fuel pipe Citroen C3 2004 1.G Workshop Manual

Page 92 of 523

Downloaded from www.Manualslib.com manuals search engine 88
ENGINESPECIAL FEATURES TIGHTENING TORQUES (m.daN )
Engines8HV 8HY
Flywheel Clutch
Flywheel 1,7 ± 0,2
Clutch mechanism 2 ± 0,2
Lubrication circuit
Oil pump assembly0,9 ± 0,1
Oil/coolant heat exchanger 1 ± 0,1
Turbocharger lubrication pipe2,2 ± 0,2
Injection circuit
Injector fixing flange nut
Tightening0,4 ±0,1
Angular tightening65° ± 5°
Fuel high pressure pump
Union on diesel injector
Fuel high pressure pump pinion 5 ± 0,5
Union on fuel high pressure pump2,3 ± 0,2
Cooling circuit
Coolant pump1 ± 0,2±
C3

Page 98 of 523

Downloaded from www.Manualslib.com manuals search engine 94
ENGINESPECIAL FEATURES TIGHTENING TORQUES (m.daN )
Engines9HZ 9HY
Lubrication circuit
Oil pump assembly
Pretightening0,5 ± 0,1
Tightening0,9 ± 0,1
Oil/coolant heat exchanger 1 ± 0,2
Turbocharger lubrication pipe3 ± 0,5
Diesel injection circuit
Injector fixing flange nut
Pretightening4 ± 0,1
Angular tightening65° ± 5°
Fuel high pressure common injection rail on engine block 2,2 ± 0,2Union on fuel high pressure common injection rail
Pretightening1,7 ±0,2
Tightening2,2 ±0,2
Diesel injection pump on support2,2 ± 0,2
Union on diesel injector
Pretightening2 ± 0,5
Tightening2,5 ±0,3
XSARA PICASSO

Page 200 of 523

Downloaded from www.Manualslib.com manuals search engine 196
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1BP2N0C
Checks (continued).
Refit:
The engine support (7), tighten to 1,5 ± 0,4 m.daN.
The engine support
(4), tighten to 6,1 ± 0,6 m.daN.
The engine support
(5), tighten to 6 ± 0,6 m.daN.
The electrical harness
(6).
Couple:
The exhaust line, tighten the collar to : 2,5 ± 0,3 m daN.
The fuel supply unions
(1).
The air/air heat exchanger inlet/outlet pipes
(3).
Connect the connector
(2).
Refit:
The accessories belt (see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH road wheel, tighten to
9 ±1 m.daN.
Reconnect the battery.
C3

Page 205 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
201
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1BP304D
Tools.
[1]
Flywheel setting peg: ().0194.C
[2]
Camshaft setting peg:().0194.B
[3]
Crankshaft setting peg: ().0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove: The front RH wheel.
The front RH splashshield.
The accessories drive belt
(see corresponding operation).
Uncouple: The fuel supply unions
(1).
The air/air heat exchanger inlet and outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connecter at
«a».
Remove and move aside the power steering fluid reservoir
(6).
Uncouple, plug and move aside the tube
(2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports
(4)and (5).
XSARA PICASSO

Page 208 of 523

Downloaded from www.Manualslib.com manuals search engine 204
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to 5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
The tube (2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH wheel, tighten to 9 ±1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE:Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 209 of 523

Downloaded from www.Manualslib.com manuals search engine 205
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
B1BP304D
Tools.
[1]
Flywheel setting peg: ().0194.C
[2]
Camshaft setting peg:().0194.B
[3]
Crankshaft setting peg: ().0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove: The front RH wheel.
The front RH splashshield.
The accessories drive belt
(see corresponding operation).
Uncouple:
The fuel supply unions
(1).
The air/air heat exchanger inlet and outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connecter at
«a».
Remove and move aside the power steering fluid reservoir
(6).
Uncouple, plug and move aside the tube
(2).
Support the engine with a roller jack equipped with a block.Remove the engine supports
(4)and (5).
XSARA PICASSO

Page 214 of 523

Downloaded from www.Manualslib.com manuals search engine 210
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
The upper timing cover
(12).
The lower timing cover (11).
The accessories drive pulley (9).
The screw (10).
Tightening torqueScrew (10)Pretighten to:3 ± 0,3 m.daN.
Angular tighten:180°±5°.
Remove tool [1].
Refit:
The engine support
(8), tighten to5,5 ± 0,4 m.daN.
The engine support (4), tighten to 6,1 ±0,6 m.daN.
The engine support (5), tighten to 2,5 ±0,2 m.daN.
The electrical harness (7).
The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
The tube
(2).
The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
The fuel unions (1).
The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
The accessories drive belt
(see corresponding operation).
The front RH splashshield (see corresponding operation).
The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following a
reconnection of the battery (see corresponding operation).

Page 223 of 523

Downloaded from www.Manualslib.com manuals search engine 219
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Uncouple, plug and move aside, using tool [7], the fuel delivery pipe (2)and return
pipe (1).
Remove:
Screws
(3), (4) and (6).
Screw (7).
The upper timing cover (5).
WARNING:Refit screw (7)equipped with a spacer (17 mm thick), tighten the
screw (7)to 1,5 ± 0,1 m. daN.
NOTE:The screw (7)is one of the screws securing the coolant pump and is there
for its sealing.
Put the gear lever in 5th gear.Turn the road wheel to turn the engine in its direction of rotation.
Orient the camshaft pulley in the pegging position, use a mirror if necessary.
Peg the camshaft, using tool
[5].
Peg the engine flywheel, using tool
[3].
B1EP1A7CB1BP2H3CB1BP2H2CB1BP2R2C
XSARA XSARA PICASSO

Page 228 of 523

Downloaded from www.Manualslib.com manuals search engine 224
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY RHZ N° RPO 9128 #
Remove:
Tools [3]and [5].
Screw (7)and the spacer.
Refit: The lower, intermediate and upper covers
(5).
Screw (7), tighten to 1,5 ± 0,1 m.daN.
Screws (3), (4)and (6).
The bracket (13).
Screws (11), tighten to 6,1 ± 0,5 m.daN.
The nut (12), tighten to 4,5 ± 0,5 m.daN.
Fit the bearing shell (10).
Take away the workshop hoist.
Clip the fuel delivery and return pipes. Remove the tool
[7].
Couple:
The fuel delivery pipe
(12).
The fuel return pipe (1).
Coat the screw (8)with loctite FRENETANCH.
Refit the tool [6]and the screw (8)with the washer (22),
Tighten to 7 ± 0,2 m.daNand angular tighten to A = 60° ± 5°
[6].
Reposition and reclip the cooling hose.
Complete the refitting of components in reverse order to removal.
B1EP1A7CB1BP2R4CB1EP1ADC
XSARA XSARA PICASSO

Page 248 of 523

Downloaded from www.Manualslib.com manuals search engine 244
INJECTION
SAFETY REQUIREMENTS: HDi DIRECT INJECTION SYSTEM
Engines: HDi ALL TYPES
CLEANLINESS REQUIREMENTS.
Preliminary operations.
IMPERATIVE: The technician should wear clean overalls.
Before working on the injection system, it may be necessary to clean the apertures of the following sensitive components:(refer to corresponding procedures) Fuel filter.
High pressure fuel pump.
High pressure fuel injection common rail. High pressure fuel pipes
Diesel injector carriers.
IMPERATIVE: After dismantling, immediately block the apertures of the sensitive components with plugs, to avoid the entry of impurities.
Work area.
The work area must be clean and free of clutter.
Components being worked on must be protected from dust contamination.

Page:   1-10 11-20 next >