check engine SSANGYONG MUSSO 2003 Service Manual

SSANGYONG MUSSO 2003 Service Manual MUSSO 2003 SSANGYONG SSANGYONG https://www.carmanualsonline.info/img/67/57511/w960_57511-0.png SSANGYONG MUSSO 2003 Service Manual

Page 627 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE CONTROLS  1F3-17
6. After adjustment, tighten the locking nut and place theposition marking with different color of paint. Notice If there are no changes in idle speed with PLA unit 
adju

Page 639 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE CONTROLS  1F3-29
7. Check the fuel injection nozzle and adjust opening pressureif necessary. Opening pressure adjustment Disassemble the fuel injection nozzle and replace the steel washer

Page 640 of 1574

SSANGYONG MUSSO 2003  Service Manual 1F3-30  OM600 ENGINE CONTROLS
REMOVAL AND INSTALLATION OF INJECTION TIMING DEVICE Preceding Work : Removal of vacuum pump
1 Cylinder Head Cover 
2 Bolt ................................................

Page 641 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE CONTROLS  1F3-31
Tools Required 601 589 00 08 00Flange
601 589 05 21 00 Locking Screw
116 589 20 33 00 Sliding Hammer
116 589 02 34 00 Threaded  Bolt
667 589 04 63 00 Retaining Plate Remo

Page 644 of 1574

SSANGYONG MUSSO 2003  Service Manual 1F3-34  OM600 ENGINE CONTROLS
12. Push back the timing chain with retaining plate (26) and remove the injection timing device (9).
Retaining Plate 667 589 04 63 00
13. Installation should follow the r

Page 645 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE CONTROLS  1F3-35
INJECTION TIMING DEVICE Preceding Work : Removal of injection timing device
1 Cam Sprocket........................................... Check
2 Bushing ....................

Page 648 of 1574

SSANGYONG MUSSO 2003  Service Manual 1F3-38  OM600 ENGINE CONTROLS
Tools Required 617 589 08 21 00  Position Sensor 
Test Procedure 
1. Remove the screw plug (5) and seal (4) and collect oil in a suitable vessel.
2. Install the position

Page 651 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE CONTROLS  1F3-41
With Pulse Generator
Tools Required 617 589 09 21 00  Rl Sensor
617 589 10 21 00  Timing Tester667 589 00 21 00  TDC Pulse Generator 
Commercial Tools
Item
Digital Tester

Page 661 of 1574

SSANGYONG MUSSO 2003  Service Manual OM600 ENGINE CONTROLS  1F3-51
12. Connect the vacuum line (13, 14). 
13. Connect the connecting rod (9).
14. Connect the accelerator control damper (10).(Manual transmission vehicle)
15. Install the c

Page 667 of 1574

SSANGYONG MUSSO 2003  Service Manual 1G1-6  M162 ENGINE INTAKE & EXHAUST Removal & Installation Procedure 
�Upper Intake Manifold
1. Disconnect the vacuum hose (8,9). 
2. Loosen the clip (22).
3. Remove the upper intake manifold (5) afte