CondenserAssemblyand
Condenser Fan Assembly HEATER, AIR CONDITIONER AND VENTILATION-55-40
CONDENSER ASSEMBLY AND CONDENSER FAN ASSEMBLY
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
DRefrigerant Draining and Refilling (Refer to P.55-16, 19.)
DFront Bumper Removal and Installation (Refer to GROUP 51.)
12
34
Pipe coupling
O-ring
A/C compressor oil:
SUN PAG 56
5, 6
5
4.9¶0.9 N m
7
9
8 6
Fan motor assembly removal steps
AA"1. Fan motor and shroud assembly
2. Fan
3. Motor assembly
4. Fan shroud
Condenser assembly removal steps
DAir cleaner (Refer to GROUP 15.)
DRefrigerant draining and refilling
(Refer to P55A-16,19.)
AB"5. Flexible discharge hose connection
AB"6. Liquid pipe A connection
7. Condenser assembly
8. Clamp
9. Receiver
REMOVAL SERVICE POINTS
AA"FAN MOTOR AND SHROUD ASSEMBLY
REMOVAL
1. Remove the intercooler mounting bolts/nuts and pull the
intercooler forward.
2. Move the fan motor/shroud assembly upward for removal.
HEATER, AIR CONDITIONER AND VENTILATION-Refrigerant Lines55-42
REFRIGERANT LINES
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operations
DRefrigerant Draining and Refilling (Refer to P.55-16, 19.).
DRadiator Grille Removal and Installation (Refer to GROUP 51.)
DAir Cleaner Removal and Installation (Refer to GROUP 15.)
1
2
- Pipe coupling
O-ring
A/C compressor oil: SUN PAG 56
3, 4, 5, 6
5
4
13±1 N·m
O-ring
6
12±2 N·m4.9±0.9
N·m
High-pressure side
service valve
4.9±0.9 N·m6
3
12±2 N·m
Low-pressure side
service valve12±2 N·m
Removal steps
1. Dual pressure switch
AA"2. Flexible discharge hose
AA"3. Flexible suction hoseAA"4. Suction pipe
AA"5. Liquid pipe A
AA"6. Liquid pipe B
REMOVAL SERVICE POINTS
AA"REMOVAL OF HOSES AND PIPES
To prevent the entry of dust or other foreign bodies, plug
the condenser, compressor, and expansion valve nipples.
Caution
As the compressor oil and receiver are highly moisture
absorbent, use a non-porous material to plug the hose
and nipples.
HEATER, AIR CONDITIONER AND VENTILATION-Refrigerant Lines55-43
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operations
DRefrigerant Draining and Refilling (Refer to P.55-16, 19.)
DRadiator Grille Removal and Installation (Refer to GROUP 51.)
DAir Cleaner Removal and Installation (Refer to GROUP 15.)
1
23
- Pipe
coupling
O ring
A/C compressor oil: SUN PAG 56
2, 3, 4, 5, 6
6
513±1 N·m
Low - pressure side
service valve
O ring
6
12±2 N·m 4.9±0.9 N·m
High - pressure side
service valve
4.9±0.9
N·m
4
12±2 N·m
12±2 N·m
Removal steps
1. Dual pressure switch
AA"2. Flexible discharge hose
AA"3. Flexible suction hoseAA"4. Suction pipe
AA"5. Liquid pipe A
AA"6. Liquid pipe B
REMOVAL SERVICE POINTS
AA"REMOVAL OF HOSES AND PIPES
To prevent the entry of dust or other foreign bodies, plug
the condenser, compressor, and expansion valve nipples.
Caution
As the compressor oil and receiver are highly moisture
absorbent, use a non-porous material to plug the hose
and nipples.