battery fuse ASTON MARTIN V8 VANTAGE 2010 User Guide

Page 259 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-11
23. Install VVT solenoid multiplug, position coil and CMP
harness (1x edge clip).
24. Install corner cross brace (t orque bolts with vehicle on
level ground).
25. Install coil cover.
Installation LH Side
26. Connect breather hose to manifold (quickfit).
27. Connect IAT multiplug.
28. Install injector harness to cam cover (x2).
29. Connect injector multiplugs (x4).
30. Install pipe support bracket (nuts x2, bolts x2).
31. Install harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
32. Connect booster hose to manifold and support clip.
33. Connect heater hose from pipe (quick fit).
34. Install heater hose (x2) and throttle body hose (x2) from support bracket.
35. Connect purge line to mani fold and into support clip.
36. Connect breather hoses (x2) to cam cover.
37. Feed harness into inner wing area.
38. Install fusebox to bracket.
39. Install earth lead to fusebox.
40. Install battery lead to fusebox (1x nut and rubber cover).
41. Install multiplugs to fuse box.
42. Install fusebox bracket fixings.
43. Install ECM (see Workshop Manual procedure 03.13.ND Module - Powe r Train Control - RHD -
Renew)
44. Install coil cover.
45. Refill coolant (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
46. Install cross brace. (torque bolts with vehicle on level
ground).
Intake Manifold Assembly - Remove for
Access and Refit (With Engine Removed
)
Removal
1. Remove RH coil cover.
2. Disconnect breather hose (quick fit).
3. Release alternator and injector harness fir tree clips (x3) from cylinder head.
4. Remove nut and bolts (x2) securing harness bracket to
engine, remove bracket.
5. Release heater hose (clips x2) and EGR vacuum line (clips x2) from bracket.
6. Release alternator and injector harness fir tree clips (x3) from coolant pipe bracket. 7. Disconnect multiplugs from EGR valve, fuel rail pressure
sensor and injectors (x4).
8. Remove nuts (x2) and bolts (x2) securing coolant pipe
bracket, remove bracket.
9. Disconnect EGR vacuum pipe from sensor and manifold.
10. Remove LH coil cover.
11. Disconnect breather hoses (x2) from LH engine cover.
12. Disconnect purge line from manifold (quickfit) and
support clip for access.
13. Disconnect heater hose from pipe (quick fit).
14. Release heater hose (x2) and throttle body hose (x2) from support bracket.
15. Remove bolt and nuts (x2) securing harness support bracket, release harness clips (fir tree x3). Remove
bracket.
16. Remove nuts (x2) and bolts (x2) pipe support bracket.
17. Disconnect injector multiplugs (x4).
18. Release injector harness clip s (x2) from LH engine cover.
19. Disconnect IAT multiplug.
20. Disconnect breather hose from manifold (quickfit).
21. Disconnect manifold heating hoses (x2).
22. Disconnect throttle body multiplug and harness clip.
23. Disconnect EGR vacuum hose.
24. Loosen and disconnect EGR pipe union from EGR valve.
25. Remove bolts (x2) securing EGR pipe to RH exhaust
manifold, remove pi pe, discard gasket.
26. Progressively loosen and remove bolts (x 10) securing intake manifold to cylinder heads (see Figure 1).
Figure 1
27. Carefully remove intake ma nifold from cylinder heads.
28. Remove and discard gaskets (x2).
Installation
1. Clean intake manifold and mating faces on cylinder heads.
2. Install new gaskets to cyli nder block (glue in place).
3. Install intake manifold (allowing access to install bolt for purge line P-clip).
4. Install and torque tighten in take manifold bolts (x10) in
the correct sequence.
5. Clean EGR pipe and mating face on exhaust manifold.
Repair Operation Time (ROT)
A030113

Page 308 of 947

Fuel Charging System (03.04)
Engine (03.00)3-4-2 Workshop Manual May 2007
Maintenance
Fuel Rails - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure
10.01.EK Fuel System - Depressurise).
2. Coolant drain (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
3. Remove cross brace (bolts x4).
Removal RH Side
4. Remove coil cover.
5. Disconnect breather hose (quick fit) move aside.
6. Release harness fir tree clips (x3) from cylinder head and move aside.
7. Remove fuse box bracket fixings (bolt and nut) (allows movement).
8. Remove ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).
9. Remove battery lead (1x nu t and rubber cover) from
fuse box (2x leads).
10. Remove multiplugs (x10) from fusebox.
11. Remove earth terminal (1x nut and rubber cover) from fusebox.
12. Remove fuse box from bracket (bolt x2).
13. Release harness fir tree clips (x3) from engine bracket.
14. Feed harness from inner wing and over engine to gain access to cam cover.
15. Remove purge pipe P-clip (bolt x1) and move pipe
aside.
16. Remove harness bracket from engine (bolts x2, nut x1).
17. Release fuel feed hose from rail (clip x1) and move aside.
18. Disconnect heater hose from pipe (quick fit).
19. Release heater hose (clips x2) and EGR vacuum line (clips x2) from bracket.
20. Release harness from coolant pipe bracket (fir tree x3).
21. Disconnect EGR (x1), fuel rail pressure sensor (x1) and injector multiplugs (x4), move harness aside.
22. Remove coolant pipe bracket (nuts x2 and bolts x2).
23. Disconnect EGR vac pipe from sensor and manifold, move aside.
Removal LH Side
24. Remove corner cross brace.
25. Remove coil cover.
26. Disconnect breather hoses from cam cover (x2) for access.
27. Disconnect purge line from manifold (quickfit) and support clip for access. 28. Disconnect heater hose
from pipe (quick fit).
29. Release heater hose (x2) and throttle body hose (x2) from support bracket.
30. Remove booster hose from manifold and support clip.
31. Remove harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
32. Release pipe support bracket (nuts x2, bolts x2) move aside.
33. Disconnect injector multiplugs (x4).
34. Unclip injector harness from cam cover (x2).
35. Disconnect IAT multiplug.
36. Disconnect breather hose from manifold (quickfit).
Removal - Manifold From Vehicle
37. Disconnect manifold heating hoses (x2).
38. Disconnect throttle body multiplug and harness clip.
39. Disconnect breather pipe qu ickfits (x2) from air cleaner
duct.
40. Disconnect air cleaner duct (clip x1).
41. Disconnect EGR vacuum hose.
42. Disconnect EGR pipe union and tie aside.
43. Remove manifold bolts (x 10).
44. Remove bolts (x2) bracket to manifold (rear).
45. Move manifold (2x people) forward, remove bolt for purge line T-clip, remove manifold.
46. Remove gaskets and clean mating faces.
Removal - Manifold Parts
47. Remove Injector to rail clips (x8) (see Figure 1).
Figure 1
48. Remove fuel rail (bolts x4).
Installation
1. Install clips and new O-rings to injectors.
2. Install fuel rail (bolts x4).
Repair Operation Time (ROT)
WAR NI NG
THE INTAKE MANIFOLD IS HEAVY. TO AVOID
PERSONAL INJURY OR DAMAGE TO THE INTAKE MANIFOLD, INTAKE MANIFOLD REMOVAL /
ISTALLATION IS A TWO PERSON OPERATION.
A030113

Page 309 of 947

Fuel Charging System (03.04)
Engine (03.00)
May 2007 Workshop Manual 3-4-3
Installation Manifold to Vehicle
3. Install new gaskets to cylinder block (glue in place).
4. Install manifold (allowing access to install bolt for purge
line P-clip).
5. Install manifold bolts (x10) (torque and tightening sequence).
6. Install bolts (x2) bracket to manifold (rear).
7. Connect EGR pipe union.
8. Connect EGR vacuum hose.
9. Connect air cleaner duct (clip x1).
10. Connect breather pipe quickf its (x2) to air cleaner duct.
11. Connect throttle body multiplug and harness clip.
12. Connect manifold heating hoses (x2).
Installation RH Side
13. Connect EGR vac pipe to sensor and manifold.
14. Install coolant pipe bracket (bolt x2, nut x2).
15. Connect EGR (x1), fuel rail pressure sensor (x1) and
injector multiplugs (x4).
16. Refit harness to coolant pipe bracket (fir tree x3).
17. Connect heater hose to pipe (quick fit).
18. Refit heater hose (clipx2) and EGR vacuum lines (clips x2) to bracket.
19. Install fuel feed pipe.
20. Install purge pipe P-clip.
21. Install harness bracket to engine.
22. Feed harness into inner wing area.
23. Install fusebox to bracket.
24. Install earth lead to fusebox.
25. Install battery lead to fusebox (1x nut and rubber cover).
26. Install multiplugs to fuse box.
27. Install fusebox bracket fixings.
28. Refit harness fir tree clips to cylinder head.
29. Refit engine breather hose.
30. Install VVT solenoid multip lug, position coil and CMP
harness (1x edge clip).
31. Install ECM (see Workshop Manual procedure 03.14.BB XREF: 319 Engine Control Module - RH Renew
32. Install coil cover.
Installation LH Side
33. Connect breather hose to manifold (quickfit).
34. Connect IAT multiplug.
35. Unclip injector harness from cam cover (x2).
36. Connect injector multiplugs (x4).
37. Install pipe support bracket (nuts x2, bolts x2).
38. Install harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
39. Connect booster hose to manifold and support clip. 40. Connect heater hose from pipe (quick fit).
41. Install heater hose (x2) and throttle body hose (x2) from
support bracket.
42. Connect purge line to manifold and into support clip.
43. Connect breather hoses (x2) to cam cover.
44. Install coil cover.
45. Install corner cross brace (t orque bolts with vehicle on
level ground).
46. Refill coolant (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
47. Install cross brace (torque bolts with vehicle on level
ground).
Fuel Injection Pressure Sensor - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Disconnect vacuum hose.
3. Remove sensor from fuel rail (bolts x2).
4. Disconnect multiplug.
Installation
1. Install sensor to fuel rail (bolts x2) (torque).
2. Connect multiplug.
3. Connect vacuum hose.
Fuel Temperature Sensor - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Disconnect vacuum hose.
3. Remove sensor from fuel rail (bolts x2).
4. Disconnect multiplug.
Installation
1. Install sensor to fuel rail (bolts x2) (torque).
2. Connect multiplug.
3. Connect vacuum hose.
WA R N I N G
THE INTAKE MANIFOLD IS HEAVY. TO AVOID
PERSONAL INJURY OR DAMAGE TO THE INTAKE MANIFOLD, INTAKE MANIFOLD REMOVAL /
ISTALLATION IS A TWO PERSON OPERATION.
Installation Not Handed
Repair Operation Time (ROT)
Repair Operation Time (ROT)

Page 310 of 947

Fuel Charging System (03.04)
Engine (03.00)3-4-4 Workshop Manual May 2007
Fuel Injector Engine Set - Renew
Removal
1. Remove LH injectors (see Workshop Manual procedure
03.04.GH Injector - Fuel - LH Bank - Engine Set -
Renew).
2. Remove coils (see Work shop Manual procedure
03.07.HC Coil Assembly - Engine Set - RH - Renew).
3. Disconnect breather hose (quick fit) move aside.
4. Release harness fir tree clips (x3) from cylinder head and move aside.
5. Remove fuse box bracket fixings (bolt and nut) (allows movement).
6. Remove ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).
7. Remove battery lead (1x nu t and rubber cover) from
fuse box (2x leads).
8. Remove multiplugs (x10) from fusebox.
9. Remove earth terminal (1x nut and rubber cover) from
fusebox.
10. Remove fuse box from bracket (bolt x2).
11. Release harness fir tree clips (x3) from engine bracket.
12. Feed harness from inner wing and over engine to gain access to cam cover.
13. Remove purge pipe P-clip (bolt x1) and move pipe
aside.
14. Remove harness bracket from engine (bolts x2, nut x1).
15. Release fuel feed hose from rail (clip x1) and move aside.
16. Disconnect heater hose from pipe (quick fit).
17. Release heater hose (clips x2) and EGR vacuum line (clips x2) from bracket.
18. Release harness from coolant pipe bracket (fir tree x3).
19. Disconnect EGR (x1), fuel rail pressure sensor (x1) and injector multiplugs (x4), move harness aside.
20. Remove coolant pipe bracket (nuts x2 and bolts x2).
21. Disconnect EGR vac pipe from sensor and manifold, move aside. 22. Remove Injector to rail clips (see Figure 1).
Figure 1
23. Remove fuel rail bolts (x2) and lift rail (tie aside) (see
Figure 2).
Figure 2
24. Remove injectors from manifold.
Installation
1. Install clips on to new injectors then fit injectors into manifold.
2. Install rail onto injectors (taking care each injector is aligned correctly and the clip seats properly) and fit bolts
(x2) (torque).
3. Connect EGR vac pipe to sensor and manifold.
4. Install coolant pipe bracket (bolt x2, nut x2).
5. Connect EGR (x1), fuel rail pressure sensor (x1) and
injector multiplugs (x4).
6. Refit harness to coolant pipe bracket (fir tree x3).
7. Connect heater hose to pipe (quick fit).
8. Refit heater hose (clipx2) and EGR vac lines (clips x2) to bracket.
9. Install fuel feed pipe.
10. Install purge pipe P-clip.
11. Install harness bracket to engine.
12. Feed harness into inner wing area.
13. Install fusebox to bracket.
14. Install earth lead to fusebox.
15. Install battery lead to fusebox (1x nut and rubber cover).
16. Install multiplugs to fuse box.
Repair Operation Time (ROT)
A030452
A030113A

Page 311 of 947

Fuel Charging System (03.04)
Engine (03.00)
May 2007 Workshop Manual 3-4-5
17. Install fusebox bracket fixings.
18. Refit harness fir tree clips to cylinder head.
19. Refit engine breather hose.
20. Install VVT solenoid multiplug, position coil and CMP
harness (1x edge clip).
21. Install LH injectors (see Workshop Manual procedure
03.04.GH Injector - Fuel - LH Bank - Each - Renew).
22. Install ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).
1. Install coils (see Workshop Manual procedure 03.07.HC
Coil Assembly - Engine Set - RH - Renew).
Fuel Injector - Each - LH Bank - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Remove corner cross brace.
3. Disconnect breather hoses from cam cover (x2) for access.
4. Disconnect purge line from manifold (quickfit) and support clip for access.
5. Disconnect heater hose from pipe (quick fit).
6. Release heater hose (x2) and throttle body hose (x2) from support bracket.
7. Remove booster hose from manifold and support clip.
8. Remove harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
9. Release pipe support bracket (nuts x2, bolts x2) move aside.
10. Disconnect IAT multiplug.
11. Disconnect injector multiplugs (x4).
12. Unclip injector harness from cam cover (x2).
13. Disconnect breather hose from manifold (quickfit).
14. Remove Injector to rail clip (for injector to be changed).
15. Remove fuel rail bolts (x2) and lift rail with remaining injectors (tie aside).
16. Remove injector from manifold.
Installation
1. Install new O-rings to remaining injectors (lube O-rings).
2. Install clip to new injector then injector into rail.
3. Install rail (with injectors) to manifold (bolt x2) (torque) (taking care each injector is aligned correctly).
4. Connect breather hose to manifold (quickfit).
5. Connect IAT multiplug.
6. Unclip injector harness from cam cover (x2).
7. Connect injector multiplugs (x4).
8. Install pipe support br acket (nuts x2, bolts x2). 9. Install harness support bracket (bolt x1, nut x2) release
harness clips (fir tree x3).
10. Connect booster hose to manifold and support clip.
11. Connect heater hose from pipe (quick fit).
12. Install heater hose (x2) and throttle body hose (x2) from support bracket.
13. Connect purge line to manifold and into support clip.
14. Connect breather hoses (x2) to cam cover.
15. Install corner cross brace (t orque bolts with vehicle on
level ground).
Fuel Injector - Each - RH Bank - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Disconnect breather hose (quick fit) move aside.
3. Release harness fir tree clips (x3) from cylinder head and move aside.
4. Remove fuse box bracket fi xings (bolt and nut) (allows
movement).
5. Remove ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).
6. Remove battery lead (1x nut and rubber cover) from fuse box (2x leads).
7. Remove multiplugs (x10) from fusebox.
8. Remove earth terminal (1x nut and rubber cover) from fusebox.
9. Remove fuse box from bracket (bolt x2).
10. Release harness fir tree clips (x3) from engine bracket.
11. Feed harness from inner wing and over engine to gain access to cam cover.
12. Remove purge pipe P-clip (bolt x1) and move pipe aside.
13. Remove harness bracket from engine (bolts x2, nut x1).
14. Release fuel feed hose from rail (clip x1) and move aside.
15. Disconnect heater hose from pipe (quick fit).
16. Release heater hose (clips x2) and EGR vacuum line
(clips x2) from bracket.
17. Release harness from coolan t pipe bracket (fir tree x3).
18. Disconnect EGR (x1), fuel rail pressure sensor (x1) and injector multiplugs (x4), move harness aside.
19. Remove coolant pipe bracket (nuts x2 and bolts x2).
20. Disconnect EGR vac pipe from sensor and manifold, move aside.
21. Remove Injector to rail clip (for injector to be changed).
22. Remove fuel rail bolts (x2) and lift rail with remaining injectors (tie aside).
23. Remove injector from manifold.
Repair Operation Time (ROT)
Repair Operation Time (ROT)

Page 312 of 947

Fuel Charging System (03.04)
Engine (03.00)3-4-6 Workshop Manual May 2007
Installation
1. Install new O-rings to remaining injectors (lube O-ringP-
clips).
2. Install clip to new injector then injector into rail.
3. Install rail (with injectors) to manifold (bolt x2) (torque)
(taking care each injector is aligned correctly).
4. Connect EGR vac pipe to sensor and manifold.
5. Install coolant pipe bracket (bolt x2, nut x2).
6. Connect EGR (x1), fuel rail pressure sensor (x1) and injector multiplugs (x4).
7. Refit harness to coolant pipe bracket (fir tree x3).
8. Connect heater hose to pipe (quick fit).
9. Refit heater hose (clipx2) and EGR vacuum lines (clips
x2) to bracket.
10. Install fuel feed pipe.
11. Install purge pipe P-clip.
12. Install harness bracket to engine.
13. Feed harness into inner wing area.
14. Install fusebox to bracket.
15. Install earth lead to fusebox.
16. Install battery lead to fusebox (1x nut and rubber cover).
17. Install multiplugs to fuse box.
18. Install fusebox bracket fixings.
19. Refit harness fir tree clips to cylinder head.
20. Refit engine breather hose.
21. Install VVT solenoid multiplug, position coil and CMP harness (1x edge clip).
22. Install ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).
Engine Set - Fuel Injector - LH Bank -
Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Remove corner cross brace.
3. Disconnect breather hoses from cam cover (x2) for access.
4. Disconnect purge line from manifold (quickfit) and
support clip for access.
5. Disconnect heater hose from pipe (quick fit).
6. Release heater hose (x2) and throttle body hose (x2)
from support bracket.
7. Remove booster hose from manifold and support clip.
8. Remove harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3). 9. Release pipe support bracket
(nuts x2, bolts x2) move
aside.
10. Disconnect IAT multiplug.
11. Disconnect injector multiplugs (x4).
12. Unclip injector harness from cam cover (x2).
13. Disconnect breather hose from manifold (quickfit).
14. Remove Injector to rail clips.
15. Remove fuel rail bolts (x2) and lift rail (tie aside).
16. Remove injectors from manifold.
Installation
1. Install clips on to new injectors then fit injectors into manifold.
2. Install rail onto injectors (taking care each injector is aligned correctly and the clip seats properly) and fit bolts
(x2) (torque).
3. Connect breather hose to manifold (quickfit).
4. Connect IAT multiplug.
5. Unclip injector harness from cam cover (x2).
6. Connect injector multiplugs (x4).
7. Install pipe support bracket (nuts x2, bolts x2).
8. Install harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
9. Connect booster hose to manifold and support clip.
10. Connect heater hose from pipe (quick fit).
11. Install heater hose (x2) and throttle body hose (x2) from support bracket.
12. Connect purge line to manifold and into support clip.
13. Connect breather hoses (x2) to cam cover.
14. Install corner cross brace (torque bolts with vehicle on level ground).
Engine Set - Fuel Injector - RH Bank -
Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise
2. Disconnect breather hose (quick fit) move aside.
3. Release harness fir tree clips (x3) from cylinder head and move aside.
4. Remove fuse box bracket fixings (bolt and nut) (allows movement).
5. Remove ECM (see Workshop Manual procedure 03.14.BB Engine Contro l Module - RH Renew).
6. Remove battery lead (1x nut and rubber cover) from fuse box (2x leads).
7. Remove multiplugs (x10) from fusebox.
Repair Operation Time (ROT)
Repair Operation Time (ROT)
ItemCode
Engine Set-Fuel Injector-RH Bank-
Renew LHD
03.04.GK
Engine Set-Fuel Injector-RH Bank-
Renew RHD
03.04.GP

Page 313 of 947

Fuel Charging System (03.04)
Engine (03.00)
May 2007 Workshop Manual 3-4-7
8. Remove earth terminal (1x nut and rubber cover) from
fusebox.
9. Remove fuse box from bracket (bolt x2).
10. Release harness fir tree clips (x3) from engine bracket.
11. Feed harness from inner wing and over engine to gain access to cam cover.
12. Remove purge pipe P-clip (bolt x1) and move pipe aside.
13. Remove harness bracket from engine (bolts x2, nut x1).
14. Release fuel feed hose from rail (clip x1) and move aside.
15. Disconnect heater hose from pipe (quick fit).
16. Release heater hose (clips x2) and EGR vacuum line (clips x2) from bracket.
17. Release harness from coolant pipe bracket (fir tree x3).
18. Disconnect EGR (x1), fuel ra il pressure sensor (x1) and
injector multiplugs (x 4), move harness aside.
19. Remove coolant pipe bracket (nuts x2 and bolts x2).
20. Disconnect EGR vac pipe from sensor and manifold,
move aside.
21. Remove Injector to rail clips.
22. Remove fuel rail bolts (x2) and lift rail (tie aside).
23. Remove injectors from manifold.
Installation
1. Install clips on to new injectors then fit injectors into manifold.
2. Install rail onto injectors (taking care each injector is aligned correctly and the clip seats properly) and fit bolts
(x2) (torque).
3. Connect EGR vac pipe to sensor and manifold.
4. Install coolant pipe bracket (bolt x2, nut x2).
5. Connect EGR (x1), fuel rail pressure sensor (x1) and
injector multiplugs (x4).
6. Refit harness to coolant pipe bracket (fir tree x3).
7. Connect heater hose to pipe (quick fit).
8. Refit heater hose (clipx2) and EGR vac lines (clips x2) to bracket.
9. Install fuel feed pipe.
10. Install purge pipe P-clip.
11. Install harness bracket to engine.
12. Feed harness into inner wing area.
13. Install fusebox to bracket.
14. Install earth lead to fusebox.
15. Install battery lead to fusebox (1x nut and rubber cover).
16. Install multiplugs to fuse box.
17. Install fusebox bracket fixings.
18. Refit harness fir tree clips to cylinder head.
19. Refit engine breather hose.
20. Install VVT solenoid multip lug, position coil and CMP
harness (1x edge clip).
21. Install ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH Renew).

Page 572 of 947

Silencer Assembly (09.01)
Exhaust (09.00)
Issue 5, January 2010 Workshop Manual 9-1-7
11. Position suitable lifter to support weight of silencer.
With assistance, remove silencer.
12. Remove both rear rubber mountings and hanger brackets from silencer.
Installation
1. Clean silencer and mating faces on rear pipes and stub pipes.
2. Install both rear rubber mountings and hanger brackets to silencer.
3. Position silencer on lifter . Install silencer, position
hangers, install and tighten bolts (x4).
4. Install front mountings to silencer, install and tighten bolts (x4).
5. Align silencer to rear pipes. Install springs (x4), and torque tighten bolts (x4).
6. Install and align stub pipes (x2) to silencer and trims in bumper. Align and tighten clamp bolts.
7. Check silencer to rear pipes for correct alignment and clearances.
8. Install stub pipes (x2), insta ll clamps (x2), centralise stub
pipes to exhaust trim finisher, torque tighten clamp nuts
(x2).
9. Check silencer to rear pipes for correct alignment and clearances.
10. Connect lines to both by-pass vacuum valves.
11. Install rear bumper diffuse r. Install and tighten Allen
bolts (x4).
12. Roadster Only - Install RH rear wheel arch liner (refer to
Workshop Manual procedure 01.02.HB Wheel Arch
Liner - Rear - RH - Renew).
13. Roadster Only - Install LH rear wheel arch liner.
14. Coupe Only - Install rear undertray (refer to Workshop
Manual procedure 01.02.PB Undertray - Rear - Renew).
15. Lower vehicle on ramp.
Exhaust Rear Silencer Mounting Rubber-
Renew
Removal
1. Raise vehicle on ramp. 2. Remove Allen bolts (x4), bumper diffuser to mounting
brackets. Remove diffuser, collect mounting brackets.
3. Remove bolts (x2), securing silencer rear hanger brackets to body.
4. Release/remove rubber mounting and hanger bracket from silencer bracket.
5. Remove rubber mounting from hanger bracket.
Installation
1. To aid assembly, apply liquid soap to rubber mounting .
2. Install rubber mounting on hanger bracket.
3. Install rubber mounting on muffler bracket.
4. Align hanger bracket to body, install and torque tighten bolts (x2).
5. Position mounting brackets, install bumper diffuser, install and torque tighten Allen bolts (x4).
6. Lower vehicle on ramp.
Exhaust System-Renew
1. Disconnect vehicle battery.
2. Raise vehicle on ramp.
3. Remove RH exhaust manifold.
4. Remove RH front wheel arch liner (refer to Workshop Manual procedure 01.02.GB Wheel Arch Liner - Front -
RH - Renew).
5. Remove LH front wheel arch liner (refer to Workshop
Manual procedure 01.02.FB Wheel Arch Liner - Front -
LH - Renew).
6. Remove heatshield deflector, front floor (refer to Workshop Manual procedure 09.04.AA Heatshield -
Front Floor - Renew).
7. Loosen EGR pipe in valve.
8. Remove (nuts x2) EGR pipe from manifold, discard
gasket and tie aside.
WA R N I N G
GET THE AID OF ONE MORE PERSON WHEN YOU INSTALL THE REAR EXHAUST SILENCER.
THE SILENCER IS HEAVY .
Ensure correct alignment of exhaust pipes and silencer before tightening of fixing clamps.
Repair Operation Time (ROT)
WA R N I N G
THE EXHAUST SYSTEM WILL BE VERY HOT AFTER
OPERATION. LET THE EXHAUST COOL BEFORE YOU DO WORK. IF YOU DO NO T, PESONAL INJURY CAN
OCCUR.
Repair Operation Time (ROT)

Page 573 of 947

Silencer Assembly (09.01)
Exhaust (09.00)9-1-8 Workshop Manual Issue 5, January 2010
9. Remove nut (x8) securing RH exhaust manifold to cylinder head (refer to Fig. 1).
10. Remove nut (x2) on RH engine mounting.
11. Raise engine by approximately 25mm.
12. Remove RH exhaust manifold from vehicle and discard
gasket.
13. Remove heatshield from manifold (bolts x4)
14. Remove nuts (x8) securing LH exhaust manifold to
cylinder head.
15. Remove exhaust manifold, remove and discard gasket.
Installation
1. Clean LH exhaust manifold and mating face on cylinder head. Install new manifold gasket.
2. Install LH exhaust manifold to cylinder head.
3. Install and torque tighten nuts (x8) securing exhaust manifold to cylinder head.
4. Clean exhaust manifold and mating face on engine. Install new gasket to engine.
5. Install heatshield to manifold (bolts x4)
6. Install RH exhaust mani fold to cylinder head.
7. Install nut (x8) securing manifold to cylinder head
(torque).
8. Lower engine.
9. Install nuts (x2) on engine mounts (torque).
10. Install (nuts x2) EGR pipe from manifold, clean mating face and fit new gasket (torque).
11. Install heatshield deflector, front floor (refer to Workshop Manual procedure 09.04.AA Heatshield -
Front Floor - Renew).
12. Tighten EGR pipe in valve (torque).
13. Install RH front wheel arch liner (refer to Workshop Manual procedure 01.02.GB Wheel Arch Liner - Front -
RH - Renew
14. Install LH wheel arch liner (refer to Workshop Manual procedure 01.02.FB Wheel Arch Liner - Front - LH -
Renew).
15. Lower vehicle on ramp. 16. Connect vehicle battery.
Exhaust System (Excluding Manifold/
Downpipes)-Renew
Removal
1. Raise vehicle on ramp.
2. Remove undertrays - vehicle set (refer to Workshop
Manual procedure 01.02.PD Undertrays - Vehicle Set -
Renew).
3. Remove Allen bolts(x4), bumper diffuser to mounting brackets. Remove diffuser
4. Disconnect both by-pass valve vacuum lines.
5. Remove bolts (x4), securing LH and RH silencer rear
hanger brackets to body. Remove hanger brackets.
6. Remove bolts (x4), rear exha ust pipes to silencer. Collect
springs from bolts
7. Remove bolts (x4), silencer front mountings to subframe. Remove mountings from silencer.
8. Position suitable lifter to support weight of silencer. with assistance, remove silencer.
9. Mark rear stub pipes to si lencer for assembly purposes.
10. Loosen clamps (x2), rear stub pipes to silencer. Remove stub pipes and clamps.
11. Remove bolts (x4), remove rear subframe cross brace.
12. Loosen clamps (x2), release RH and LH rear pipes from centre pipe.
13. Remove rear pipes through subframe.
14. Loosen clamps (x2), centre pipe to LH and RH catalysts.
15. Coupe Only - Release centre pipe from mountings, LH
and RH catalysts, remove centre pipe.
16. Roadster Only - Remove centre exhaust mounting bolts
(x4).
17. Release LH and RH catal ysts, remove centre pipe.
18. Disconnect multiplugs (x4), from each catalyst.
19. Coupe Only - Secure sufficient lengths of string to
HEGO sensor multiplugs for assembly purposes.
Figure 1
A090069
Repair Operation Time (ROT)
ItemCode
Exhaust System (Excluding Manifold/
Downpipes)-Renew 09.00.NB
WAR NI NG
TO AVOID PERSONAL INJURY, I.E. SEVERE BURNS TO
THE SKIN, ALLOW EXHAUS T SYSTEM TO COOL
DOWN BEFORE REMOVING EXHAUST SYSTEM COMPONENTS.
WAR NI NG
GET THE AID OF ONE MORE PERSON WHEN YOU
REMOVE THE REAR EXHAUST SILENCER.
THE SILENCER IS HEAVY .
Attach lengths of string to th e HEGO sensor multiplugs. This
enables routing the HEGO sensor harness behind the exhaust heat shield on assembly.

Page 658 of 947

Battery System (14.01)
Power Supply (14.00)
May 2007 Workshop Manual 14-1-3
Charging Circuit
Electrical power generated at the alternator flows via two ‘T Pi ece’ connectors to the engine bay ‘Dirty Feed’ stud. It then
flows via the Battery Disconnect Switch (BDS) to the battery positive terminal. Both the alternator and the battery are
earthed via the vehicle body to complete the charging circuit.
The starter motor and the ‘jump start terminal’ ar e also fed directly from the charging circuit.
Go to page 18-X-XX for complete power dist ribution circuit diagram (Circuit Sheet 25).
+12 Volt Distribution
The +12 volt supply comes from the battery to the battery disc onnect switch (BDS). Assuming that this switch is not
activated, 12 volt power is then available from C0046-8 on the BDS to all of the clean feed battery studs.
The following clean feeds are then live:
• Boot fuse box clean feed
• Under bonnet fuse box clean feed
• CEM busbars 1, 2, 3 and 4 clean feeds
12V power to all systems and components is then controlled by the CEM and the under bonnet / boot fuse boxes.

Page:   < prev 1-10 11-20 21-30 31-40 next >