sensor SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual

Page 409 of 557

6E1-18 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1
2
43
1. MAP sensor
2. 1.5 V battery (4.5 V in total)
3. Vacuum pump
4. Digital type voltmeter
MANIFOLD ABSOLUTE PRESSURE SENSOR
(MAP SENSOR)
MAP SENSOR INDIVIDUAL CHECK
1) Disconnect MAP sensor vacuum hose from filter.
2) Disconnect coupler from MAP sensor.
3) Remove MAP sensor.
4) Arrange 3 new 1.5 V batteries in series (check that total voltage
is 4.5 – 5.0 V) and connect its positive terminal to “Vin” terminal
of sensor and negative terminal to “Ground” terminal. Then
check voltage between “Vout” and “Ground”.
Also, check if voltage reduces when vacuum is applied up to
40 cmHg by using vacuum pump.
Output voltage (Vin voltage 4.5 – 5.0 V, ambient temp.
20 – 30C, 68 – 86F)
ALTITUDE
(Reference)
BAROMETRIC
PRESSUREOUTPUT
VOLTAGE
(ft)(m)(mmHg)KPa(V)
0
|
2 0000
|
610760
|
707100
|
94
3.1 – 3.6
2 001
|
5 000611
|
1 524Under 707
over 63494
|
85
2.8 – 3.4
5 001
|
8 0001 525
|
2 438Under 634
over 56785
|
76
2.6 – 3.1
8 001
|
10 0002 439
|
3 048Under 567
over 52676
|
70
2.4 – 2.9
If check result is not satisfactory, replace MAP sensor.
5) Install MAP sensor and connect vacuum hose securely.
6) Connect MAP sensor coupler securely.

Page 410 of 557

ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-19
1. TP sensor
2. TP sensor
adjusting holes
3. TP sensor
screw holes4. Turn TP sensor after
fitting and align holes.
1. Throttle stop screw
2. Throttle lever
3. Thickness gauge
THROTTLE POSITION SENSOR (TP SENSOR)
INSPECTION
Check TP sensor referring to step 2 of DTC P0121 Flow Table. If
malfunction is found, replace.
REMOVAL
1) Disconnect battery negative cable at battery.
2) Remove air cleaner assembly referring to Section 6A.
3) Disconnect coupler from TP sensor.
4) Remove TP sensor from throttle body.
INSTALLATION
1) Install TP sensor to throttle body.
Fit TP sensor to throttle body in such way that its adjusting holes
are a little away from TP sensor screw holes as shown in left fig-
ure and turn TP sensor clockwise so that those holes align.
Then hand-tighten TP sensor screws.
2) Connect coupler to TP sensor securely.
3) Install air cleaner assembly referring to Section 6A.
4) Connect battery negative cable battery.
5) Adjust installation angle of TP sensor according to procedure
described in item “ADJUSTMENT”.
ADJUSTMENT
1) Insert 3.5 mm (0.14 in.) thickness gauge between throttle stop
screw and throttle lever.
CAUTION:
As throttle stop screw is factory adjusted precisely, don’t
remove or adjust it.

Page 411 of 557

6E1-20 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Plunger
2. Throttle lever screw
2) Check to make sure that plunger of ISC actuator and throttle le-
ver screw are not in contact with each other. If they are, warm
up engine.
3) Loosen TP sensor screws.
a) Connect SUZUKI scan tool to DLC with ignition switch OFF.
b) Select “Data List” mode on SUZUKI scan tool.
c) Observe TP sensor voltage.
4) Turn TP sensor clockwise or counterclockwise and tighten TP
sensor screw at a position where voltage as specified below is
obtained.
TP sensor voltage when lever-to-stop
screw clearance is 3.5 mm (0.14 in.) : 0.98 – 1.02 V
Tightening Torque
(a): 2.0 N
.m (0.20 kg-m, 1.5 lb-ft)
5) Install ECM and connect couplers securely.
INTAKE AIR TEMPERATURE SENSOR (IAT SENSOR)
REMOVAL
1) Disconnect battery negative cable at battery.
2) Disconnect coupler from IAT sensor.
3) Remove IAT sensor and gasket from air cleaner case.

Page 412 of 557

ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-21
( ) for reference kΩ
TEMPERATURE 0
3220
6840
10460
14080C
176F (5.88)
2.21–2.69
(1.14)
(0.58)
0.29–0.35
2
1
1. ECT sensor
2. Distributor
INSPECTION
Immerse temperature sensing part of IAT sensor in water (or ice)
and measure resistance between sensor terminals while heating
water gradually.
If measured resistance doesn’t show such characteristic as shown
in left figure, replace IAT sensor.
INSTALLATION
Reverse removal procedure noting the following.
Clean mating surfaces of IAT sensor and air cleaner case.
Connect IAT sensor coupler securely.
ENGINE COOLANT TEMPERATURE SENSOR
(ECT SENSOR)
REMOVAL
1) Disconnect battery negative cable at battery.
2) Drain coolant referring to Section 6B.
WARNING:
To help avoid danger of being burned, do not remove radia-
tor cap while engine and radiator are still hot. Scalding fluid
and steam can be blown out under pressure if cap is taken
off too soon.
3) Disconnect coupler from ECT sensor.
4) Remove ECT sensor from thermostat case.

Page 413 of 557

6E1-22 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
( ) for reference kΩ
TEMPERATURE 0
3220
6840
10460
14080C
176F (5.74)
2.28–2.61
(1.15)
(0.584)
0.303–0.326
1. ECT sensor
2. Distributor
INSPECTION
Immerse temperature sensing part of ECT sensor in water (or ice)
and measure resistance between sensor terminals while heating
water gradually.
If measured resistance doesn’t show such characteristic as shown
in left figure, replace ECT sensor.
INSTALLATION
Reverse removal procedure noting the following.
Clean mating surfaces of ECT sensor and thermostat case.
Check O-ring for damage and replace if necessary.
Tighten ECT sensor to specified torque.
Tightening Torque
(a): 15 N
.m (1.5 kg-m, 11.0 lb-ft)
Connect coupler to ECT sensor securely.
Refill coolant referring to Section 6B.

Page 414 of 557

ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-23
1. Viewed from terminal side
1. Exhaust manifold
2. Heated oxygen sensor
Sensor-1
Sensor-2
HEATED OXYGEN SENSOR (SENSOR-1 AND
SENSOR-2)
OXYGEN SENSOR HEATER INSPECTION
1) Disconnect sensor coupler.
2) Using ohmmeter, measure resistance between terminals “V
B”
and “GND” of sensor coupler.
NOTE:
Temperature of sensor affects resistance value largely.
Make sure that sensor heater is at correct temperature.
Resistance of oxygen sensor heater:
11.7 – 14.3 Ω at 20C, 68F
If found faulty, replace oxygen sensor.
3) Connect sensor coupler securely.
REMOVAL
WARNING:
To avoid danger of being burned, do not touch exhaust system
when system is hot. Oxygen sensor removal should be per-
formed when system is cool.
1) Disconnect negative cable from battery.
2) Hoist vehicle when removing sensor-2.
3) Disconnect coupler of heated oxygen sensor and release its
wire harness from clamps.
4) Remove heated oxygen sensor from exhaust manifold.
INSTALLATION
Reverse removal procedure noting the following.
Tighten heated oxygen sensor to specified torque.
Tightening Torque for heated oxygen sensor
45 N
.m (4.5 kg-m, 32.5 lb-ft)
Connect coupler of heated oxygen sensor and clamp wire har-
ness securely.
After installing heated oxygen sensor, start engine and check that
no exhaust gas leakage exists.

Page 415 of 557

6E1-24 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
VEHICLE SPEED SENSOR (VSS) For M / T
INSPECTION
1) Disconnect negative cable at battery.
2) Remove combination meter from instrument panel.
3) Connect ohmmeter between “VSS” terminal (2) and “GND” ter-
minal (3) of combination meter and turn cable joint (1) of
speedometer with a screwdriver. Ohmmeter indicator should
move back and forth between 0 (zero) and ∞ (infinity) 4 times
while cable joint is turned one full revolution.
Replace speedometer if check result is not satisfactory.
4) Install combination meter to instrument panel.
5) Connect negative cable at battery.
VEHICLE SPEED SENSOR (VSS) For A / T
INSPECTION
Vehicle speed sensor (1) itself can be checked on its resistance by
disconnecting connector.
NOTE:
Function of vehicle speed sensor can be checked by mea-
suring generated pulse as voltage.
For its measurement, use an analog type voltmeter while
spinning wheels on lift and with selector lever in D position.
Vehicle speed sensor specifications
Coil resistance100 – 300 Ω
Output voltage at 40 km / h (25 mile / h)approximately 1 V
FUEL LEVEL SENSOR (GAUGE)
Refer to Section 8.

Page 416 of 557

ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-25
1. Main relay
2. Relay box
CRANKSHAFT POSITION SENSOR
INSPECTION
Check crankshaft position sensor referring to step 1 and 2 of DTC
P0335 Flow Chart. If malfunction is found, replace.
REMOVAL
1) Hoist vehicle.
2) Remove fender apron extension on right side.
3) Disconnect connector from crankshaft position sensor.
4) Remove crankshaft position sensor from oil pan.
INSTALLATION
1) Check to make sure that crankshaft position sensor and pulley
tooth is free from any metal particles and damage.
2) Install crankshaft position sensor to oil pan.
3) Connect connector to it securely.
4) Install fender apron extension.
MAIN RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove main relay from relay box.
3) Check resistance between each two terminals as in table below.
If check results are as specified, proceed to next operation
check. If not, replace.
TERMINALS
RESISTANCE
Between A and B∞ (infinity)
Between C and D100 – 120 Ω
4) Check that there is continuity between terminals “A” and “B”
when battery is connected to terminals “C” and “D”.
If found defective, replace.

Page 421 of 557

6E1-30 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Insulator
2. Lower gasket
3. Heater
1. Intake manifold
2. EFE heater
1. EFE heater relay
2. Relay box
1. Radiator fan motor
INSPECTION
Check lower gasket for damage and deterioration. Replace as
necessary.
Check heater and insulator for crack, corrosion or any other dam-
age. Replace as necessary.
INSTALLATION
1) Clean mating surfaces of throttle body and intake manifold that
mate with EFE heater.
2) Install EFE heater to intake manifold.
Use new upper gasket.
3) Install throttle body according to procedure described previous-
ly.
4) Connect EFE heater coupler.
EFE HEATER RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove EFE heater relay from relay box.
3) Structure of EFE heater relay is the same as that of main relay.
Check its resistance and operation using the same procedure as
that for main relay.
If found defective, replace.
RADIATOR FAN CONTROL SYSTEM
SYSTEM INSPECTION
WARNING:
Keep hands, tools, and clothing away from engine cooling
fan to help prevent personal injury. This fan is electric and
can come on whether or not the engine is running. The fan
can start automatically in response to the ECT sensor with
the ignition switch in the “ON” position.
Connect SUZUKI scan tool (2) to DLC (3).
Start engine and keep it running to warm it up.
Now check to ensure that radiator fan is started when the coolant
temperature displayed on SUZUKI scan tool reaches 96C
(205F).
If check result is not satisfactory, check RFC relay, wire harness,
ECT sensor, ECM, coolant temp. meter and sender gauge unit.
Refer to “DTC P0480 FLOW TABLE” of Section 6 and “COOLANT
TEMP. METER AND GAUGE UNIT” of Section 8.

Page 427 of 557

09913-76011
SUZUKI scan tool (Tech 1A) kitMass storage cartridge09931-76030
16 / 14 pin DLC cable
1. Fuel pressure gauge
09912-58441
2. Pressure hose
09912-58431
3. 3-way joint & hose
09912-58490
09917-47010
Vacuum pump gauge 1. Storage case
2. Operator’s manual
3. Tech 1A
4. DLC cable (14 / 26 pin,
09931-76040)
5. Test lead / probe
6. Power source cable
7. DLC cable adaptor
8. Self-test adaptor
6E1-36 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
SPECIAL TOOLS
TIGHTENING TORQUE SPECIFICATIONS
FasteningpartsTightening torqueFastening artsN.mkg-mlb-ft
Throttle body mounting bolt232.317.0
Throttle upper and lower body screw3.50.352.5
Fuel injector wire connector screw2.00.201.5
Fuel injector cover screw3.50.352.5
TP sensor mounting screw2.00.201.5
ECT sensor151.511.0
Heated oxygen sensor -1 and -2454.532.5

Page:   < prev 1-10 ... 121-130 131-140 141-150 151-160 161-170 171-180 181-190 191-200 201-210 ... 230 next >