Valve timing Citroen C2 2004 1.G Manual PDF

Page 219 of 523

Downloaded from www.Manualslib.com manuals search engine 215
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Tighten:
Screw (9)to 2.1 ± 0.2 m.daN.
Screws (5)to 2,3 ± 0.2 m.daN.
Screws (6)to 2,3 ± 0.2 m.daN.
Remove and refit tool [7].
The tension value should be between 38 and 46 SEEM units.
Remove tools [7], [2], [3] and [4].
Turn the crankshaft 2 timesin the normal direction of rotation.
Peg the flywheel, using the peg [2].
Visually check the peggings of the camshaft and injection pump.
ESSENTIAL:Visually check that the offsets between the holes of
the camshaft and injection pump hubs and the correspondingpegging holes are not more than 1 mm.If necessary, recommence
the procedure for fitting the timing belt.
XSARA
Setting the timing (continued).
Remove the peg [2].
Remove the screw (4)and the washer.
Refit the lower cover (3).
Refit the intermediate cover (2).
Refit the upper cover (1).
Remove the RH engine support.
Take away the workshop hoist. Remove the plugs and recouple the diesel fuel delivery and return
hoses. Refit the accessories drive belt
(see corresponding operation).
Refit the RH lower splashshield. Disengage
5th gear.
Connect the battery.

Page 220 of 523

Downloaded from www.Manualslib.com manuals search engine 216
ENGINE
(1) «Idler»camshaft pulley(2)Target for cylinder reference sensor.(3)Camshaft hub.(4)«Fixed»crankshaft pinion.
The determining of the tension of the timing belt is done on the cam
shaft pulley
(1).
The new timing on 8 valveengines DW10TD (RHY)and DW10
ATED (RHS-RHZ)requires the following components:«Idler»crankshaft pinion«Fixed»camshaft pulley.
(5) «Fixed»pulley with integral cylinder reference
sensor target).(6) «Idler»crankshaft pinion (with increased width keyway groove).
The determining of the tension of the timing belt is done on the crankshaft pinion
(6).
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
OLD FITTING:# N° RPO 9127 NEW FITTING N° RPO 9128 #
B1EP176DB1EP177D
XSARA XSARA PICASSO

Page 221 of 523

Downloaded from www.Manualslib.com manuals search engine 217
ENGINE
The new fitting discontinues the following components:
Camshaft hub.
Cylinder reference sensor target.
Repair – Accessories drive pulley
Remove – Refit
WARNING:
Peg the camshaft and the crankshaft before ever removing the
accessories drive pulley (the pegging prevents any offsetting of the camshaft).
If necessary, apply a paint spot to mark the accessories drive pulley being
replaced.
Replacement parts.
The Replacement Parts service markets the old as well as the new components.
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
NEW FITTING N° RPO 9128 # (Continued)
B1EP177D
XSARA XSARA PICASSO

Page 222 of 523

Downloaded from www.Manualslib.com manuals search engine 218
ENGINECHECKING AND SETTING THE VALVE TIMING
NOTE: Checking and setting the valve timing on engines: RHYRHZ N° ⁄ RPO 9127
See Mechanic’s Handbook 2003: pages 193 to196
Tools.
[1]
Belt tension measuring equipment :4122T
[2]
Tension lever:().0188.J2
[3]
Engine flywheel peg: ().0188.Y
[4]
Belt clamp: ().0188.AD
[5]
Camshaft pulley peg: ().0188.M
[6]
Engine flywheel lock: ().0188.F
[7]
Set of blocking plugs:().0188.T
[8]
Pulley extractor:().0188.P
[9]
2 mm dia.peg: ().0188.Q2Removing.
IMPERATIVE: Respect the safety and cleanliness requirements
that are specific to high pressure diesel injection (HDi) engines.
Undo the front RH wheel bolts.
Raise and support the vehicle on the front RH side.
Disconnect the battery negative terminal.
Remove:
The underengine sounddeadening.
The front RH wheel.
The front RH splashshield. The engine cover.
Unclip and move aside the cooling hose.
Remove the accessories drive belt
(see corresponding operation).
XSARA XSARA PICASSO
Engines: RHY RHZ N° RPO 9128 #

Page 223 of 523

Downloaded from www.Manualslib.com manuals search engine 219
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Uncouple, plug and move aside, using tool [7], the fuel delivery pipe (2)and return
pipe (1).
Remove:
Screws
(3), (4) and (6).
Screw (7).
The upper timing cover (5).
WARNING:Refit screw (7)equipped with a spacer (17 mm thick), tighten the
screw (7)to 1,5 ± 0,1 m. daN.
NOTE:The screw (7)is one of the screws securing the coolant pump and is there
for its sealing.
Put the gear lever in 5th gear.Turn the road wheel to turn the engine in its direction of rotation.
Orient the camshaft pulley in the pegging position, use a mirror if necessary.
Peg the camshaft, using tool
[5].
Peg the engine flywheel, using tool
[3].
B1EP1A7CB1BP2H3CB1BP2H2CB1BP2R2C
XSARA XSARA PICASSO

Page 224 of 523

Downloaded from www.Manualslib.com manuals search engine 220
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Remove:
The fixings of the pipe linking the power steering pump with the rotary valve.
The clutch lower closing plate.
Lock the engine flywheel, using tool
[6].
Remove the screw (8).
Refit the screw (8)without its thrust washer.
Remove:
The accessories pulley
(9), using tool[8].
Tool [6].
The lower torque reaction rod.
Support the engine by means of a workshop hoist.
Remove:
The bearing shell fitting
(10).
The nut (12).
Screws (11).
The bracket (13).
NOTE:Lift then lower the engine with the workshop hoist, to have access to the
timing cover fixing screws.
Remove:
The intermediate timing cover.
The lower timing cover.
B1CP04BCB1BP2R3CB1BP2R4C
XSARA XSARA PICASSO

Page 225 of 523

Downloaded from www.Manualslib.com manuals search engine 221
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Slacken the screw (17)of the tensioner roller (18).
Remove the timing belt
(14).
Checks.
IMPERATIVE: Just before refitting, carry out the checks below.
Check that:
The rollers
(18)and (15)turn freely (without play and without any tight spot).
The coolant pump pulley
(16)turns freely (without play and without any tight spot).
There are no traces of oil leaks from the crankshaft and camshaft seals, etc.
The crankshaft pinion travels freely on the keyway.
Replace defective components if necessary.
Peg the crankshaft pinion
(19)by inserting tool [9]on the LH side of the keyway.
B1EP1A8DB1EP1A9C
XSARA XSARA PICASSO

Page 226 of 523

Downloaded from www.Manualslib.com manuals search engine 222
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Reposition the timimg belt, belt at «a»well tensioned, in the following order:
Fuel high pressure pump pulley
(21).
Guide roller
(15).
Crankshaft pinion
(19).
Coolant pump pinion
(16).
Tensioner roller
(18).
Position tool
[1]on the belt at «a».
Remove tools
[4]and [9].
Turn the tensioner roller
(18)anticlockwise, using tool [2], to attain an overtension of:
98 ± 2 SEEM units.
Tighten screw
(17)of the tensioner roller to 2,5 ± 0,2 m.da N.
Lock the flywheel by means of tool
[6].
Tighten the accessories drive pulley screw
(8)to 7 ± 0,7 m.da N.
Remove tools
[1], [3], [5] and [6].
Rotate the crankshaft eight times in the normal direction of rotation.
Peg:
The crankshaft, using tool
[3].
The camshaft drive pulley, using tool
[5].
B1EP1ABDB1EP1ACC
XSARA XSARA PICASSO

Page 227 of 523

Downloaded from www.Manualslib.com manuals search engine 223
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Lock the engine flywheel, using tool [6].
Slacken:
The accessories drive pulley
(8).
The screw (17) of the tensioner roller (18).
Fit the tool [1].
Turn the tensioner roller, using tool [2], to attain a tension of:54 ± 2 SEEM units.
Tighten screw (17)of the tensioner roller (18)to 2,5 ± 0,2 m.daN.
Remove tool [1].
Fit tool [1].
The tension value should be:
54 ±3 SEEM units.ESSENTIAL: If the value is incorrect, recommence the operation.
Remove tools [1], [3], [5]and [6].
Rotate the crankshaft two times in the normal direction of rotation.
Peg:
The crankshaft, using tool
[3].
The camshaft drive pulley.
IMPERATIVE:If the pegging is not possible, recommence the operation.
B1EP1ACC
XSARA XSARA PICASSO

Page 228 of 523

Downloaded from www.Manualslib.com manuals search engine 224
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Remove:
Tools [3]and [5].
Screw (7)and the spacer.
Refit: The lower, intermediate and upper covers
(5).
Screw (7), tighten to 1,5 ± 0,1 m.daN.
Screws (3), (4)and (6).
The bracket (13).
Screws (11), tighten to 6,1 ± 0,5 m.daN.
The nut (12), tighten to 4,5 ± 0,5 m.daN.
Fit the bearing shell (10).
Take away the workshop hoist.
Clip the fuel delivery and return pipes. Remove the tool
[7].
Couple:
The fuel delivery pipe
(12).
The fuel return pipe (1).
Coat the screw (8)with loctite FRENETANCH.
Refit the tool [6]and the screw (8)with the washer (22),
Tighten to 7 ± 0,2 m.daNand angular tighten to A = 60° ± 5°
[6].
Reposition and reclip the cooling hose.
Complete the refitting of components in reverse order to removal.
B1EP1A7CB1BP2R4CB1EP1ADC
XSARA XSARA PICASSO

Page:   < prev 1-10 ... 31-40 41-50 51-60 61-70 71-80 81-90 next >