too low Citroen C3 2004 1.G Owner's Manual

Page 206 of 523

Downloaded from www.Manualslib.com manuals search engine 202
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1EP1E3D
Rotate the engine to drive it in its normal direction of rotation.
Peg the flywheel, using tool
[1]at «b».
Move aside the harness
(7).
Remove:
The engine support
(8).
The screw
(10).
The accessories drive pulley
(9).
The lower timing cover
(11).
The upper timing cov
(12).
The tool
[1].
B1BP305C
XSARA PICASSO

Page 208 of 523

Downloaded from www.Manualslib.com manuals search engine 204
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to 5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
The tube (2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH wheel, tighten to 9 ±1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE:Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 210 of 523

Downloaded from www.Manualslib.com manuals search engine 206
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1EP1E3D
Rotate the engine to drive it in its normal direction of rotation.
Peg the flywheel at
«b». using tool [1].
Move aside the harness
(7).
Remove:
The engine support
(8).
The screw
(10).
The accessories drive pulley
(9).
The lower timing cover
(11).
The upper timing cov
(12).
The tool
[1].
B1BP305C
XSARA PICASSO

Page 211 of 523

Downloaded from www.Manualslib.com manuals search engine 207
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1EP1E6D
Refit the screw (10).
Turn the crankshaft to bring the camshaft towards its pegging point.
Peg the camshaft at
«c», using tool [2](oil the pegs).WARNING: Do not press or damage the track of the engine speed sensor target
(13).
Peg the crankshaft at «e», using tool [3].
Remove:
The timing belt protector
(13).
The engine speed sensor (14).
Slacken the screw (15)of the tensioner roller, and keep it slackened using an allen
spanner at «d».
Detension the timing belt by pivoting the tensioner roller (clockwise).
Remove the timing belt, starting with the coolant pump pinion.
Checks.
ESSENTIAL: Just prior to refitting, proceed to the checks as below.
Check:
That the rollers and the coolant pump pulley turn freely (without play and without tight
spot).
That there are no signs of oil leaks (at the crankshaft and camshaft seals).
That there are no leaks of coolant fluid(at the coolant pump).
That the track of the engine speed sensor target (15)is not damaged or scratched.
Replace any components that are defective (if necessary).
XSARA PICASSO

Page 214 of 523

Downloaded from www.Manualslib.com manuals search engine 210
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
The tube
(2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield (see corresponding operation).
The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 216 of 523

Downloaded from www.Manualslib.com manuals search engine 212
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1BP2FTC
Setting the timing.
Removing.
Disconnect the battery.
Remove the front RH lower splashshield, using tool [1].
Remove the accessories drive belt (see corresponding operation).
Uncouple and plug the diesel fuel delivery and return hoses. Support the engine, using a workshop hoist.
Remove the RH engine support.
Engage 5th gear to permit rotation of the engine. Remove the upper cover
(1).
Remove the intermediate cover (2).
Remove the lower cover (3).
WARNING:Refit the screw (4)equipped with a washer (5 mm thick).
Rotate the front RH wheel to drive the engine in its normal direction of
rotation. Bring the camshaft drive and injection pump pinions to their setting points.
Position the peg
[2](from underneath the vehicle).
Continue turning the engine until the peg [2]engages in the flywheel.
B1BP30BC
XSARA

Page 217 of 523

Downloaded from www.Manualslib.com manuals search engine 213
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Peg the camshaft hub, using tool [4].
Peg the injection pump hub, using tool [3].
Slacken screws (5)and (6).
Slacken screw (9)of the tensioner roller (8).
Remove the timing belt.
Refitting. Retighten screws (5)and (6)by hand.
Turn the pinions (10)and (7)clockwise in order to place them at end of slots.
Fit the timing belt on the crankshaft. Hold the belt, using tool
[5].
Position the timing belt in the following sequence:
Guide roller
(11).
Injection pump pinion (7).
Camshaft pinion (10).
Coolant pump pinion
(12).
Tensioner roller (8).
B1EP16PDB1EP1EDCB1EP132C
XSARA
B1EP1EEC

Page 219 of 523

Downloaded from www.Manualslib.com manuals search engine 215
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Tighten:
Screw (9)to 2.1 ± 0.2 m.daN.
Screws (5)to 2,3 ± 0.2 m.daN.
Screws (6)to 2,3 ± 0.2 m.daN.
Remove and refit tool [7].
The tension value should be between 38 and 46 SEEM units.
Remove tools [7], [2], [3] and [4].
Turn the crankshaft 2 timesin the normal direction of rotation.
Peg the flywheel, using the peg [2].
Visually check the peggings of the camshaft and injection pump.
ESSENTIAL:Visually check that the offsets between the holes of
the camshaft and injection pump hubs and the correspondingpegging holes are not more than 1 mm.If necessary, recommence
the procedure for fitting the timing belt.
XSARA
Setting the timing (continued).
Remove the peg [2].
Remove the screw (4)and the washer.
Refit the lower cover (3).
Refit the intermediate cover (2).
Refit the upper cover (1).
Remove the RH engine support.
Take away the workshop hoist. Remove the plugs and recouple the diesel fuel delivery and return
hoses. Refit the accessories drive belt
(see corresponding operation).
Refit the RH lower splashshield. Disengage
5th gear.
Connect the battery.

Page 224 of 523

Downloaded from www.Manualslib.com manuals search engine 220
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Remove:
The fixings of the pipe linking the power steering pump with the rotary valve.
The clutch lower closing plate.
Lock the engine flywheel, using tool
[6].
Remove the screw (8).
Refit the screw (8)without its thrust washer.
Remove:
The accessories pulley
(9), using tool[8].
Tool [6].
The lower torque reaction rod.
Support the engine by means of a workshop hoist.
Remove:
The bearing shell fitting
(10).
The nut (12).
Screws (11).
The bracket (13).
NOTE:Lift then lower the engine with the workshop hoist, to have access to the
timing cover fixing screws.
Remove:
The intermediate timing cover.
The lower timing cover.
B1CP04BCB1BP2R3CB1BP2R4C
XSARA XSARA PICASSO

Page 225 of 523

Downloaded from www.Manualslib.com manuals search engine 221
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Slacken the screw (17)of the tensioner roller (18).
Remove the timing belt
(14).
Checks.
IMPERATIVE: Just before refitting, carry out the checks below.
Check that:
The rollers
(18)and (15)turn freely (without play and without any tight spot).
The coolant pump pulley
(16)turns freely (without play and without any tight spot).
There are no traces of oil leaks from the crankshaft and camshaft seals, etc.
The crankshaft pinion travels freely on the keyway.
Replace defective components if necessary.
Peg the crankshaft pinion
(19)by inserting tool [9]on the LH side of the keyway.
B1EP1A8DB1EP1A9C
XSARA XSARA PICASSO

Page:   < prev 1-10 11-20 21-30 31-40 41-50 51-60 61-70 ... 70 next >