pressure Citroen C3 2004 1.G Repair Manual

Page 270 of 523

Downloaded from www.Manualslib.com manuals search engine 266
INJECTION
CHECKS: TURBO PRESSURE
Engine: RHZ
XSARA PICASSO
Tools.
[1]
Pressure gauge for checking boost pressure: 4073T.A Kit 4073T
[2]Sleeve for checking boost pressure: 4185T
[3]Adaptor sleeve: 4229T
Checks.
IMPERATIVE: respect the following checking requirements: Engine at running
temperature. Vehicle in running order at full load.
Preparation.
Remove the collar fixing (3).
Insert the tool [2]connected with tool [3], between the pipe (1)and the duct (2).
Position tool [1]in the vehicle.
Connect the sleeve [2]to the tool [1]with its tube «a».Procedure. Start the engine.
Engage first gear and start the engine.
Engage the gears up to third gear.
Decelerate to
1000 rpm.
Accelerate hard, and check the pressure:0.6 ± 0.05 Bar (1500 rpm).
Accelerate freely in kickdown (changing from fourth to third gear).
Check the pressure:0.95 ± 0.05 Bar(between 2500 and 3500 rpm).
Remove the tools, reposition the pipe (1)and refit the collar (3).B1HP12JD

Page 271 of 523

Downloaded from www.Manualslib.com manuals search engine 267
INJECTION
CHECKS: TURBO PRESSURE
Engine: RHY
Tools.
[1]
Pressure gauge for checking boost pressure: 4073T.A Kit 4073T
[2]Sleeve for checking boost pressure: 4185T
Checks.
IMPERATIVE: respect the following checking requirements: Engine at running temperature.
Vehicle running at full load.
Preparation.
Remove the collar (3) and the sleeve.
Insert the tool [2]between the pipe (1)and the duct (2).
Position tool [1]in the vehicle.
Connect the pressure gauge [1]to the tool [2]with its tube «a»long enough for the gauge to
be positioned inside the vehicle.
Procedure. Start the engine.
Engage first gear and start the engine.
Engage the gears up to third gear.
Decelerate to
2000 rpm.
Gradually accelerate.
Check the pressure:
0.95 ± 0.05 Bar Remove the tools, refit the collars (3)and the sleeve.B1BP1ZXD
XSARA PICASSO

Page 272 of 523

Downloaded from www.Manualslib.com manuals search engine 268
INJECTION
CHECKING THE AIR SUPPLY CIRCUIT
Tools.
[1]
Manual pressurevacuum pump: FACOM DA 16
Vacuum pump:
Connect the tool [1]onto the vacuum pump (1).
Start the engine.
Wait 30 seconds.
The vacuum value should be
0.9 ±0.1 barat idle.
B1HP1K8D
Engines: 8HX 8HW 8HY 8HV
C2 C3

Page 273 of 523

Downloaded from www.Manualslib.com manuals search engine 269
INJECTION
CHECKING THE AIR SUPPLY CIRCUIT
Engines: RHY RHZ
XSARA PICASSO
Tools.
[1]Manual vacuum pump : FACOM DA 16
IMPERATIVE: Respect the safety and cleanliness requirements.
Vacuum pump.
Connect the tool [1]on the vacuum pump (1).
Start the engine.
Pressure should be
0.8 barat 780 rpm.Boost pressure regulator electrovalve. Connect the tool [1]between the electrovalve (2)and the valve (3)of the boost pressure
regulator.
Compare readings with the values in the table below.
Pressure regulator valve. Connect the tool [1]on the valve (3).
Appy a pressure of 0.5 barto activate the rod "a":
Rod "a"should be moved 12 mm.
Engine speed (rpm) Pressure (Bar)
780 0,6
4000 0,25
B1HP12FD

Page 274 of 523

Downloaded from www.Manualslib.com manuals search engine 270
INJECTION
CHECKS: EXHAUST GASES RECYCLING CIRCUIT
Engines: 8HX 8HW
Engines: 8HV 8HY
Tools.
[1]
Manual pressurevacuum pump: FACOM DA 16
IMPERATIVE: Respect the safety and cleanliness specific to high pressure diesel
injection (HDi) engines.
EGR v
alve.Connect tool [1]on the capsule takeoff (2).
Apply a vacuum of approx.0,6 barseveral times to activate the rod «a».
In abruptly suppressing the vacuum, the valve should click and lock itself back on its seating.
Regulation electrovalve (EGR).(Engine:8HX8HW).Check to be performed between the electrovalve (1)and the EGR valve (2).
Link the tool [1]in series, between the electrovalve (1)and the capsule (2).
Compare the values noted with those in the table below.
Regulation electrovalve (EGR).(Engine:8HV8HY).Check to be performed between the electrovalve (2)and the EGR valve (1).
Link the tool [1] in series, between the electrovalve (2)and the capsule (1).
Compare the values noted with those in the table below.
Engine speed (rpm) Vacuum value
780 0,5
2500 0
B1HP15GD
B1HP1K6D
C2 C3

Page 277 of 523

Downloaded from www.Manualslib.com manuals search engine 273
INJECTION
PARTICLE FILTER SAFETY AND CLEANLINESS REQUIREMENTS
General.
ESSENTIAL: Given the very high pressures prevailing in the fuel high pressure circuit (1600 Bars), respect the following regulations.
It is forbidden to smoke in the immediate proximity of the high pressure circuit during a repair.
Avoid working close to flames or sparks.When the engine is running:
Do touch the fuel high pressure circuit.
Always keep out of range of possible projections of fuel, which could cause serious injuries.
Do not place your hand near to any leak on the fuel high pressure circuit. After the engine has stopped, wait 30 seconds before starting any operation.
NOTE:The waiting time is necessary to allow the fuel high pressure circuit to return to atmospheric pressure.
Safety rules.
IMPERATIVE:Wait at least an hour before starting any repair on the exhaust line.
Forced regeneration of the particle filter:
Check that there are no aerosols or inflammable products inside the vehicle’s boot.
Wear high temperature gloves.
Connect the vehicle to a gas extractor approved for this type of operation.
IMPERATIVE: In the absence of the required installations, carry out the forced regeneration of the particle filter outside the workshop,
in a concreted area well away from any inflammable materials. Place the vehicle in the high position.
ALL TYPES

Page 278 of 523

Downloaded from www.Manualslib.com manuals search engine 274
INJECTION
PARTICLE FILTER SAFETY AND CLEANLINESS REQUIREMENTS
Operations on the fuel additive circuit.
IMPERATIVE: For all operations on the additive circuit, wear protective goggles and gloves that are resistant to hydrocarbons.
The work area must be ventilated.
In the event of any significant dispersion of additive:
Wear a breathing mask for filtering the particles.
Recover as much of the product as possible.
Place the product thus recovered in an appropriately labelled container. Wash the soiled area with copious amounts of water.
Dispose of materials and solid residues in an authorised recovery point.
IMPERATIVE:The filling kit should be recycled following a repair. All «Eolys» additive containers that have been opened should be
disposed of.
Cleanliness rules.
ESSENTIAL: The operator should wear clean overalls.
Before working on the injection circuit, it may be necessary to clean the unions of the following sensitive components(see corresponding operations).
Fuel filter.
Fuel high pressure pump.
Fuel high pressure regulator.
Fuel high pressure common injection rail. Fuel high pressure piping. Diesel injector carriers.
IMPERATIVE: After dismantling, immediately blank the unions of the sensitive components with plugs, to prevent any ingress of impurities.
ALL TYPES

Page 281 of 523

Downloaded from www.Manualslib.com manuals search engine 277
INJECTION
SPECIAL FEATURES: PARTICLE FILTER / CHECKING THE ADDITIVE PUMP
Engine: 9 HZ
IMPERATIVE: Respect the safety and cleanliness requirements.
Tools.
[1]
Manual pressure/vacuum pump: FACOM DA 16
[2]Additive container: ().1613.G Kit 1613
Checks.
IMPERATIVE: Respect the safety and cleanliness requirements specific to HDi engines.
IMPERATIVE: For all operations on the additive circuit, wear protective goggles and gloves that are
resistant to hydrocarbons.
Place the vehicle on a lift.
Raise the vehicle
To test the flow of the additive pump :
Uncouple the tube
(1).
Couple tool [2]on the outlet «a»of the additive reservoir.
Operate for 50 secondsthe actuator test «Additive pump»with the aid of LEXIA or PROXIA.
IMPERATIVE:The volume collected by the tool [2] should be 20 ± 5 ml.
NOTE:
Replace the additive pump if it is defective.
Couple the tube (1).
Operate the actuator test «Filling the tube: additive pump – additive injector», with the aid of LEXIAorPROXIA.
B1HP1UTC
XSARA PICASSO

Page 282 of 523

Downloaded from www.Manualslib.com manuals search engine 278
INJECTION
SPECIAL FEATURES: PARTICLE FILTER / CHECKING THE ADDITIVE PUMP
Sealing of the additive injector.
Couple tool [1] to the tube (1).
Action the manual pump [1].
WARNING:The additive injector should open at a pressure of 100 ± 20 Bars.
Action the manual pump in vacuum
[1]at 800 m.bars.
WARNING:The downstream pressure should not fall rapidly.
NOTE:Replace the fuel tank if the injector is defective.
Couple the tube
(1).
Operate the actuator test «Filling the tube: additive pump – additive injector», with the aid ofLEXIAor PROXIA.
Check the additive level.
The checking of the additive level is done with reference to the gradations «a»marked on the additive
reservoir.
The top graduation indicates maximum filling
(3 Litres).
The difference between the two gradations equates to 0,25 Litres.
XSARA PICASSO
B1HP1UUC
B1KP019C

Page 341 of 523

Downloaded from www.Manualslib.com manuals search engine 337
CLUTCH
GEARBOX
TRANSMISSION
AL4 AUTOMATIC GEARBOX
Tightening torques (m.daN).
(1)
Oil flow modulation electrovalve fixing: 1 ± 0,2
(2)
Heat exchanger fixing:5 ±1
(3)
Output speed sensor fixing:1 ±0,2
(4)
Output speed sensor fixing: 1 ± 0,2
(5)
Oil overflow and drain fixing: 4 ± 0,2
(6)
Oil level plug:2,4 ±0,4
(7)
Oil pressure sensor fixing: 0,8 ± 0,1
Engines: KFV NFU RFN RHZ
C3 XSARA XSARA PICASSO
B2CP3EDDB2CP311D

Page:   < prev 1-10 ... 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 ... 100 next >