fuse diagram AUDI A6 1999 C5 / 2.G ATQ Engine Additional Signals Testing Workshop Manual
Page 29 of 44
24-186
If specified value is obtained:
Checking voltage supply
If LED does not light up:
Electrical Wiring Diagrams, Troubleshooting & Component Locations
binder - Connect VAG1527B voltage tester as follows:Harness connector
Terminal
Measure to
1 Chassis Ground (GND)
- Switch ignition on.
LED must light up.
- Check wire connection from terminal 1 of connector to fuse for open
circuit and short circuit to Ground (GND):
Pa
ge 29 of 44 Additional si
gnals, testin
g
11/23/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.FU05.24.6