Iac SUZUKI SWIFT 2000 1.G SF310 Service User Guide
Page 337 of 557
6A1-42 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
Ignition coil assembly
Ground wires from
intake manifold
EVAP canister purge
valve
ECT sensorInjectors, TP sensor and
IAC valve wires at the
coupler
Heated oxygen sensor 1
MAP sensor
5) Remove intake manifold rear stiffener (1) and generator adjust
arm reinforcement (2) from intake manifold.
6) Disconnect the following electric wires:
and then release above wire harnesses from clamps.
7) Disconnect the following hoses:
Brake booster hose (1)
EVAP canister purge hose (3) from purge valve
Radiator inlet hose
Heater inlet hose
IAC valve outlet (2)
8) Disconnect fuel feed (2) and return hoses (3) from fuel delivery
pipe (1).
Page 360 of 557
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-65
12) Disconnect the following electric wires:
Ignition coil assembly
Ground wires from intake manifold
Engine oil pressure switch
EVAP canister purge valve (if equipped)
Engine coolant temp. sensor
Fuel injectors
Power steering pressure switch (if equipped)
Oxygen sensor-1
Back-up light switch (M / T)
Transmission range switch (A / T)
A/T vehicle speed sensor (A / T)
Solenoid coupler (A / T)
Generator
Starter
Battery negative cable from transmission
TP sensor
IAC valve
CMP sensor
MAP sensor
and then release wire harnesses from clamps.
13) Disconnect the following hoses:
Canister purge hose (2) from EVAP canister purge valve
Brake booster hose (1) from intake manifold
Radiator outlet hose from inlet pipe
Heater inlet and outlet hose from heater unit
14) Disconnect fuel feed (2) and return hoses (3) from fuel delivery
pipe (1).
Page 379 of 557
8. Heater inlet hose
9. Heater outlet hose
10. Radiator
11. Oil cooler (A / T only)
12. Engine
13. ECT sensor1. Radiator inlet hose
2. Radiator outlet hose
3. Water intake pipe
4. Thermostat
5. Water pump
6. IAC valve (throttle body)
7. Breather pipe (air cleaner
outlet hose)
6B-2 ENGINE COOLING
GENERAL DESCRIPTION
COOLING SYSTEM CIRCULATION
During engine warm-up (thermostat closed), the water pump discharges coolant into the water jacket chamber
adjacent to No.1 cylinder. Coolant then flows through the cylinder block and the cylinder heat. Coolant then returns
to the water pump through intake manifold, heater inlet hose, heater unit, heater outlet hose, and water intake pipe.
During normal temperatures (thermostat open), coolant takes the same basic route but is now allowed to flow past
the thermostat, the inlet hose and the radiator, and then back to the water pump through the outlet hose and the
water intake pipe.
Page 418 of 557
ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-27
1) Connect scan tool to DLC with ignition switch OFF, if it is avail-
able.
2) Warm up engine to normal operating temperature.
3) Select “Data List” mode on scan tool to check “IAC duty”.
4) Apply load to engine as described below and check that idle
speed is kept at specified level and “IAC duty” increases as spe-
cified below. At the same time, check that plunger of ISC actua-
tor moves.
Increase of ISC duty
when headlight turns ON : About 3.5%
when A / C is operating : About 10%
5) Stop engine and leave it as it is till it cools off. Then check that
plunger of ISC actuator moves when ignition switch is turned
from OFF to ON once.
If abnormality is found in Steps 4) and 5), check ISC relay, ISC
actuator, ISC electric circuit and closed throttle position switch
signal.
If abnormality is found in Step 4) only, check A/C signal circuit
or power steering pressure switch signal circuit first.
ISC ACTUATOR
NOTE:
As ISC actuator has been preadjusted precisely at factory, it must
not be taken out of throttle body or disassembled.
INSPECTION
1) Disconnect connector from ISC actuator.
2) Check whether ISC actuator coil is open or short.
ISC actuator resistance at 20C (68F): 3 – 50 Ω
NOTE:
Above data should be used as reference value for determin-
ing whether coil is open or short only. ISC actuator resis-
tance may be out of above specified range even when ISC
actuator is normal.
Page 429 of 557
6E2
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-1
GENERAL DESCRIPTION6E2- 2 . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2- 6. . . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2- 7. . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2- 8. . . . . .
Engine and Emission Control Input /
Output Table 6E2- 9. . . . . . . . . . . . . . . . . . . . . . . .
DIAGNOSISSee Section 6. . . . . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE6E2-13 . . . . . . . . . . . . . . . .
Accelerator Cable Adjustment 6E2-13. . . . . . . . . .
Idle Speed/Idle Air Control (IAC)
Duty Inspection 6E2-14. . . . . . . . . . . . . . . . . . . . .
AIR INTAKE SYSTEM 6E2-15. . . . . . . . . . . . . . . . . .
Throttle Body 6E2-15. . . . . . . . . . . . . . . . . . . . . . . .
Idle Air Control Valve 6E2-17. . . . . . . . . . . . . . . . .
FUEL DELIVERY SYSTEM 6E2-18. . . . . . . . . . . . . .
Fuel Pressure Inspection 6E2-18. . . . . . . . . . . . . .
Fuel Pump 6E2-21. . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuel Pressure Regulator 6E2-22. . . . . . . . . . . . . . .
Fuel Injector 6E2-23. . . . . . . . . . . . . . . . . . . . . . . . .
ELECTRONIC CONTROL SYSTEM 6E2-27. . . . . .
ECM / PCM 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . . .
MAP Sensor 6E2-27. . . . . . . . . . . . . . . . . . . . . . . . .
TP Sensor 6E2-28. . . . . . . . . . . . . . . . . . . . . . . . . . .
IAT Sensor 6E2-29. . . . . . . . . . . . . . . . . . . . . . . . . .
ECT Sensor 6E2-30. . . . . . . . . . . . . . . . . . . . . . . . . Heated Oxygen Sensor -1 and -2 6E2-31. . . . . . .
Camshaft Position Sensor 6E2-32. . . . . . . . . . . . .
Crankshaft Position Sensor 6E2-32. . . . . . . . . . . .
Vehicle Speed Sensor 6E2-33. . . . . . . . . . . . . . . . .
Fuel Level Sensor (gauge) 6E2-33. . . . . . . . . . . . .
Main Relay, Fuel Pump Relay and
Radiator Fan Control Relay 6E2-33. . . . . . . . . . .
Fuel Cut Operation (Inspection) 6E2-34. . . . . . . .
Radiator Fan Control System 6E2-34. . . . . . . . . .
System Inspection 6E2-34. . . . . . . . . . . . . . . . . .
Radiator Fan 6E2-34. . . . . . . . . . . . . . . . . . . . . . .
EMISSION CONTROL SYSTEM 6E2-35. . . . . . . . .
EGR System 6E2-35. . . . . . . . . . . . . . . . . . . . . . . . .
EVAP Control System 6E2-36. . . . . . . . . . . . . . . . .
EVAP Canister Purge Inspection 6E2-36. . . . . .
Vacuum Passage Inspection 6E2-37. . . . . . . . .
Vacuum Hose Inspection 6E2-37. . . . . . . . . . . .
EVAP Canister Purge Valve
Inspection 6E2-37. . . . . . . . . . . . . . . . . . . . . . . .
EVAP Canister Inspection 6E2-38. . . . . . . . . . .
PCV System 6E2-38. . . . . . . . . . . . . . . . . . . . . . . . .
PCV Hose Inspection 6E2-38. . . . . . . . . . . . . . .
PCV Valve Inspection 6E2-38. . . . . . . . . . . . . . .
SPECIAL TOOLS6E2-39 . . . . . . . . . . . . . . . . . . . . . .
TIGHTENING TORQUE
SPECIFICATIONS6E2-39 . . . . . . . . . . . . . . . . . . . . .
SECTION 6E2
ENGINE AND EMISSION CONTROL SYSTEM
(SFI FOR G13)
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
CONTENTS
Page 430 of 557
6E2-2 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
The engine and emission control system is divided
into 4 major sub-systems: air intake system, fuel de-
livery system, electronic control system and emission
control system.
Air intake system includes air cleaner, throttle body,
IAC valve and intake manifold.Fuel delivery system includes fuel pump, delivery
pipe, fuel pressure regulator, etc. Electronic control
system includes ECM (PCM), various sensors and
controlled devices.
Emission control system includes EGR, EVAP and
PCV system.
GENERAL DESCRIPTION
Page 436 of 557
6E2-8 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
INFORMATION SENSORS
-1. MAP sensor
-2. TP sensor
-3. IAT sensor
-4. ECT sensor
-5. Heated oxygen sensor-1
5-1. Heated oxygen sensor-2
-6. VSS (A / T)
-7. Transmission range switch (A / T)
-8. Battery
-9. CMP sensor
-10. CKP sensor
-11. Fuel level sensor (gauge) (in fuel tank)
-12. PSP switch
-13. A / C control module (if equipped)
-14. VSS (speedometer) (M / T)OTHERS
A: ECM (PCM)
B: Main relay
C: EVAP canister
D: Data link connector CONTROL DEVICES
a: Fuel injector
b: EVAP canister purge valve
c: Fuel pump relay
d: EGR valve (step motor)
e: Malfunction indicator lamp
f: Ignition coil assembly
g: Radiator fan control relay
h: IAC valve
The electronic control system consists of 1) various
sensors which detect the state of engine and driving
conditions, 2) ECM (PCM) which controls various de-
vices according to the signals from the sensors and
3) various controlled devices.
Functionally, it is divided into nine sub systems:
Fuel injection control system
Idle speed control systemFuel pump control system
A / C control system (if equipped)
Radiator fan control system
EGR system
Evaporative emission control system
Oxygen sensor heater control system
Ignition control system
Also, with A / T model, PCM controls A / T.
ELECTRONIC CONTROL SYSTEM
Page 437 of 557
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-9
FUEL PUMP RELAY
FUEL INJECTOR
HO2S HEATER
IAC VALVE
IGNITION COIL WITH IGNITER
EGR VALVE
EVAP CANISTER PURGE VALVE
A/C CONTROL MODULE
RADIATOR FAN RELAY
MIL
MAIN RELAY
SIGNAL FROM SENSOR, SWITCH AND CONTROL MODULE
OUTPUT
INPUT
ENGINE & EMISSION CONTROL INPUT / OUTPUT TABLE
ELECTRIC CONTROL DEVICE
FUEL LEVEL SENSORFor detecting fuel level
BAROMETRIC PRESSURE SENSOR
START SWITCH
IGNITION SWITCH
LIGHTING SWITCH
REAR DEFOGGER SWITCH (IF EQUIPPED)
BLOWER SWITCH
A / C SWITCH
VSS
HEATED OXYGEN SENSOR-1
HEATED OXYGEN SENSOR-2For detecting deterioration of
three way catalytic convertor
IAT SENSOR
ECT SENSOR
TP SENSOR
MAP SENSOR
CMP SENSOR
CKP SENSOR
Page 440 of 557
12 W / R “N”-range signal (A / T)
13 R Heated oxygen sensor-2
14 Y / R “D”-range signal (A / T)
15 R / W “R”-range signal (A / T)
16 Lg / B A / C SW signal
17 R / W EGR valve (stepper motor coil 4)
18 P / G Radiator fan relay
19 Y / Bl Fuel pump relay
20 —— ———
21 W / B “P”-range signal (A / T)
22 P / Bl Fuel level gauge
23 R / B “L”-range signal (A / T)
24 —— ———
1 V Malfunction indicator lamp
Vehicle speed sensor (M / T)
Output shaft speed sensor (+)
(A / T)
3 —— ———
4 G / W Shift solenoid – A (A / T)
5 Gr Throttle position (TP) sensor
6 B / W Ignition switch signal
7 Y / B Data link connector
Output shaft speed sensor (–)
(A / T)
9 —— ———
10 G GND for HO2S-2
11 G / Or Shift solenoid – B (A / T)
12 —— ———
13 —— ———
14 —— ———
15 —— ———
16 Br Tachometer signal
17 B / Y Engine start signal
CON-
NECTORTERMINALWIRE
COLORCIRCUITCON-
NECTORTERMINALWIRE
COLORCIRCUIT
20
Br / Y 19
Br / W
C02 C01C02
C03
Wire color
B : Black
B / Or : Black / Orange
B / W : Black / White
B / Y : Black / Yellow
Bl : Blue
Bl / Or : Blue / Orange
Bl / B : Blue / Black
Bl / R : Blue / Red
Bl / Y : Blue / Yellow
Br : Brown
Br / W : Brown / White
Br / Y : Brown / Yellow
G : Green
G / Or : Green / Orange
G / R : Green / Red
G / W : Green / White
Gr : Gray
Gr / R : Gray / Red
Lg / B : Lightgreen / Black
Lg / R : Lightgreen / RedP : Pink
P / Bl : Pink / Blue
P / G : Pink / Green
V : Violet
V / G : Violet / Green
V / R : Violet / Red
V / W : Violet / White
W : White
W / B : White / Black
W / R : White / Red
R : Red
R / B : Red / Black
R / Bl : Red / Blue
R / G : Red / Green
R / W : Red / White
R / Y : Red / Yellow
Y / B : Yellow / Black
Y / Bl : Yellow / Blue
Y / R : Yellow / Red
2
P
8
Bl
6E2-12 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
1 B Ground for ECM / PCM
2 B / Or Ground for drive circuit
3 B / Or Ground for drive circuit
4 V / R Canister purge valve
5 G / W Power steering pressure switch
6 V / W IAC valve
7 Bl Heater of HO2S-1
8 Bl / Or No.4 fuel injector
9 Bl / R No.1 fuel injector
10 G Ground for sensor circuit
11 B / W CMP sensor
12 —— ———
13 R Heated oxygen sensor-1
14 Lg / R Coolant temp. sensor
15 Gr / R Intake air temp. sensor
16 —— ———
17 Br / Y Electric load (+)
18 —— ———
IG coil assembly for
No.2 and 3 spark plugs
IG coil assembly for
No.1 and 4 spark plugs
21 Bl / B No.2 fuel injector
22 P Power supply for sensor
23 W CKP sensor (+)
24 B CKP sensor (–)
25 —— ———
26 G MAP sensor
27 —— ———
28 V / G Immobilizer indicator lamp
29 —— ———
30 —— ———
31 Bl / Y No.3 fuel injector
1 G / R A / C compressor clutch
2 R / Y EGR valve (stepper motor coil 1)
3 R / G Data link connector
4 Lg / B Heater of HO2S-2
5 R / B Power source
6 R / B Power source
7 W Backup power source
8 R EGR valve (stepper motor coil 3)
9 R / Bl EGR valve (stepper motor coil 2)
10 Gr Ground for main relay
11 Y / B “2”-range signal (A / T)
Page 442 of 557
6E2-14 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
IDLE SPEED / IDLE AIR CONTROL (IAC) DUTY
INSPECTION
Before idle speed / IAC duty check, make sure of the following.
Lead wires and hoses of Electronic Fuel Injection and engine
emission control systems are connected securely.
Accelerator cable has some play, that is, it is not tight.
Valve lash is checked and adjusted according to maintenance
schedule.
Ignition timing is within specification.
All accessories (wipers, heater, lights, A / C, etc.) are out of ser-
vice.
Air cleaner has been properly installed and is in good condition.
No abnormal air inhaling from air intake system.
After above items are all confirmed, check idle speed and IAC duty
as follows.
NOTE:
Before starting engine, place transmission gear shift lever in
“Neutral” (shift selector lever to “P” range for A / T vehicle),
and set parking brake and block drive wheels.
1) Connect SUZUKI scan tool (1) to DLC with ignition switch OFF,
if it is available.
2) Warm up engine to normal operating temperature.
3) Check engine idle speed and “IAC duty” as follow:
Select “Data List” mode on scan tool to check “IAC duty” and en-
gine speed.
Special Tool
(A): 09931-76011 (SUZUKI scan tool)
(B): Mass storage cartridge
(C): 09931-76030 (16 / 14 pin DLC cable)
If duty and/or idle speed is out of specifications, inspect idle air
control system referring to Diagnostic Flow Table B-4 IDLE AIR
CONTROL SYSTEM CHECK in Section 6.
ENGINE IDLE SPEED AND IAC DUTY
A/C OFFA/C ON
M / T vehicle750±50 r / min (rpm)875±50 r/minA / T vehicle
at P/N range750 ±50 r/min (rpm)
8 – 25 or *8 – 35%
875 ±50 r/min
(rpm)
NOTE:
Duty values with (*) are applicable to vehicle used at high
altitude (higher than 2,000 m or 6,560 ft).
4) Check that 875 ± 50 r / min. idle speed is obtained with lighting
switch ON and heater blower switch in 2 – 4 position.
If not, check “Electric load (+)” circuit and “Heater blower switch
signal” circuit referring to “ELECTRONIC CONTROL SYSTEM”
in this section and idle air control system.
5) Check that specified engine idle speed is obtained with A / C ON
if vehicle is equipped with A / C.
If not, check A / C ON signal circuit.