200 Citroen C3 2004 1.G Owner's Guide

Page 177 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
173
CHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Checking the setting of the timing (continued).
A:
Pegging on the manual gearbox.
B:Pegging on the automatic gearbox.
Turn the engine by means of the crankshaft pinion screw, to bring it to the pegging position.
Peg the crankshaft, using tool
[2].
Peg the camshaft pulleys, using tool
[3].
NOTE:The pegs [3]should go in without effort.
WARNING:If the pegs go in only with difficulty, repeat the operation for fitting and
tensioning the timing belt
(see corresponding operation).
Refitting.
Remove tools [2]and [3].
Complete the refitting in reverse order to removal.
B1BP2V3D
B1EP1BAC
XSARA XSARA PICASSO

Page 178 of 523

Downloaded from www.Manualslib.com manuals search engine 174
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Setting the timing.
Removing.
Disconnect the battery negative terminal (see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove: The front RH wheel.
The plastic pins
(1).
The splashshield (2).
The accessories drive belt (see corresponding operation).
Unclip and move aside the fuel delivery hose from the timing cover.
Remove the upper timing cover
(1).
Turn the engine by means of the screw
(3)of the crankshaft pulley (2)to bring it to the pegging position.
B1BP2V4C
XSARA XSARA PICASSO

Page 179 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
175
CHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Setting the timing (continued).
A:
Pegging on the manual gearbox.
B:Pegging on the automatic gearbox.
Peg:
The crankshaft, using tool
[2].
The camshaft pulleys
(5)and (6), using tool [1].
Remove:
The screw
(3)of the crankshaft pulley (2).
The lower timing cover
(4)(by moving the engine).
IMPERATIVE: Never remove the crankshaft pulley (2) without pegging the crankshaft
and the camshafts.
Slacken the screw (9)of the tensioner roller (8).
Turn the tensioner roller
(8)(clockwise).
Remove the timing belt
(7).
I
MPERATIVE: Systematically replace the following components: timing belt, exhaust
manifold fixing nuts, timing belt tensioner roller nut.
B1BP2V3DB1EP1BBD
XSARA XSARA PICASSO

Page 180 of 523

Downloaded from www.Manualslib.com manuals search engine 176
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Setting the timing (continued).Turn the tensioner roller (8), using tool [5a]to go beyond slot «b».
Position the tool [5b]to lock the index «a»and remove the tool [5a].
Reposition the timing belt (7)on the crankshaft pulley.
Hold the timing belt (7)in place using tool [3].
Fit the timing belt (7)in place, respecting the following order:
Guide roller (10).
Inlet camshaft pulley (6).
Exhaust camshaft pulley (5).
Coolant pump (11).
Tensioner roller (8).NOTE:Make so that the belt (7)is as flush as possible with the exterior face of the various
pinions and rollers.
Remove: Tool
[3].
Tool [1]from the exhaust camshaft pulley.
Tool [5b]from the tensioner roller (8).
Refit: The lower timing cover
(4)(by moving the engine). The crankshaft pulley (2).
Screw (3)of the crankshaft pulley
Tighten screw (3)to 4 ± 0,4 m.daN, then angular tighten to 53° ± 4°, tool [4].
B1EP1BCDB1EP1BDC
XSARA XSARA PICASSO

Page 181 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
177
CHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Tensioning the timing belt.
Turn the tensioner roller (8)in the direction of the arrow «c», by means of a hexagonal spanner at «d».
Positionner l’index «a»en position «f».
IMPERATVE: The index «a» should go past the slot «g» by an angular value of 10°.
If it does not, replace the tensioner roller or the timing belt and tensioner roller assembly.
Next bring the index «a»to its adjusting position «g», by turning the tensioner roller in the direction of the arrow «e».
WARNING:the index «a»should not pass the slot «g».
Otherwise, repeat the operation to tension the timing belt.
IMPERATIVE: The tensioner roller should not turn during the tightening of its fixing.
If it does, repeat the operation to tension the timing belt.
Tighten the screw (9)of the tensioner roller (8)to 2,1 ± 0,2 m.daN.
IMPERATIVE: The hexagonal tensioner roller drive should be approx. 15° below the level of the cylinder head
gasket «h».
If it is not, replace the tensioner roller or the timing belt and tensioner roller assembly.
B1EP1BEC
B1EP1BFC
XSARA XSARA PICASSO

Page 182 of 523

Downloaded from www.Manualslib.com manuals search engine 178
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Refitting (continued).
Remove the tools [1]and [2].
Rotate the crankshaft ten times (normal direction of rotation).
IMPERATIVE: No pressure or outside force should be brought to bear on the timing belt.
Peg the inlet camshaft pulley, using tool [1].
Checks.
Tension of the timing belt.
ESSENTIAL:Check the position of the index «a», which should be opposite the slot «g».
If the position of the index «a» is not correct,repeat the operations to tension the timing belt.
Refit the upper timing cover (1).
Clip the fuel delivery hose on the timing cover.
Refit the accessories drive belt
(see corresponding operation).
Lower the vehicle.
Reconnect the battery
(see corresponding operation).
B1EP1BEC
B1EP1BFC
XSARA XSARA PICASSO

Page 183 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
179
CHECKING AND SETTING THE VALVE TIMING
Engine: RFS
Tools.
[1]
Belt tension measuring instrument: 4122T
[2]Camshaft pulley locating peg: 9041T.Z Tool kit 7004T
[3]Crankshaft locating peg: 7014T.N
[4]Camshaft pulley locking peg: 4200T.G
[5]Tensioner spanner: 7017T.W
[6]Toothed sector for locking the flywheel: 9044T
Checking the setting.
Turn the engine by the crankshaft screw (1).
Peg the crankshaft using the tool[3].
ESSENTIAL: Check that the crankshaft DAMPERS pulley is in good condition. If the hub/pulley markings
do not line up, the crankshaft pulley must be replaced.
Peg the camshaft using the tool [2](the locating pegs [2]should slide in easily).
If this is not the case, set the timing.
NOTE:Camshaft hubs (see pages 138and 139).
B1EP12GCB1EP12FC
XSARA

Page 204 of 523

Downloaded from www.Manualslib.com manuals search engine 200
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1EP18XC
Adjusting the timing belt tension (continued).
IMPERATIVE: Never rotate the engine backwards.WARNING:
Do not touch or damage the track of the target of the engine speed sensor (14).
Peg the crankshaft, using tool
[3].
Check the position of the tensioner roller
(the alignment of the marks «f»and «g»should be correct).
If this is not the case, repeat the operation to tension the belt.Peg the camshaft pulley, using tool
[2].
IMPERATIVE: Should it be impossible to peg the camshaft, check that the offset between the
camshaft hole and the pegging hole is not more than 1 mm. If the offset is too great, repeat theoperation.
Remove the pegs [2]and [3].
Refit tool
[1]at «a».
Remove the screw
(8).
Complete the refitting.
C3

Page 222 of 523

Downloaded from www.Manualslib.com manuals search engine 218
ENGINECHECKING AND SETTING THE VALVE TIMING
NOTE: Checking and setting the valve timing on engines: RHYRHZ N° ⁄ RPO 9127
See Mechanic’s Handbook 2003: pages 193 to196
Tools.
[1]
Belt tension measuring equipment :4122T
[2]
Tension lever:().0188.J2
[3]
Engine flywheel peg: ().0188.Y
[4]
Belt clamp: ().0188.AD
[5]
Camshaft pulley peg: ().0188.M
[6]
Engine flywheel lock: ().0188.F
[7]
Set of blocking plugs:().0188.T
[8]
Pulley extractor:().0188.P
[9]
2 mm dia.peg: ().0188.Q2Removing.
IMPERATIVE: Respect the safety and cleanliness requirements
that are specific to high pressure diesel injection (HDi) engines.
Undo the front RH wheel bolts.
Raise and support the vehicle on the front RH side.
Disconnect the battery negative terminal.
Remove:
The underengine sounddeadening.
The front RH wheel.
The front RH splashshield. The engine cover.
Unclip and move aside the cooling hose.
Remove the accessories drive belt
(see corresponding operation).
XSARA XSARA PICASSO
Engines: RHY RHZ N° RPO 9128 #

Page 231 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
227
CHECKING THE OIL PRESSURE
To be read with the Petrol and Diesel correspondence tables
Plaque engine XFX KFV NFU 8HX
Temperature (°C) 90°C
Pressure (Bars) 3 4 1,3 3,5
Rpm 2000 4000 1000 4000
Tools (Kit 4103T)
2279T.Bis X X X X
4103T.B X X X X
7001T X X X1503.JX
C3 C3 Pluriel
Plaque engineHFXKFVKFUNFU8HX8HW8HV 8HY
Temperature (°C) 90°C
Pressure (Bars) 3 4 1,3 3,5
Rpm 2000 4000 1000 4000
Tools (Kit 4103T)
2279T.Bis X X X X X X X X
4103T.B X X X X X X X X
7001T X X X X
1503.JXX XX
NOTE:The oil pressure
should be checked with the
engine hot, after the oil level
has been checked.
C2 C3 C3 PLURIEL

Page:   < prev 1-10 11-20 21-30 31-40 41-50 51-60 61-70 70 next >