check engine Citroen XSARA PICASSO 2004 1.G Repair Manual

Page 191 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
187
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX 8HW 8HZ
Setting the timing (contin
ued).
Remove the tool [3].
Rotate the engine by means of the crankshaft pinion screw
(2)(clock
wise), to bring it to the pegging position.
Peg the camshaft pulley, using tool
[4].
Peg:
The crankshaft pinion
(6), using tool [5].
The high pressure pump pinion, using tool [5].
Support the engine with the aid of a roller jack equipped with a chock.
Remove:
The RH engine support
(7).
The intermediate engine support (right hand side)(8).
B1JP03SCB1EP18DCB1EP195CB1BP2LYC
C2 C3 C3 PLURIEL XSARA

Page 192 of 523

Downloaded from www.Manualslib.com manuals search engine 188
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX 8HW 8HZ
B1EP18HC
Setting the timing (continued).
Hold the tensioner roller, using a hexagonal spanner at «b».
Slacken the screw (9).
Remove the timing belt (10).
Refitting.
IMPERATIVE: Check that both the tensioner roller and the fixed roller turn freely
(no tight spots). If this is not the case, replace the rollers.
Fitting of the pulle
ys.
Camshaft pulley: Tighten to 4,3 ± 0,4 m.daN.
Fuel high pressure pump pulley: Tighten to 5 ± 0,5 m.daN.
The crankshaft pinion is located without a screw at the end of the crankshaft.
Fitting of the rollers.
IMPERATIVE: Check that the tensioner roller turns freely (no tight spot).Otherwise, replace the rollers.
Guide roller:Tighten to 4,5 ± 0,4 m.daN.
Tensioner roller :Pretighten to 0,1 m.daN.
Check the condition of the seals at the camshaft and at the crankshaft pinion.
C2 C3 C3 PLURIEL XSARA

Page 193 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
189
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX 8HW 8HZ
B1EP18JD
Setting the timing (continued).
NOTE:
Screw (9)slackened.
Position the timing belt
(10)observing the following sequence:
Crankshaft pinion
(4).
Guide roller
(12).
Camshaft pulley
(11)(check that the belt is held correctly against the roller).
Coolant pump pinion
(13).
Fuel high pressure pump pulley
(15).
Tensioner roller
(14).
C2 C3 C3 PLURIEL XSARA

Page 194 of 523

Downloaded from www.Manualslib.com manuals search engine 190
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX 8HW 8HZ
B1EP18KC
Setting the timing (continued).
Turn the tensioner roller to the right to bring the index «c»to position «d», using a
hexagonal spanner.
Tighten the screw
(9)of the tensioner roller, tighten to 3 ± 0,3 m.daN.
Remove the tools [4]and [5].
Rotate the engine
ten times(check that the timing pinion is correctly up against the
crankshaft).
Check:
The pegging of the camshaft.
The crankshaft pinion.
The fuel high pressure pump pinion
(15).
The correct positioning of the index of the dynamic tensioner.
If these are not correct, repeat the operation to position the timing belt.Refit:
The engine speed sensor
(6).
The belt retaining stop (5), tighten to 0,7 m.daN.
C2 C3 C3 PLURIEL XSARA

Page 195 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
191
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX 8HW 8HZ
B1EP18LCB1BP2LZC
Setting the timing (continued).
Refit:
The intermediate RH engine support, tighten the screws
(16)to 5,5 ± 0,5 m.daN.
The RH engine support, tighten the screws
(17)to 4,5 ± 0,4 m.daN.
The bottom timing cover
(3).
Immobilise the engine flywheel, using tool
[3].
Remove the screw
(2).
Refit the accessories drive pulley and tighten to:
Pretighten to
: 3 ± 0,3 m.daN.
Angular tighten to
:180° ± 1,8°.
Remove tool
[3].
Refit:
The top cover
(1).
The accessories belt
(see corresponding operation).
The exhaust line
(see corresponding operation).
The front RH splashshield. The front RH wheel.
C2 C3 C3 PLURIEL XSARA

Page 196 of 523

Downloaded from www.Manualslib.com manuals search engine 192
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1BP2N0C
Tools.
[1]
Engine flywheel peg Ø 12 mm : ().0194C
[2]
Camshaft pulley peg Ø 8 mm : ().0194B
[3]
Crankshaft pulley peg Ø 5 mm : ().0194A
Preliminar
y operations.
Remove:
The front RH wheel.
The front RH splashshield.
The accessories belt
(see corresponding operation).
Uncouple:
The supply unions
(1).
The air/air heat exchanger inlet/outlet pipes
(3).
The exhaust line
(at the flexible pipe).
Disconnect the connector
(2).
Support the engine by means of a roller jack equipped with a chock.
Remove the engine supports
(4) and(5).
C3

Page 197 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
193
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1BP2N1CB1BP2N2C
Checks.
Rotate the engine to engage it (normal direction of rotation).
Immobilise the engine flywheel at
«a», using tool [1].
Move aside the harness
(6).
Remove: The engine support
(7).
The screw
(8).
The pulley
(9).
The lower timing cover
(10).
The upper timing cover
(11).
The tool
[1].
C3

Page 198 of 523

Downloaded from www.Manualslib.com manuals search engine 194
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1EP18YD
Checks (continued).
Refit the screw (8).
Rotate the crankshaft six times
(clockwise).
IMPERATIVE: Never rotate the engine backwards.
Peg:
The camshaft, using tool
[2](oil the pegs).
The fuel high pressure pump pulley (14), using tool [3]at «c».
WARNING:The magnetic track should show no signs of damage and should not be
approached by any source of magnetism.
Peg the crankshaft at
«b», using tool [3].
IMPERATIVE:Should it be impossible to peg the camshaft, check that the
offset between the hole in the camshaft pinion and the pegging hole is not
greater than 1 mm.Otherwise repeat the operation to position the timing belt
(see corresponding
operation)
.
C3

Page 199 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
195
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1EP18ZC
Checks (continued).
NOTE:
The index «e»of the dynamic tensioner roller should be centred within the area «d».
Check the correct positioning of the index
«e».
If it is not correct, repeat the operation to tension the timing belt
(see corresponding operation).
Refitting.
Refit the tool [1]at «a».
Remove the screw
(8).
Refit:
The upper timing cover
(11).
The lower timing cover
(10).
The accessories drive pulley
(9).
The screw
(8).
Tightening torque.
Screw (8):
Pretighten to
:3 ±0,3 m.daN.
Angular tightening
:180° ± 5°.
Remove the tool
[1].
C3

Page 200 of 523

Downloaded from www.Manualslib.com manuals search engine 196
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HY 8HV
B1BP2N0C
Checks (continued).
Refit:
The engine support (7), tighten to 1,5 ± 0,4 m.daN.
The engine support
(4), tighten to 6,1 ± 0,6 m.daN.
The engine support
(5), tighten to 6 ± 0,6 m.daN.
The electrical harness
(6).
Couple:
The exhaust line, tighten the collar to : 2,5 ± 0,3 m daN.
The fuel supply unions
(1).
The air/air heat exchanger inlet/outlet pipes
(3).
Connect the connector
(2).
Refit:
The accessories belt (see corresponding operation).
The front RH splashshield
(see corresponding operation).
The front RH road wheel, tighten to
9 ±1 m.daN.
Reconnect the battery.
C3

Page:   < prev 1-10 ... 21-30 31-40 41-50 51-60 61-70 71-80 81-90 91-100 101-110 ... 190 next >