clock CHRYSLER CARAVAN 2000 Service Manual
Page 383 of 436
TEST SC-2ACHECKING SPEED CONTROL OPERATION
Perform TEST SC-1A Before Proceeding
*Perform Verification TEST VER-3A. **Check connectors - Clean / repair as necessary.
KEY OFF.
START TEST DISCONNECT THE
SC-2A. CLOCKSPRING
HARNESS
CONNECTOR.**
KEY ON. USING THE A JUMPER WIRE DID THE VOLTAGE
DRB, MONITOR THE ACROSS CLOCKSPRING CHANGE FROM YES REPLACE THE SPEED
CRUISE SWITCH HARNESS CONNECTOR APPROXIMATELY 5.0 CONTROL SWITCHES.*
VOLTAGE WHILE CAVITIES 3 AND 4. VOLTS TO 0 VOLTS?
CONNECTING... FIG.1
NO
KEY ON. PROBE THE REPAIR THE OPEN
USE A VOLTMETER IN CLOCKSPRING IS THE VOLTAGE YES SPEED CONTROL
THE FOLLOWING HARNESS CONNECTOR ABOVE 4.0 VOLTS? SWITCH GROUND
STEP. CAVITY 4. CIRCUIT.*
NO
KEY OFF. USING AN OHMMETER,
DISCONNECT THE ECM MEASURE THE SPEED IS THE RESISTANCE YES REPAIR THE OPEN
HARNESS CONTROL SWITCH ABOVE 5.0 OHMS? SPEED CONTROL
CONNECTORS.** CIRCUIT. SWITCH CIRCUIT.*
FIG.1
NO
REPLACE THE ENGINE
CONTROL MODULE.*
S
P
E
E
D
C
O
N
T
R
O
L
T
E
S
T
S
377
ProCarManuals.com