Time Citroen BERLINGO 2004 1.G User Guide

Page 213 of 523

Downloaded from www.Manualslib.com manuals search engine 209
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1EP1E8C
Adjusting the timing belt tension.
Act on the tensioner roller (18)to align the marks «g»and «h», avoiding detensioning the
timing belt, using an allen spanner at «d».
Should this fail, repeat the operation to tension the timing belt.Hold the tensioner roller
(18).
Tighten the tensioner roller fixing nut to 3,7 ± 0,3 m.daN.
Check the position of the tensioner roller (the alignment of the marks «g»and «h»should
be correct).
Remove tools [2]and [3].
Rotate the crankshaft six times(clockwise).
IMPERATIVE:Never rotate the engine backwards.
WARNING:
Do not touch or damage the track of the target of the engine speed sensor (14).
Peg the crankshaft, using tool
[3].
Check the position of the tensioner roller (the alignment of the marks «g»and «h»should
be correct).
If this is not the case, repeat the operation to tension the timing belt.
Peg the camshaft pulley, using tool
[2].
IMPERATIVE: Should it be impossible to peg the camshaft, check that the offset bet
ween the camshaft hole and the pegging hole is not more than 1 mm. If the offset is
too great, repeat the operation.
Remove tools [2]and [3].
XSARA PICASSO

Page 218 of 523

Downloaded from www.Manualslib.com manuals search engine 214
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1EP1EDC
Setting the timing (continued).
NOTE:
If necessary, you can slightly rotate the pinions (10)and (7)anticlockwise in order to engage the belt.
The angular displacement value of the belt in relation to the pinions should not be more than half a tooth.
Remove tool
[5].
Act on the tensioner roller
(8)by its square «a», using tool [6]to check that the camshaft and injection
pump pinions can turn freely.
Position the belt tension instrument
[7]on the belt at «b».
Using tool
[6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
106 ± 2 SEEM units.
Tighten screws
(9), (5)and (6).
Remove tools
[7], [2], [3]and[4].
Rotate the crankshaft
8 timesin the normal direction of rotation.
Peg the flywheel, using tool
[2].
Peg the camshaft hub, using tool
[4].
Peg the injection pump hub, using tool
[3].
Slacken screws
(9), (5)and (6).
Position the belt tension instrument
[7]on the belt at «b».
Using tool
[6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
42 ± 2 SEEM units.
B1EP1EFC
XSARA

Page 219 of 523

Downloaded from www.Manualslib.com manuals search engine 215
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Tighten:
Screw (9)to 2.1 ± 0.2 m.daN.
Screws (5)to 2,3 ± 0.2 m.daN.
Screws (6)to 2,3 ± 0.2 m.daN.
Remove and refit tool [7].
The tension value should be between 38 and 46 SEEM units.
Remove tools [7], [2], [3] and [4].
Turn the crankshaft 2 timesin the normal direction of rotation.
Peg the flywheel, using the peg [2].
Visually check the peggings of the camshaft and injection pump.
ESSENTIAL:Visually check that the offsets between the holes of
the camshaft and injection pump hubs and the correspondingpegging holes are not more than 1 mm.If necessary, recommence
the procedure for fitting the timing belt.
XSARA
Setting the timing (continued).
Remove the peg [2].
Remove the screw (4)and the washer.
Refit the lower cover (3).
Refit the intermediate cover (2).
Refit the upper cover (1).
Remove the RH engine support.
Take away the workshop hoist. Remove the plugs and recouple the diesel fuel delivery and return
hoses. Refit the accessories drive belt
(see corresponding operation).
Refit the RH lower splashshield. Disengage
5th gear.
Connect the battery.

Page 226 of 523

Downloaded from www.Manualslib.com manuals search engine 222
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Reposition the timimg belt, belt at «a»well tensioned, in the following order:
Fuel high pressure pump pulley
(21).
Guide roller
(15).
Crankshaft pinion
(19).
Coolant pump pinion
(16).
Tensioner roller
(18).
Position tool
[1]on the belt at «a».
Remove tools
[4]and [9].
Turn the tensioner roller
(18)anticlockwise, using tool [2], to attain an overtension of:
98 ± 2 SEEM units.
Tighten screw
(17)of the tensioner roller to 2,5 ± 0,2 m.da N.
Lock the flywheel by means of tool
[6].
Tighten the accessories drive pulley screw
(8)to 7 ± 0,7 m.da N.
Remove tools
[1], [3], [5] and [6].
Rotate the crankshaft eight times in the normal direction of rotation.
Peg:
The crankshaft, using tool
[3].
The camshaft drive pulley, using tool
[5].
B1EP1ABDB1EP1ACC
XSARA XSARA PICASSO

Page 227 of 523

Downloaded from www.Manualslib.com manuals search engine 223
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Lock the engine flywheel, using tool [6].
Slacken:
The accessories drive pulley
(8).
The screw (17) of the tensioner roller (18).
Fit the tool [1].
Turn the tensioner roller, using tool [2], to attain a tension of:54 ± 2 SEEM units.
Tighten screw (17)of the tensioner roller (18)to 2,5 ± 0,2 m.daN.
Remove tool [1].
Fit tool [1].
The tension value should be:
54 ±3 SEEM units.ESSENTIAL: If the value is incorrect, recommence the operation.
Remove tools [1], [3], [5]and [6].
Rotate the crankshaft two times in the normal direction of rotation.
Peg:
The crankshaft, using tool
[3].
The camshaft drive pulley.
IMPERATIVE:If the pegging is not possible, recommence the operation.
B1EP1ACC
XSARA XSARA PICASSO

Page 247 of 523

Downloaded from www.Manualslib.com manuals search engine 243
INJECTION
SAFETY REQUIREMENTS: HDi DIRECT INJECTION SYSTEM
Engines: HDi ALL TYPES
SAFETY REQUIREMENTS.
Preamble.
All interventions on the injection system must be carried out to conform with the following requirements and regulations:
Competent health authorities.
Accident prevention.
Environmental protection.
WARNING:Repairs must be carried out by specialised personnel informed of the safety requirements and of the precautions to be taken.
Safety requirements.
IMPERATIVE: Take into account the very high pressures in the high pressure fuel circuit (1350 bars), and respect the requirements below: No smoking in proximity to the high pressure circuit when work is being carried out.
Avoid working close to flame or sparks.
Engine running: Do not work on the high pressure fuel circuit.
Always stay clear of the trajectory of any possible jet of fuel, which could cause serious injuries.
Do not place your hand close to any leak in the high pressure fuel circuit.
After the engine has stopped, wait
30 secondsbefore any intervention.
NOTE:This waiting time is necessary in order to allow the high pressure fuel circuit to return to atmospheric pressure.

Page 256 of 523

Downloaded from www.Manualslib.com manuals search engine 252
INJECTION
SPECIFICATIONS OF THE DELPHI DIESEL INJECTION PUMP XSARA
Engine
typePump
Type
ReferenceStatic timing
Initial advance
Compression
Time
(cylinder N° 4)Dynamic
timing
checking
(at idle)Reference
InjectorInjector
holder
+ injectorCode
colourInjector
needle lift
pressure
(Bar)Adjustments (rpm) Max. speed
Fast
idlingAntistall
IdlingUnladen
rpmLaden
rpm
WJYDWLP 12
R 8448 B/*RDNO
SDC
6903LDCR
0260
IAA135,5
±5950
±25875
±25875
±255350
± 125
Engine
TDC
Pegging hole.
Value «X»
engraved on
the pump.
(*) = See table page: 251.1500
+ 3
mm
shim

Page 261 of 523

Downloaded from www.Manualslib.com manuals search engine 257
INJECTION
FITTING DELPHI DIESEL INJECTORS
Engine: WJY
B1DP158CB1HP12VCB1HP0YGC
Fitting an injector.
The copper seal (1)and the
fire seal washer (3)are to be
replaced each time they are
removed.
NOTE:Fitting parts of diffe
rent makes is PROHIBITED.
WARNING:Ensure that the
fire seal washer (3)is fitted
the right way round.
Tighten the injector holder
on the cylinder head to:
9 m.daN
[1] Tool to remove/refit injectors: 7007T
[2] : 7008T.A Tool kit 4123T
(3)Tighten lightly to prevent any distortion.
XSARA

Page 274 of 523

Downloaded from www.Manualslib.com manuals search engine 270
INJECTION
CHECKS: EXHAUST GASES RECYCLING CIRCUIT
Engines: 8HX 8HW
Engines: 8HV 8HY
Tools.
[1]
Manual pressurevacuum pump: FACOM DA 16
IMPERATIVE: Respect the safety and cleanliness specific to high pressure diesel
injection (HDi) engines.
EGR v
alve.Connect tool [1]on the capsule takeoff (2).
Apply a vacuum of approx.0,6 barseveral times to activate the rod «a».
In abruptly suppressing the vacuum, the valve should click and lock itself back on its seating.
Regulation electrovalve (EGR).(Engine:8HX8HW).Check to be performed between the electrovalve (1)and the EGR valve (2).
Link the tool [1]in series, between the electrovalve (1)and the capsule (2).
Compare the values noted with those in the table below.
Regulation electrovalve (EGR).(Engine:8HV8HY).Check to be performed between the electrovalve (2)and the EGR valve (1).
Link the tool [1] in series, between the electrovalve (2)and the capsule (1).
Compare the values noted with those in the table below.
Engine speed (rpm) Vacuum value
780 0,5
2500 0
B1HP15GD
B1HP1K6D
C2 C3

Page 276 of 523

Downloaded from www.Manualslib.com manuals search engine 272
INJECTION
CHECKS: EXHAUST GASES RECYCLING CIRCUIT
Engines: RHY RHZ
XSARA PICASSO
Tools.
[1]
Manual vacuum pump : FACOM DA 16
IMPERATIVE: Respect the safety and cleanliness requirements.
EGR valve.
Connect the tool [1]to the capsule union (1).
Apply several times in succession a vacuum of approx.0.6 barto activate the rod "a".
In abrupt reaction to the vacuum, the valve should close on its seating with a clicking
noise.
Exhaust gas reycling (EGR) electrovalve. Check, not under load, between the electrovalve (2)and the EGR valve (1).
Connect the tool [1]between the electrovalve (2)and the capsule (1).
Compare readings with the values in the table below.
Engine speed (rpm) Vacuum value
7800,5
25000
B1HP12GD

Page:   < prev 1-10 11-20 21-30 31-40 next >