dead battery Citroen BERLINGO 2004 1.G Workshop Manual

Page 222 of 523

Downloaded from www.Manualslib.com manuals search engine 218
ENGINECHECKING AND SETTING THE VALVE TIMING
NOTE: Checking and setting the valve timing on engines: RHYRHZ N° ⁄ RPO 9127
See Mechanic’s Handbook 2003: pages 193 to196
Tools.
[1]
Belt tension measuring equipment :4122T
[2]
Tension lever:().0188.J2
[3]
Engine flywheel peg: ().0188.Y
[4]
Belt clamp: ().0188.AD
[5]
Camshaft pulley peg: ().0188.M
[6]
Engine flywheel lock: ().0188.F
[7]
Set of blocking plugs:().0188.T
[8]
Pulley extractor:().0188.P
[9]
2 mm dia.peg: ().0188.Q2Removing.
IMPERATIVE: Respect the safety and cleanliness requirements
that are specific to high pressure diesel injection (HDi) engines.
Undo the front RH wheel bolts.
Raise and support the vehicle on the front RH side.
Disconnect the battery negative terminal.
Remove:
The underengine sounddeadening.
The front RH wheel.
The front RH splashshield. The engine cover.
Unclip and move aside the cooling hose.
Remove the accessories drive belt
(see corresponding operation).
XSARA XSARA PICASSO
Engines: RHY RHZ N° RPO 9128 #