oil TOYOTA RAV4 2006 Service Repair Manual
[x] Cancel search | Manufacturer: TOYOTA, Model Year: 2006, Model line: RAV4, Model: TOYOTA RAV4 2006Pages: 2000, PDF Size: 45.84 MB
Page 558 of 2000

ES–342GR-FE ENGINE CONTROL SYSTEM – SFI SYSTEM
ES
TERMINALS OF ECM
1. CHECK ECM
(a) Measure the voltage of the ECM connector.
HINT:
The standard normal voltage between each pair of
ECM terminals is shown in the table below. The
appropriate conditions for checking each pair of
terminals are also indicated. The result of checks
should be compared with the standard normal
voltage for that pair of terminals, displayed in the
Specified Condition column. The illustration above
can be used as a reference to identify the ECM
terminal locations.
A107881E05
Symbol (Terminal No.) Wiring Color Terminal Description Condition Specified Condition
BATT (A9-20) - E1 (B30-81) W - BR Battery (for measuring
battery voltage and for
ECM memory)Always 9 to 14 V
+BM (A9-3) - E1 (B30-81) LG - BR Power source of throttle
actuatorAlways 9 to 14 V
IGSW (A9-28) - E1 (B30-81) B - BR Ignition switch Ignition switch ON 9 to 14 V
+B (A9-2) - E1 (B30-81) B - BR Power source of ECM Ignition switch ON 9 to 14 V
+B2 (A9-1) - E1 (B30-81) B - BR Power source of ECM Ignition switch ON 9 to 14 V
OC1+ (B30-58) - OC1- (B30-57) W - B Camshaft timing oil control
valve (OCV)Ignition switch ON Pulse generation (see
waveform 1)
OC2+ (B30-52) - OC2- (B30-51) BR - B Camshaft timing oil control
valve (OCV) (Intake side
(bank 2))Ignition switch ON Pulse generation
(see waveform 1)
OE1+ (B30-56) - OE1- (B30-55) R - LG Camshaft timing oil control
valve (OCV) (Exhaust side
(bank 1))Ignition switch ON Pulse generation
(see waveform 1)
OE2+ (B30-50) - OE2- (B30-49) W - B Camshaft timing oil control
valve (OCV) (Exhaust side
(bank 2))Ignition switch ON Pulse generation
(see waveform 1)
MREL (A9-44) - E1 (B30-81) O - BR EFI relay Ignition switch ON 9 to 14 V
VG (B30-72) - E2G (B30-73) GR - L-G Mass air flow meter Idling, Shift lever position P or N, A/
C switch OFF0.5 to 3.0 V
THA (B30-71) - ETHA (B30-74) P - G-R Intake air temperature
sensorIdling, Intake air temperature 20
C
(68F)0.5 to 3.4 V
Page 560 of 2000

ES–362GR-FE ENGINE CONTROL SYSTEM – SFI SYSTEM
ES
VV2+ (B30-67) - VV2- (B30-90) W - B Variable valve timing
(VVT) sensor (Intake side
(bank 2))Idling Pulse generation
(see waveform 5)
EV1+ (B30-68) - EV1- (B30-91) Y - G Variable valve timing
(VVT) sensor (Exhaust
side (bank 1))Idling Pulse generation
(see waveform 5)
EV2+ (B30-66) - EV2- (B30-89) R - L Variable valve timing
(VVT) sensor (Exhaust
side (bank 2))Idling Pulse generation
(see waveform 5)
NE+ (B30-110) - NE- (B30-111) G - R Crankshaft position sensor Idling Pulse generation (see
waveform 5)
IGT1 (B30-40) - E1 (B30-81)
IGT2 (B30-39) - E1 (B30-81)
IGT3 (B30-38) - E1 (B30-81)
IGT4 (B30-37) - E1 (B30-81)
IGT5 (B30-36) - E1 (B30-81)
IGT6 (B30-35) - E1 (B30-81)W - BR
G-R - BR
G - BR
LG - BR
P - BR
V - BRIgnition coil (ignition
signal)Idling Pulse generation (see
waveform 6)
IGF1 (B30-106) - E1 (B30-81) Y - BR Ignition coil (ignition
confirmation signal)Ignition switch ON 4.5 to 5.5 V
Idling Pulse generation (see
waveform 6)
PRG (B30-108) - E1 (B30-81) LG - BR Purge VSV Ignition switch ON 9 to 14 V
Idling Pulse generation (see
waveform 7)
SPD (A9-8) - E1 (B30-81) V - BR Speed signal from
combination meterDriving at 20 km/h (12 mph) Pulse generation (see
waveform 8)
STA (A9-48) - E1 (B30-81) LG - BR Starter signal Cranking 5.5 V or more
NSW (B30-62) - E1 (B30-81) G-R - BR Starter relay control Ignition switch ON Below 1.5 V
Cranking 6.0 V or more
STP (A9-36) - E1 (B30-81) L - BR Stop light switch Brake pedal depressed 7.5 to 14 V
Brake pedal released Below 1.5 V
ST1- (A9-35) - E1 (B30-81) GR - BR Stop light switch
(opposite to STP terminal)Ignition switch ON,
Brake pedal depressedBelow 1.5 V
Ignition switch ON,
Brake pedal released7.5 to 14 V
M+ (B30-19) - ME01 (B30-20) G - BR Throttle actuator Idling with warm engine Pulse generation (see
waveform 9)
M- (B30-18) - ME01 (B30-20) R - BR Throttle actuator Idling with warm engine Pulse generation (see
waveform 10)
FC (A9-7) - E1 (B30-81) W - BR Fuel pump control Ignition switch ON 9 to 14 V
Idling Below 1.5 V
FPR (B30-59) - E1 (B30-81) W - BR Fuel pump control Cranking 9 to 14 V
FPR (B30-59) - E1 (B30-81) W - BR Fuel pump control Idling 9 to 14 V
W (A9-24) - E1 (B30-81) R - BR MIL Ignition switch ON Below 1.5 V
Idling 9 to 14 V
TC (A9-27) - E1 (B30-81) G - BR Terminal TC of DLC3 Ignition switch ON 9 to 14 V
TACH (A9-15) - E1 (B30-81) GR - BR Engine speed Idling Pulse generation (see
waveform 11)
VPMP (A9-42) - E1 (B30-81) W - BR Vent valve (built into
canister pump module)Ignition switch ON 9 to 14 V
MPMP (A9-34) - E1 (B30-81) B - BR Leak detection pump (built
into canister pump
module)Leak detection pump OFF Below 3 V
Leak detection pump ON 9 to 14 V
VCPP (B30-75) - EPPM (B30-76) V - BR Power source for canister
pressure sensor (specific
voltage)Ignition switch ON 4.5 to 5.5 V Symbol (Terminal No.) Wiring Color Terminal Description Condition Specified Condition
Page 561 of 2000

2GR-FE ENGINE CONTROL SYSTEM – SFI SYSTEMES–37
ES
HINT:
*: The ECM terminal voltage is constant regardless
of the output voltage from the sensor.
(b) WAVEFORM 1
Camshaft timing oil control valve (OCV)
PPMP (B30-77) - EPPM (B30-76) L - BR Canister pressure sensor
(built into canister pump
module)Ignition switch ON 3 to 3.6 V
ELS (A9-31) - E1 (B30-81) O - BR Electric load Taillight switch ON7.5 to 14 V
Taillight switch OFF Below 1.5 V
ELS2 (A9-33) - E1 (B30-81) G - BR Electric load Defogger switch ON7.5 to 14 V
Defogger switch OFF Below 1.5 V
ALT (B30-32) - E1 (B30-81) P - BR Generator Ignition switch ON 9 to 14 V
CANH (A9-41) - E1 (B30-81) Y - BR CAN communication line Ignition switch ON Pulse generation (see
waveform 12)
CANL (A9-49) - E1 (B30-81) W - BR CAN communication line Ignition switch ON Pulse generation (see
waveform 13)
VCIB (B30-80) - EIB (B30-101) LG - P Battery current sensor Ignition switch ON 4.5 to 5.5 V
IB (B30-100) - EIB (B30-101) R - P Battery current sensor Ignition switch ON 0.5 to 2.5 V
THB (B30-103) - EIB (B30-101) G-R - P Battery temperature
sensorIgnition switch ON, battery
temperature -30 to 80
C (-22 to
176
F)0.5 to 4.5 V
RLO (B30-31) - E1 (B30-81) Y - BR Generator After engine warmed up, during
charging control, vehicle driven at
constant speedPulse generation (see
waveform 14)
RLO (B30-31) - E1 (B30-81) Y - BR Generator After engine warmed up, during
charging control, vehicle
acceleratedPulse generation (see
waveform 15)
RLO (B30-31) - E1 (B30-81) Y - BR Generator After engine warmed up, during
charging control, vehicle
deceleratedPulse generation (see
waveform 16)
AICV (A9-4) - E1 (B30-81) L - BR VSV for air intake control
system operation signalIgnition switch ON 9 to 14 V
ACIS (B30-107) - E1 (B30-81) R - BR VSV for ACIS (Acoustic
Control Induction System)
operation signalIgnition switch ON 9 to 14 V Symbol (Terminal No.) Wiring Color Terminal Description Condition Specified Condition
A093229E02
Symbol (Terminal No.) Between OC1+ and OC1-
Between OC2+ and OC2-
Between OE1+ and OE1-
Between OE2+ and OE2-
Tester Range 5 V/DIV., 1 msec./DIV.
Condition Idling
Page 579 of 2000

EM–222AZ-FE ENGINE MECHANICAL – TIMING CHAIN
EM
REMOVAL
1. DISCONNECT CABLE FROM NEGATIVE BATTERY
TERMINAL
CAUTION:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery terminal to
prevent airbag and seat belt pretensioner activation.
2. REMOVE RADIATOR SUPPORT OPENING COVER
3. REMOVE FRONT WHEEL RH
4. REMOVE NO. 1 ENGINE UNDER COVER
5. REMOVE FRONT FENDER APRON RH
6. REMOVE NO. 1 ENGINE COVER
(a) Remove the 2 nuts and cover.
7. DRAIN ENGINE OIL (See page LU-4)
8. REMOVE FRONT EXHAUST PIPE (See page EX-3)
9. REMOVE FRONT SUSPENSION MEMBER
REINFORCEMENT RH (See page EM-6)
10. REMOVE FAN AND GENERATOR V BELT (See page
EM-6)
11. REMOVE GENERATOR ASSEMBLY (See page CH-9)
12. REMOVE RADIATOR RESERVOIR
(a) Remove the 2 bolts and radiator reservoir.
13. REMOVE ENGINE MOUNTING INSULATOR RH
(a) Remove the bolt of the wire harness protector.
(b) Disconnect the 2 clamps of the engine wire.
A112206
A124838
A098189E02
Page 580 of 2000

2AZ-FE ENGINE MECHANICAL – TIMING CHAINEM–23
EM
(c) Place a transmission jack underneath the engine,
then put a wooden block on the jack.
(d) Remove the 4 bolts, 2 nuts and engine mounting
insulator RH.
NOTICE:
Do not apply excessive force to the return tube
when removing the engine mounting insulator
RH.
HINT:
Keep clearance by lowering the engine using the
transmission jack when removing the engine
mounting insulator FR.
14. REMOVE ENGINE MOUNTING INSULATOR FR
(a) Remove the through bolt and nut.
(b) Remove the 2 bolts and engine mounting insulator
FR.
HINT:
Keep clearance by lowering the engine using the
transmission jack when removing the engine
mounting insulator FR.
15. REMOVE IDLER PULLEY
(a) Loosen the 2 bolts and remove the idler pulley with
the 2 bolts.
16. REMOVE IGNITION COIL ASSEMBLY (See page IG-9)
17. REMOVE SPARK PLUG (See page EM-8)
A061184E04
A124843
A124839E02
A124840
A114359
Page 581 of 2000

EM–242AZ-FE ENGINE MECHANICAL – TIMING CHAIN
EM
18. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY
(a) Disconnect the 2 ventilation hoses form the cylinder
head cover.
(b) Remove the 2 bolts and disconnect the 2 engine
wires.
(c) Remove the 8 bolts, 2 nuts and cylinder head cover.
19. REMOVE OIL PAN SUB-ASSEMBLY
(a) Install the No. 1 and No. 2 engine hangers with the
bolts.
Torque: 38 N*m (387 kgf*cm, 28 ft.*lbf)
Part No.
(b) Attach the sling device to the engine hangers and
chain block.
A112209
A112210E01
A112211
A112213E01
Item Part No.
No. 1 engine hanger 12281-28010
No. 2 engine hanger 12282-28010
Bolt 91512-61020
Page 582 of 2000

2AZ-FE ENGINE MECHANICAL – TIMING CHAINEM–25
EM
(c) Remove the 12 bolts and 2 nuts.
(d) Insert the blade of SST between the crankcase,
chain cover and oil pan, then cut off the applied
sealer and remove the oil pan.
SST 09032-00100
NOTICE:
Be careful not to damage the contact surface of
the crankcase, chain cover and oil pan.
20. SET NO. 1 CYLINDER TO TDC/COMPRESSION
(a) Turn the crankshaft pulley until its groove and the
timing mark "0" of the timing chain cover are
aligned.
(b) Check that each timing mark of the camshaft timing
gear and sprocket is aligned with each timing mark
located on the No. 1 and No. 2 bearing caps as
shown in the illustration.
If not, turn the crankshaft by 1 revolution (360
) to
align the timing marks as above.
21. REMOVE CRANKSHAFT PULLEY
(a) Using SST, fix the pulley in place and loosen the
pulley bolt.
SST 09213-54015 (91651-60855), 09330-00021
A114333
A000019E05
A098345E09
A013697E02
Page 586 of 2000

2AZ-FE ENGINE MECHANICAL – TIMING CHAINEM–29
EM
33. REMOVE NO. 2 CHAIN SUB-ASSEMBLY
(a) Turn the crankshaft by 90
counterclockwise to align
the adjusting hole of the oil pump drive shaft
sprocket with the groove of the oil pump.
(b) Insert a 4 mm diameter bar into the adjusting hole of
the oil pump drive shaft sprocket to lock the gear in
position, and then remove the nut.
(c) Remove the bolt, chain tensioner plate and spring.
(d) Remove the oil pump drive sprocket, oil pump drive
shaft sprocket and No. 2 chain.
INSPECTION
1. INSPECT NO. 1 CHAIN TENSIONER
(a) Check that the plunger moves smoothly when the
ratchet pawl is raised with your finger.
(b) Release the ratchet pawl, then check that the
plunger is locked in place by the ratchet pawl and
does not move when pushed with your finger.
A098351E01
A098352E01
B011415E03
A098357E01
Page 588 of 2000

2AZ-FE ENGINE MECHANICAL – TIMING CHAINEM–31
EM
If the gear diameter is less than the minimum,
replace the chain sub-assembly and crankshaft
timing sprocket.
7. INSPECT OIL PUMP DRIVE SPROCKET
(a) Wrap the chain around the drive sprocket.
(b) Using a vernier caliper, measure the drive gear
diameter with the chain.
Minimum gear diameter (with chain):
48.2 mm (1.898 in.)
NOTICE:
The vernier caliper must be in contact with the
chain rollers when measuring.
If the gear diameter is less than the minimum,
replace the No. 2 chain sub-assembly and oil pump
drive sprocket.
8. INSPECT OIL PUMP DRIVE SHAFT SPROCKET
(a) Wrap the chain around the drive shaft sprocket.
(b) Using a vernier caliper, measure the drive shaft gear
diameter with the chain.
Minimum gear diameter (with chain):
48.2 mm (1.898 in.)
NOTICE:
The vernier caliper must be in contact with the
chain rollers when measuring.
If the gear diameter is less than the minimum,
replace the No. 2 chain sub-assembly and oil pump
drive shaft sprocket.
REPLACEMENT
1. REPLACE TIMING CHAIN COVER OIL SEAL
(a) Using a screwdriver and hammer, tap out the oil
seal.
(b) Place the oil seal retainer on wooden blocks.
(c) Apply multi-purpose grease to the lip of a new oil
seal.
NOTICE:
Keep the lip free of foreign objects.
(d) Using SST and a hammer, tap in a new oil seal until
its surface is flush with the timing gear case edge.
SST 09223-22010
NOTICE:
Do not tap the oil seal at an angle.
A053035E01
A053036E01
A032626E01
A094547E01
Page 589 of 2000

EM–322AZ-FE ENGINE MECHANICAL – TIMING CHAIN
EM
INSTALLATION
1. INSTALL NO. 2 CHAIN SUB-ASSEMBLY
(a) Set the crankshaft key in the left horizontal position.
(b) Turn the cutout of the drive shaft so that it faces
upward.
(c) Align the yellow mark links with the timing marks of
each gear as shown in the illustration.
(d) Install the sprockets onto the crankshaft and oil
pump shaft with the chain wrapped on the gears.
(e) Temporarily tighten the oil pump drive shaft sprocket
with the nut.
(f) Insert the damper spring into the adjusting hole, and
then install the chain tensioner plate with the bolt.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
(g) Align the adjusting hole of the oil pump drive shaft
sprocket with the groove of the oil pump.
(h) Insert a 4 mm diameter bar into the adjusting hole of
the oil pump drive shaft gear to lock the gear in
position, and then tighten the nut.
Torque: 29.5 N*m (301 kgf*cm, 22 ft.*lbf)
B011424E01
A094198E06
A090851E03
A098352E01