ISUZU KB P190 2007 Workshop Repair Manual
KB P190 2007
ISUZU
ISUZU
https://www.carmanualsonline.info/img/61/57177/w960_57177-0.png
ISUZU KB P190 2007 Workshop Repair Manual
Trending: coolant capacity, Diagram, dead battery, SECURITY, tire pressure, transmission fluid, sport mode
Page 101 of 6020
HEATER AND AIR CONDITIONING 1-67
RTW 710SH000901
This illustration is based on RHD model
Important Operation -Reassembly
6. Electronic Thermostat
1) Install the electronic thermostat to the evaporator core specified position with the clip.
2) Sensor part must not interfere with the evaporator core.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 102 of 6020
1-68 HEATER AND AIR CONDITIONING
DUCT (WITHOUT A/C)
REMOVAL AND INSTALLATION
This illustration is based on RHD model
RTW 710LF003901
Removal Steps
1. Glove box
2. Passenger lower bracket
3. Evaporator assembly
Installation Steps
3. Evaporator assembly
2. Passenger lower bracket
1. Glove box
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 103 of 6020
HEATER AND AIR CONDITIONING 1-69
DISASSEMBLY AND REASSEMBLY
This illustration is based on RHD model
RTW 710MF001001
Disassembly Steps
1. Packing cooler outlet
2. Packing cooler inlet
3. Seal FOD cooler
4. Clip heater
5. Case : cooler upper
6. Case : cooler lower
7. Packing drain
8. Grommet
Reassembly Steps
8. Grommet
7. Packing drain
6. Case : cooler lower
5. Case : cooler upper
4. Clip heater
3. Seal FOD cooler
2. Packing cooler inlet
1. Packing cooler outlet
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 104 of 6020
1-70 HEATER AND AIR CONDITIONING
BLOWER UNIT ASSEMBLY
REMOVAL AND INSTALLATION
This illustration is based on RHD model
RTW 710LF001801
Removal Steps
1. Control cable
2. Instrument panel assembly and cross
beam
3. Electronic thermostat connector
4. Evaporator or duct
5. Resistor connector
6. Blower motor connector
7. Blower unit assembly or intake box assembly
Installation Steps
7. Blower unit assembly or intake box
assembly
6. Blower motor connector
5. Resistor connector
4. Evaporator or duct
3. Electronic thermostat connector
2. Instrument panel assembly and cross
beam
1. Control cable
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 105 of 6020
HEATER AND AIR CONDITIONING 1-71
Important Operations - Removal
2. Instrument Panel Assembly and Cross Beam
Refer to SECTION 10 “INSTRUMENT PANEL”.
4. Evaporator or Duct
Refer to “EVAPORATOR” or “DUCT” in this section.
Important Operation - Installation
2. Instrument Panel Assembly and Cross Beam
Adjust the heater control cables.
Refer to “CONTOROL LEVER ASSEMBLY” in this section.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 106 of 6020
1-72 HEATER AND AIR CONDITIONING
DISASSEMBLY AND REASSEMBLY
This illustration is based on RHD model
Disassembly Steps
1. Attaching screw
2. Intake link
3. Intake lever
4. Intake packing
5. Attaching screws
6. Blower motor assembly
7. Attaching screw
8. Flat resistor
9. Upper case
10. Lower case
11. Mode door
12. Bell mouth
13. Control cable clamp
Reassembly Steps
13. Control cable clamp
12. Bell mouth
11. Mode door
10. Lower case
9. Upper case
8. Flat resistor
7. Attaching screw
6. Blower motor assembly
5. Attaching screws
4. Intake packing
3. Intake lever
2. Intake link
1. Attaching screw
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 107 of 6020
HEATER AND AIR CONDITIONING 1-73
DEFROSTER NOZZLE AND VENT DUCT
REMOVAL AND INSTALLATION
This illustration is based on RHD model
RTW 710MF000201
Removal Steps
1. Instrument panel assembly and cross beam
2. Side def hose RH/LH
3. Defroster nozzle
4. Vent duct driver side and assist side
5. Center vent duct
Installation Steps
5. Center vent duct
4. Vent duct driver side and assist side
3. Defroster nozzle
2. Side def hose RH/LH
1. Instrument panel assembly and cross beam
Important Operation - Removal
1. Instrument Panel Assembly and Cross Beam
Refer to SECTION 10 “INSTRUMENT PANEL”.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 108 of 6020
1-74 HEATER AND AIR CONDITIONING
REAR HEATER DUCT
REMOVAL AND INSTALLATION
This illustration is based on RHD model
RTW 710LF004301
Disassembly Steps
1. Front seat assembly (RH/LH)
• Refer to SECTION 10 “FRONT
SEAT”.
2. Rear floor console
• Refer to SECTION 10 “FLOOR
CONSOLE”.
3. Front floor console (A/T, M/T Model)
• Refer to SECTION 10 “FLOOR
CONSOLE”.
4. Sill plate (RH/LH)
• Refer to SECTION 10 “INTERIOR
TRIM PANELS”.
5. Dash side trim cover (RH/LH)
6. Carpet
7. Clip
8. Rear Heater duct (RH/LH)
9. Rear Heater duct center
Reassembly Steps
9. Rear heater duct center
8. Rear heater duct (RH/LH)
7. Clip
6. Carpet
5. Dash side trim cover (RH/LH)
4. Sill plate (RH/LH)
• Refer to SECTION 10 “INTERIOR
TRIM PANELS”.
3. Front floor console (A/T, M/T Model)
• Refer to SECTION 10 “FLOOR
CONSOLE”.
2. Rear floor console
• Refer to SECTION 10 “FLOOR
CONSOLE”.
1. Front seat assembly (RH/LH)
• Refer to SECTION 10 “FRONT
SEAT”.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 109 of 6020
HEATER AND AIR CONDITIONING 1-75
CONTROL LEVER ASSEMBLY
REMOVAL AND INSTALLATION
This illustration is based on RHD model
RTW 710MF000801
Removal Steps
1. Glove box
2. Instrument panel driver side lower cover
3. Ash-tray
4. Control cables
5. Center cluster
6. Attaching screw
7. A/C switch connector
8. Fan switch connector
9. Control lever assembly
Installation Steps
9. Control lever assembly
8. Fan switch connector
7. A/C switch connector
6. Attaching screw
5. Center cluster
4. Control cables
3. Ash-tray
2. Instrument panel driver side lower cover
1. Glove box
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 110 of 6020
1-76 HEATER AND AIR CONDITIONING
Important Operations - Removal
2. Instrument Panel Driver Lower Cover
Refer to SECTION 10 “INSTRUMENT PANEL” .
RTW 710SH000601
4. Control Cables
Disconnect control cables at each side of the unit.
5. Center Cluster
Refer to SECTION 10 “INSTRUMENT PANEL”.
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Trending: 7D1-40, wheel bolt torque, engine oil, seat adjustment, headlamp, open hood, fuel pressure