Pump Citroen C3 2004 1.G Owner's Guide

Page 217 of 523

Downloaded from www.Manualslib.com manuals search engine 213
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Peg the camshaft hub, using tool [4].
Peg the injection pump hub, using tool [3].
Slacken screws (5)and (6).
Slacken screw (9)of the tensioner roller (8).
Remove the timing belt.
Refitting. Retighten screws (5)and (6)by hand.
Turn the pinions (10)and (7)clockwise in order to place them at end of slots.
Fit the timing belt on the crankshaft. Hold the belt, using tool
[5].
Position the timing belt in the following sequence:
Guide roller
(11).
Injection pump pinion (7).
Camshaft pinion (10).
Coolant pump pinion
(12).
Tensioner roller (8).
B1EP16PDB1EP1EDCB1EP132C
XSARA
B1EP1EEC

Page 218 of 523

Downloaded from www.Manualslib.com manuals search engine 214
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1EP1EDC
Setting the timing (continued).
NOTE:
If necessary, you can slightly rotate the pinions (10)and (7)anticlockwise in order to engage the belt.
The angular displacement value of the belt in relation to the pinions should not be more than half a tooth.
Remove tool
[5].
Act on the tensioner roller
(8)by its square «a», using tool [6]to check that the camshaft and injection
pump pinions can turn freely.
Position the belt tension instrument
[7]on the belt at «b».
Using tool
[6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
106 ± 2 SEEM units.
Tighten screws
(9), (5)and (6).
Remove tools
[7], [2], [3]and[4].
Rotate the crankshaft
8 timesin the normal direction of rotation.
Peg the flywheel, using tool
[2].
Peg the camshaft hub, using tool
[4].
Peg the injection pump hub, using tool
[3].
Slacken screws
(9), (5)and (6).
Position the belt tension instrument
[7]on the belt at «b».
Using tool
[6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
42 ± 2 SEEM units.
B1EP1EFC
XSARA

Page 219 of 523

Downloaded from www.Manualslib.com manuals search engine 215
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Tighten:
Screw (9)to 2.1 ± 0.2 m.daN.
Screws (5)to 2,3 ± 0.2 m.daN.
Screws (6)to 2,3 ± 0.2 m.daN.
Remove and refit tool [7].
The tension value should be between 38 and 46 SEEM units.
Remove tools [7], [2], [3] and [4].
Turn the crankshaft 2 timesin the normal direction of rotation.
Peg the flywheel, using the peg [2].
Visually check the peggings of the camshaft and injection pump.
ESSENTIAL:Visually check that the offsets between the holes of
the camshaft and injection pump hubs and the correspondingpegging holes are not more than 1 mm.If necessary, recommence
the procedure for fitting the timing belt.
XSARA
Setting the timing (continued).
Remove the peg [2].
Remove the screw (4)and the washer.
Refit the lower cover (3).
Refit the intermediate cover (2).
Refit the upper cover (1).
Remove the RH engine support.
Take away the workshop hoist. Remove the plugs and recouple the diesel fuel delivery and return
hoses. Refit the accessories drive belt
(see corresponding operation).
Refit the RH lower splashshield. Disengage
5th gear.
Connect the battery.

Page 223 of 523

Downloaded from www.Manualslib.com manuals search engine 219
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Uncouple, plug and move aside, using tool [7], the fuel delivery pipe (2)and return
pipe (1).
Remove:
Screws
(3), (4) and (6).
Screw (7).
The upper timing cover (5).
WARNING:Refit screw (7)equipped with a spacer (17 mm thick), tighten the
screw (7)to 1,5 ± 0,1 m. daN.
NOTE:The screw (7)is one of the screws securing the coolant pump and is there
for its sealing.
Put the gear lever in 5th gear.Turn the road wheel to turn the engine in its direction of rotation.
Orient the camshaft pulley in the pegging position, use a mirror if necessary.
Peg the camshaft, using tool
[5].
Peg the engine flywheel, using tool
[3].
B1EP1A7CB1BP2H3CB1BP2H2CB1BP2R2C
XSARA XSARA PICASSO

Page 224 of 523

Downloaded from www.Manualslib.com manuals search engine 220
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Remove:
The fixings of the pipe linking the power steering pump with the rotary valve.
The clutch lower closing plate.
Lock the engine flywheel, using tool
[6].
Remove the screw (8).
Refit the screw (8)without its thrust washer.
Remove:
The accessories pulley
(9), using tool[8].
Tool [6].
The lower torque reaction rod.
Support the engine by means of a workshop hoist.
Remove:
The bearing shell fitting
(10).
The nut (12).
Screws (11).
The bracket (13).
NOTE:Lift then lower the engine with the workshop hoist, to have access to the
timing cover fixing screws.
Remove:
The intermediate timing cover.
The lower timing cover.
B1CP04BCB1BP2R3CB1BP2R4C
XSARA XSARA PICASSO

Page 225 of 523

Downloaded from www.Manualslib.com manuals search engine 221
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Slacken the screw (17)of the tensioner roller (18).
Remove the timing belt
(14).
Checks.
IMPERATIVE: Just before refitting, carry out the checks below.
Check that:
The rollers
(18)and (15)turn freely (without play and without any tight spot).
The coolant pump pulley
(16)turns freely (without play and without any tight spot).
There are no traces of oil leaks from the crankshaft and camshaft seals, etc.
The crankshaft pinion travels freely on the keyway.
Replace defective components if necessary.
Peg the crankshaft pinion
(19)by inserting tool [9]on the LH side of the keyway.
B1EP1A8DB1EP1A9C
XSARA XSARA PICASSO

Page 226 of 523

Downloaded from www.Manualslib.com manuals search engine 222
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Reposition the timimg belt, belt at «a»well tensioned, in the following order:
Fuel high pressure pump pulley
(21).
Guide roller
(15).
Crankshaft pinion
(19).
Coolant pump pinion
(16).
Tensioner roller
(18).
Position tool
[1]on the belt at «a».
Remove tools
[4]and [9].
Turn the tensioner roller
(18)anticlockwise, using tool [2], to attain an overtension of:
98 ± 2 SEEM units.
Tighten screw
(17)of the tensioner roller to 2,5 ± 0,2 m.da N.
Lock the flywheel by means of tool
[6].
Tighten the accessories drive pulley screw
(8)to 7 ± 0,7 m.da N.
Remove tools
[1], [3], [5] and [6].
Rotate the crankshaft eight times in the normal direction of rotation.
Peg:
The crankshaft, using tool
[3].
The camshaft drive pulley, using tool
[5].
B1EP1ABDB1EP1ACC
XSARA XSARA PICASSO

Page 248 of 523

Downloaded from www.Manualslib.com manuals search engine 244
INJECTION
SAFETY REQUIREMENTS: HDi DIRECT INJECTION SYSTEM
Engines: HDi ALL TYPES
CLEANLINESS REQUIREMENTS.
Preliminary operations.
IMPERATIVE: The technician should wear clean overalls.
Before working on the injection system, it may be necessary to clean the apertures of the following sensitive components:(refer to corresponding procedures) Fuel filter.
High pressure fuel pump.
High pressure fuel injection common rail. High pressure fuel pipes
Diesel injector carriers.
IMPERATIVE: After dismantling, immediately block the apertures of the sensitive components with plugs, to avoid the entry of impurities.
Work area.
The work area must be clean and free of clutter.
Components being worked on must be protected from dust contamination.

Page 249 of 523

Downloaded from www.Manualslib.com manuals search engine 245
INJECTION
PROHIBITED OPERATIONS: SIEMENS HDI DIRECT INJECTION SYSTEM
Engines: 8HX 8HW 8HZ
Cleaning.
The use of high pressure cleaners is prohibited.
Do not use compressed air.
Fuel supply circuit.
Required fuel: diesel.
Electric circuit.
Swapping injection ECUs between two vehicles will render it impossible to start either vehicle.
It is forbidden to supply a diesel injector with
12 volts.
High pressure fuel pump.
Do not separate the following components from the high pressure fuel pump (5):
Sealing ring
(a)(no replacement parts).
High pressure outlet connector
(b)(will cause a malfunction).
PS: HDi = High pressure Diesel injection
B1HP1K9C
C2 C3 XSARA

Page 251 of 523

Downloaded from www.Manualslib.com manuals search engine 247
INJECTION
PROHIBITED OPERATIONS: DELPHI HDI DIRECT INJECTION SYSTEM
Engines: 8HY 8HV
Cleaning.
The use of high pressure cleaners is prohibited.
Do not use compressed air.
Fuel supply circuit.
Required fuel: diesel.
Electric circuit.
Swapping injection ECUs between two vehicles will render it impossible to start either vehicle.
It is forbidden to supply a diesel injector with
12 volts.
High pressure fuel pump.
Do not separate the following components from the high pressure fuel pump (5):
Sealing ring
(a) (no replacement parts).
High pressure outlet connector
(b)(will cause a malfunction).
PS:HDi = High pressure Diesel injection
B1HP1J6C
C3

Page:   < prev 1-10 11-20 21-30 31-40 41-50 51-60 61-70 70 next >