Battery Citroen C3 2004 1.G User Guide

Page 178 of 523

Downloaded from www.Manualslib.com manuals search engine 174
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Setting the timing.
Removing.
Disconnect the battery negative terminal (see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove: The front RH wheel.
The plastic pins
(1).
The splashshield (2).
The accessories drive belt (see corresponding operation).
Unclip and move aside the fuel delivery hose from the timing cover.
Remove the upper timing cover
(1).
Turn the engine by means of the screw
(3)of the crankshaft pulley (2)to bring it to the pegging position.
B1BP2V4C
XSARA XSARA PICASSO

Page 182 of 523

Downloaded from www.Manualslib.com manuals search engine 178
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Refitting (continued).
Remove the tools [1]and [2].
Rotate the crankshaft ten times (normal direction of rotation).
IMPERATIVE: No pressure or outside force should be brought to bear on the timing belt.
Peg the inlet camshaft pulley, using tool [1].
Checks.
Tension of the timing belt.
ESSENTIAL:Check the position of the index «a», which should be opposite the slot «g».
If the position of the index «a» is not correct,repeat the operations to tension the timing belt.
Refit the upper timing cover (1).
Clip the fuel delivery hose on the timing cover.
Refit the accessories drive belt
(see corresponding operation).
Lower the vehicle.
Reconnect the battery
(see corresponding operation).
B1EP1BEC
B1EP1BFC
XSARA XSARA PICASSO

Page 188 of 523

Downloaded from www.Manualslib.com manuals search engine 184
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX 8HW 8HZ
B1BP2LXC
Tools.
[1]
Pliers for removing plastic pegs : 7504T
[2]Lever for detensioning the dynamic tensioner roller: ().0194.E
[3]Engine flywheel setting peg: ().0194.C
[4]Camshaft setting peg: ().0194.B
[5]Crankshaft and high pressure pump setting peg: ().0194.A
Preliminar
y operations.Remove:
The front RH wheel.
The front RH splashshield, using tool
[1].
The clips of the electrical harness on the upper timing cover. The accessories belt, using tool
[2](see corresponding operation).
Check ing the setting.
Disconnect the battery negative cable.
Remove the upper timing cover (1).
Rotate the engine using the screw (2)of the crankshaft pulley.
NOTE:The locking hole is located under the crankshaft bearing cap cover.
Undo the screw (2).
Detension the auxiliary drive belt dynamic tensioner roller, using tool [2].
C2 C3 C3 PLURIEL XSARA

Page 200 of 523

Downloaded from www.Manualslib.com manuals search engine 196
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1BP2N0C
Checks (continued).
Refit:
The engine support (7), tighten to 1,5 ± 0,4 m.daN.
The engine support
(4), tighten to 6,1 ± 0,6 m.daN.
The engine support
(5), tighten to 6 ± 0,6 m.daN.
The electrical harness
(6).
Couple:
The exhaust line, tighten the collar to : 2,5 ± 0,3 m daN.
The fuel supply unions
(1).
The air/air heat exchanger inlet/outlet pipes
(3).
Connect the connector
(2).
Refit:
The accessories belt (see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH road wheel, tighten to
9 ±1 m.daN.
Reconnect the battery.
C3

Page 205 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
201
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1BP304D
Tools.
[1]
Flywheel setting peg: ().0194.C
[2]
Camshaft setting peg:().0194.B
[3]
Crankshaft setting peg: ().0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove: The front RH wheel.
The front RH splashshield.
The accessories drive belt
(see corresponding operation).
Uncouple: The fuel supply unions
(1).
The air/air heat exchanger inlet and outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connecter at
«a».
Remove and move aside the power steering fluid reservoir
(6).
Uncouple, plug and move aside the tube
(2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports
(4)and (5).
XSARA PICASSO

Page 208 of 523

Downloaded from www.Manualslib.com manuals search engine 204
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to 5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
The tube (2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH wheel, tighten to 9 ±1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE:Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 209 of 523

Downloaded from www.Manualslib.com manuals search engine 205
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1BP304D
Tools.
[1]
Flywheel setting peg: ().0194.C
[2]
Camshaft setting peg:().0194.B
[3]
Crankshaft setting peg: ().0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove: The front RH wheel.
The front RH splashshield.
The accessories drive belt
(see corresponding operation).
Uncouple:
The fuel supply unions
(1).
The air/air heat exchanger inlet and outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connecter at
«a».
Remove and move aside the power steering fluid reservoir
(6).
Uncouple, plug and move aside the tube
(2).
Support the engine with a roller jack equipped with a block.Remove the engine supports
(4)and (5).
XSARA PICASSO

Page 214 of 523

Downloaded from www.Manualslib.com manuals search engine 210
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
The tube
(2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield (see corresponding operation).
The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 216 of 523

Downloaded from www.Manualslib.com manuals search engine 212
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1BP2FTC
Setting the timing.
Removing.
Disconnect the battery.
Remove the front RH lower splashshield, using tool [1].
Remove the accessories drive belt (see corresponding operation).
Uncouple and plug the diesel fuel delivery and return hoses. Support the engine, using a workshop hoist.
Remove the RH engine support.
Engage 5th gear to permit rotation of the engine. Remove the upper cover
(1).
Remove the intermediate cover (2).
Remove the lower cover (3).
WARNING:Refit the screw (4)equipped with a washer (5 mm thick).
Rotate the front RH wheel to drive the engine in its normal direction of
rotation. Bring the camshaft drive and injection pump pinions to their setting points.
Position the peg
[2](from underneath the vehicle).
Continue turning the engine until the peg [2]engages in the flywheel.
B1BP30BC
XSARA

Page 219 of 523

Downloaded from www.Manualslib.com manuals search engine 215
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Tighten:
Screw (9)to 2.1 ± 0.2 m.daN.
Screws (5)to 2,3 ± 0.2 m.daN.
Screws (6)to 2,3 ± 0.2 m.daN.
Remove and refit tool [7].
The tension value should be between 38 and 46 SEEM units.
Remove tools [7], [2], [3] and [4].
Turn the crankshaft 2 timesin the normal direction of rotation.
Peg the flywheel, using the peg [2].
Visually check the peggings of the camshaft and injection pump.
ESSENTIAL:Visually check that the offsets between the holes of
the camshaft and injection pump hubs and the correspondingpegging holes are not more than 1 mm.If necessary, recommence
the procedure for fitting the timing belt.
XSARA
Setting the timing (continued).
Remove the peg [2].
Remove the screw (4)and the washer.
Refit the lower cover (3).
Refit the intermediate cover (2).
Refit the upper cover (1).
Remove the RH engine support.
Take away the workshop hoist. Remove the plugs and recouple the diesel fuel delivery and return
hoses. Refit the accessories drive belt
(see corresponding operation).
Refit the RH lower splashshield. Disengage
5th gear.
Connect the battery.

Page:   < prev 1-10 11-20 21-30 next >