flywheel Citroen C2 2004 1.G Owner's Guide

Page 206 of 523

Downloaded from www.Manualslib.com manuals search engine 202
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1EP1E3D
Rotate the engine to drive it in its normal direction of rotation.
Peg the flywheel, using tool
[1]at «b».
Move aside the harness
(7).
Remove:
The engine support
(8).
The screw
(10).
The accessories drive pulley
(9).
The lower timing cover
(11).
The upper timing cov
(12).
The tool
[1].
B1BP305C
XSARA PICASSO

Page 209 of 523

Downloaded from www.Manualslib.com manuals search engine 205
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1BP304D
Tools.
[1]
Flywheel setting peg: ().0194.C
[2]
Camshaft setting peg:().0194.B
[3]
Crankshaft setting peg: ().0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove: The front RH wheel.
The front RH splashshield.
The accessories drive belt
(see corresponding operation).
Uncouple:
The fuel supply unions
(1).
The air/air heat exchanger inlet and outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connecter at
«a».
Remove and move aside the power steering fluid reservoir
(6).
Uncouple, plug and move aside the tube
(2).
Support the engine with a roller jack equipped with a block.Remove the engine supports
(4)and (5).
XSARA PICASSO

Page 210 of 523

Downloaded from www.Manualslib.com manuals search engine 206
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1EP1E3D
Rotate the engine to drive it in its normal direction of rotation.
Peg the flywheel at
«b». using tool [1].
Move aside the harness
(7).
Remove:
The engine support
(8).
The screw
(10).
The accessories drive pulley
(9).
The lower timing cover
(11).
The upper timing cov
(12).
The tool
[1].
B1BP305C
XSARA PICASSO

Page 215 of 523

Downloaded from www.Manualslib.com manuals search engine 211
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Tools.
[1]
Pliers for remving plastic pins: 7504T or ().1311
[2]Flywheel peg: 7014T.J or ().0188 Y
[3]Injection pump setting peg Ø 6 mm: ().0188 H
[4]Screw H M8: ().0188 E
[5]Belt retaining pin: ().0188 K
[6]Square for adjusting belt tension: ().0188 J1
[7]Belt tension measuring instrument, with digital display: SEEM CTG 105.5M
Checking the timing.
Peg the flywheel, using tool [2].
Peg the camshaft hub, using tool [4].
Peg the injection pump hub, using tool [3].
IMPERATIVE: If the pegging proves impossible, repeat the setting of the timing.
B1BP2FTCB1EP16PD
XSARA

Page 216 of 523

Downloaded from www.Manualslib.com manuals search engine 212
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1BP2FTC
Setting the timing.
Removing.
Disconnect the battery.
Remove the front RH lower splashshield, using tool [1].
Remove the accessories drive belt (see corresponding operation).
Uncouple and plug the diesel fuel delivery and return hoses. Support the engine, using a workshop hoist.
Remove the RH engine support.
Engage 5th gear to permit rotation of the engine. Remove the upper cover
(1).
Remove the intermediate cover (2).
Remove the lower cover (3).
WARNING:Refit the screw (4)equipped with a washer (5 mm thick).
Rotate the front RH wheel to drive the engine in its normal direction of
rotation. Bring the camshaft drive and injection pump pinions to their setting points.
Position the peg
[2](from underneath the vehicle).
Continue turning the engine until the peg [2]engages in the flywheel.
B1BP30BC
XSARA

Page 218 of 523

Downloaded from www.Manualslib.com manuals search engine 214
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1EP1EDC
Setting the timing (continued).
NOTE:
If necessary, you can slightly rotate the pinions (10)and (7)anticlockwise in order to engage the belt.
The angular displacement value of the belt in relation to the pinions should not be more than half a tooth.
Remove tool
[5].
Act on the tensioner roller
(8)by its square «a», using tool [6]to check that the camshaft and injection
pump pinions can turn freely.
Position the belt tension instrument
[7]on the belt at «b».
Using tool
[6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
106 ± 2 SEEM units.
Tighten screws
(9), (5)and (6).
Remove tools
[7], [2], [3]and[4].
Rotate the crankshaft
8 timesin the normal direction of rotation.
Peg the flywheel, using tool
[2].
Peg the camshaft hub, using tool
[4].
Peg the injection pump hub, using tool
[3].
Slacken screws
(9), (5)and (6).
Position the belt tension instrument
[7]on the belt at «b».
Using tool
[6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
42 ± 2 SEEM units.
B1EP1EFC
XSARA

Page 219 of 523

Downloaded from www.Manualslib.com manuals search engine 215
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Tighten:
Screw (9)to 2.1 ± 0.2 m.daN.
Screws (5)to 2,3 ± 0.2 m.daN.
Screws (6)to 2,3 ± 0.2 m.daN.
Remove and refit tool [7].
The tension value should be between 38 and 46 SEEM units.
Remove tools [7], [2], [3] and [4].
Turn the crankshaft 2 timesin the normal direction of rotation.
Peg the flywheel, using the peg [2].
Visually check the peggings of the camshaft and injection pump.
ESSENTIAL:Visually check that the offsets between the holes of
the camshaft and injection pump hubs and the correspondingpegging holes are not more than 1 mm.If necessary, recommence
the procedure for fitting the timing belt.
XSARA
Setting the timing (continued).
Remove the peg [2].
Remove the screw (4)and the washer.
Refit the lower cover (3).
Refit the intermediate cover (2).
Refit the upper cover (1).
Remove the RH engine support.
Take away the workshop hoist. Remove the plugs and recouple the diesel fuel delivery and return
hoses. Refit the accessories drive belt
(see corresponding operation).
Refit the RH lower splashshield. Disengage
5th gear.
Connect the battery.

Page 222 of 523

Downloaded from www.Manualslib.com manuals search engine 218
ENGINECHECKING AND SETTING THE VALVE TIMING
NOTE: Checking and setting the valve timing on engines: RHYRHZ N° ⁄ RPO 9127
See Mechanic’s Handbook 2003: pages 193 to196
Tools.
[1]
Belt tension measuring equipment :4122T
[2]
Tension lever:().0188.J2
[3]
Engine flywheel peg: ().0188.Y
[4]
Belt clamp: ().0188.AD
[5]
Camshaft pulley peg: ().0188.M
[6]
Engine flywheel lock: ().0188.F
[7]
Set of blocking plugs:().0188.T
[8]
Pulley extractor:().0188.P
[9]
2 mm dia.peg: ().0188.Q2Removing.
IMPERATIVE: Respect the safety and cleanliness requirements
that are specific to high pressure diesel injection (HDi) engines.
Undo the front RH wheel bolts.
Raise and support the vehicle on the front RH side.
Disconnect the battery negative terminal.
Remove:
The underengine sounddeadening.
The front RH wheel.
The front RH splashshield. The engine cover.
Unclip and move aside the cooling hose.
Remove the accessories drive belt
(see corresponding operation).
XSARA XSARA PICASSO
Engines: RHY RHZ N° RPO 9128 #

Page 223 of 523

Downloaded from www.Manualslib.com manuals search engine 219
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Uncouple, plug and move aside, using tool [7], the fuel delivery pipe (2)and return
pipe (1).
Remove:
Screws
(3), (4) and (6).
Screw (7).
The upper timing cover (5).
WARNING:Refit screw (7)equipped with a spacer (17 mm thick), tighten the
screw (7)to 1,5 ± 0,1 m. daN.
NOTE:The screw (7)is one of the screws securing the coolant pump and is there
for its sealing.
Put the gear lever in 5th gear.Turn the road wheel to turn the engine in its direction of rotation.
Orient the camshaft pulley in the pegging position, use a mirror if necessary.
Peg the camshaft, using tool
[5].
Peg the engine flywheel, using tool
[3].
B1EP1A7CB1BP2H3CB1BP2H2CB1BP2R2C
XSARA XSARA PICASSO

Page 224 of 523

Downloaded from www.Manualslib.com manuals search engine 220
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Remove:
The fixings of the pipe linking the power steering pump with the rotary valve.
The clutch lower closing plate.
Lock the engine flywheel, using tool
[6].
Remove the screw (8).
Refit the screw (8)without its thrust washer.
Remove:
The accessories pulley
(9), using tool[8].
Tool [6].
The lower torque reaction rod.
Support the engine by means of a workshop hoist.
Remove:
The bearing shell fitting
(10).
The nut (12).
Screws (11).
The bracket (13).
NOTE:Lift then lower the engine with the workshop hoist, to have access to the
timing cover fixing screws.
Remove:
The intermediate timing cover.
The lower timing cover.
B1CP04BCB1BP2R3CB1BP2R4C
XSARA XSARA PICASSO

Page:   < prev 1-10 11-20 21-30 31-40 41-50 next >