 1999 6.G Workshop Manual PistonsGrankshaft
lnstallation
Before installing the pistons, apply a coat of
engine oil to the ring grooves and cylinder
bores.
lf the crankshaft is already installed:
. Set the crankshaft to BDC for

Page 1176 of 2189

HONDA CIVIC 1999 6.G Workshop Manual Master Cylinder/Brake Booster
Pushrod Glearance Adjustment
NOTEr
. The master cylinder pushrod-to-piston clearancemust be checked and adjustments made, if neces_sary, before installing the master cyli