ignition timing SUZUKI SWIFT 2000 1.G SF310 Service User Guide
Page 228 of 557
6-1-72 ENGINE GENERAL INFORMATION AND DIAGNOSIS (SFI FOR G13)
Disconnect connectors when checking plugs
for spark1. Fuel delivery pipe
2. Fuel feed hose
3. FUel pressure
gauge & 3 way joint
STEPACTIONYESNO
6Check PCV valve for clogging (See Section 6E2).
Is it in good condition?Go to Step 7.Replace PCV valve.
7Check EVAP Canister Purge Valve for Closing.
1) Disconnect purge hose (1) from EVAP canister.
2) Place finger against the end of disconnected hose.
3) Check that vacuum is not felt there, when engine is
cool and running at idle. See Fig. 7.
Is vacuum felt?Check EVAP
control system
(See Section 6E2).Go to Step 8.
8Check intake manifold pressure sensor for performance
(See DTC P0105 Diag. Flow Table).
Is it in good condition?Go to Step 9.Repair or replace.
9Check engine coolant temp. sensor for performance
(See Section 6E2).
Is it in good condition?Go to Step 10.Replace engine
coolant temp.
sensor.
10Check parts or system which can cause engine rough
idle or poor performance.
–Engine compression (See Section 6A1).
–Valve lash (See Section 6A1).
–Valve timing (Timing belt installation. See Section 6A1).
Are they in good condition?Check wire harness
and connection of
ECM (PCM) ground,
ignition system and
fuel injector for
intermittent open
and short.Repair or replace.
Fig. 1 for Step 3 Fig. 2 for Step 3 Fig. 3 for Step 4
Fig. 4 for Step 5 Fig. 5 for Step 4 Fig. 6 for Step 5
Fig. 7 for Step 7
Page 265 of 557
6A
ENGINE MECHANICAL (G10, 1-CAM 6-VALVES ENGINE) 6A-1
SECTION 6A
ENGINE MECHANICAL
(G10, 1-CAM 6-VALVES ENGINE)
WARNING:
For vehicles equipped with Supplemental Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either of these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
NOTE:
For the descriptions (items) not found in this section, refer to the same section of Service Manual men-
tioned in FOREWORD of this manual.
CONTENTS
ON-VEHICLE SERVICE6A- 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine Vacuum Check6A- 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Oil Pressure Check6A- 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylinder Head Cover6A- 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Throttle Body and Intake Manifold 6A- 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exhaust Manifold6A- 8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Timing Belt and Belt Tensioner 6A-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Camshaft and Hydraulic Valve Lash Adjuster 6A-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Valve Lash Adjuster Noise Diagnosis 6A-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Valves and Cylinder Head6A-21 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pistons, Piston Rings, Connecting Rods and Cylinders 6A-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
UNIT REPAIR OVERHAUL6A-24 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine Assembly6A-24 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Main Bearings, Crankshaft and Cylinder Block 6A-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SPECIAL TOOLS6A-30 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
REQUIRED SERVICE MATERIALS6A-31 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page 283 of 557
2. No.2 housing
3. No.3 housing
3. Rod
4. Shop cloth
ENGINE MECHANICAL (G10, 1-CAM 6-VALVES ENGINE) 6A-19
As camshaft housing No.1 (1) retains camshaft in proper
position as to thrust direction, make sure to first fit No.1 hous-
ing to No.1 journal of camshaft securely.
After applying engine oil to housing bolts, tighten them tem-
porarily first. Then tighten them by following sequence as
shown in figure.
Tighten a little at a time and evenly among bolts and repeat
tightening sequence three to four times before they are tight-
ened to specified torque.
Special Tool
(A): 09919-16010
Tightening Torque
(a): 11 N
.m (1.1 kg-m, 8.0 lb-ft)
5) Install camshaft oil seal.
After applying engine oil to oil seal lip, press-fit camshaft oil
seal till oil seal surface becomes flush with housing surface.
6) Install camshaft timing belt pulley (1) to camshaft (2) after
installing dwell pin to camshaft.
With locking camshaft as shown in figure, tighten pulley bolt to
specified torque.
Tightening Torque
(b): 60 N
.m (6.0 kg-m, 43.5 lb-ft)
7) Install cylinder head cover to cylinder head as previously out-
lined.
8) Install timing belt, timing belt outside cover, crankshaft pulley,
water pump pulley and water pump belt as previously outlined.
9) Install distributor case and distributor.
Refer to Section 6F for installation.
10) Install air cleaner assembly as previously outlined.
11) Connect negative cable at battery.
12) Adjust ignition timing.
Refer to Section 6F for adjustment.
Page 296 of 557
6A1
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-1
SECTION 6A1
ENGINE MECHANICAL
(G13B, 1-CAM 16-VALVES ENGINE)
WARNING:
For vehicles equipped with Supplement Restraint (Air Bag) System:
Service on and around the air bag system components or wiring must be performed only by an autho-
rized SUZUKI dealer. Refer to “Air Bag System Components and Wiring Location View” under “Gener-
al Description” in air bag system section in order to confirm whether you are performing service on
or near the air bag system components or wiring. Please observe all WARNINGS and “Service Precau-
tions” under “On-Vehicle Service” in air bag system section before performing service on or around
the air bag system components or wiring. Failure to follow WARNINGS could result in unintentional
activation of the system or could render the system inoperative. Either or these two conditions may
result in severe injury.
Technical service work must be started at least 90 seconds after the ignition switch is turned to the
“LOCK” position and the negative cable is disconnected from the battery. Otherwise, the system may
be activated by reserve energy in the Sensing and Diagnostic Module (SDM).
CONTENTS
GENERAL DESCRIPTION6A1- 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine6A1- 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine Lubrication6A1- 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylinder Block6A1- 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crankshaft and Main Bearings 6A1- 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pistons, Rings, Piston Pins and Connecting Rods 6A1- 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylinder Head and Value Train 6A1- 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ON VEHICLE SERVICE6A1- 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compression Check6A1- 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine Vacuum Check6A1- 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Oil Pressure Check6A1- 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Valve Lash (Clearance)6A1- 9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Air Cleaner Element6A1-11 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Air Cleaner Outlet Hose6A1-12 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylinder Head Cover6A1-13 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Throttle Body and Intake Manifold 6A1-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exhaust Manifold6A1-17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Timing Belt and Belt Tensioner 6A1-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Oil Pan and Oil Pump Strainer 6A1-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Oil Pump6A1-28 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rocker Arms, Rocker Arm Shaft and Camshaft 6A1-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Valves and Cylinder Head6A1-41 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Piston, Piston Rings, Connecting Rods and Cylinders 6A1-54. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
UNIT REPAIR OVERHAUL6A1-64 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engine Assembly6A1-64 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Main Bearings, Crankshaft and Cylinder Block 6A1-68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SPECIAL TOOLS6A1-80 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
REQUIRED SERVICE MATERIALS6A1-81 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TIGHTENING TORQUE SPECIFICATIONS6A1-82 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
NOTE:
For what each abbreviation stands for (i.e., full term), refer to SECTION 0A.
Page 335 of 557
6A1-40 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
1. O-ring2
10) Using special tool, tighten pulley bolt to specified torque.
Tightening Torque
(a): 60 N
.m (6.0 kg-m, 43.5 lb-ft)
Special Tool
(A): 09917-68221
11) Install belt tensioner, timing belt, outside cover, crankshaft
pulley and water pump belt as previously outlined.
12) After applying sealant to part “A” as shown in figure, install
CMP sensor case (2) (Distributorless ignition coil case) to cyl-
inder head and tighten its fixing bolts to specified torque.
“A” Sealant: 99000-31110
Tightening Torque
(a): 11 N
.m (1.1 kg-m, 8.0 lb-ft)
13) Adjust valve clearance as previously outlined.
14) Install cylinder head cover and air cleaner outlet hose.
15) Check to ensure that the following parts are back in place:
Ignition coil assemblies
High tension cords
CMP sensor coupler
Couplers to ignition coil assembly
Other removed parts which have not been reinstalled
16) Connect negative cable at battery.
17) Confirm that ignition timing is within specification referring to
Section 6F.
Page 338 of 557
3
2. Breather hose
3. PCV valve4. High-tension cords
5. Ignition coil assembly
6. Ignition coil coupler
A: Camshaft pulley side
B: CMP sensor case side
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-43
9) Remove cylinder head cover (1) as previously outlined.
Loosen all valve lash adjusting screws fully.
10) Remove timing belt and camshaft as previously outlined.
11) Disconnect exhaust pipe from exhaust manifold and remove
exhaust manifold stiffener (if equipped).
12) Loosen cylinder head bolts in such order as indicated in figure
and remove them.
13) Check all around cylinder head for any other parts required to
be removed or disconnected and remove or disconnect what-
ever necessary.
14) Remove cylinder head with intake manifold, exhaust manifold
CMP sensor case, using lifting device if necessary.
Page 348 of 557
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-53
4) Reverse removal procedure for installation.
5) Adjust water pump drive belt tension by referring to “ENGINE
COOLING” section.
6) Adjust power steering pump belt tension or A / C compressor
belt tension, if equipped.
Refer to Section 0B.
7) Adjust intake and exhaust valve lashes as previously outlined.
8) Adjust accelerator cable play.
Refer to Section 6E.
9) Check to ensure that all removed parts are back in place.
Reinstall any necessary parts which have not been reinstalled.
10) Refill cooling system referring to Section 6B.
11) Connect negative cable at battery.
12) Confirm that ignition timing is within specification.
13) Verify that there is no fuel leakage, coolant leakage and ex-
haust gas leakage at each connection.
Page 358 of 557
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-63
6) Reverse removal procedure for installation, as previously out-
lined.
7) Adjust water pump drive belt tension referring to Section 6B.
8) Adjust power steering pump belt tension or A / C compressor
belt tension, if equipped.
Refer to Section 0B.
9) Adjust accelerator cable play.
Refer to Section 6E.
10) Check to ensure that all removed parts are back in place. Rein-
stall any necessary parts which have not been reinstalled.
11) Refill engine with engine oil by referring to item “ENGINE OIL
CHANGE” in Section 0B.
12) Refill cooling system referring to Section 6B.
13) Connect negative cable at battery.
14) Check ignition timing referring to Section 6F.
15) Verify that there is no fuel leakage, coolant leakage, oil leakage
and exhaust gas leakage at each connection.
Page 381 of 557
6B-4 ENGINE COOLING
COOLANT (WATER) TEMP. GAUGE
The coolant temp. gauge is included in engine coolant temp. (ECT)
sensor (1). This gauge activates a temp. meter in the instrument
cluster.
DIAGNOSIS
ConditionPossible CauseCorrection
Engine overheatsLoose or broken water pump belt
Not enough coolant
Faulty thermostat
Faulty water pump
Dirty or bent radiator fins
Coolant leakage on cooling system
Defective cooling fan motor
Plugged radiator
Faulty radiator cap
Maladjusted ignition timing
Dragging brakes
Slipping clutchAdjust or replace.
Check coolant level and add as
necessary.
Replace.
Replace.
Clean or remedy.
Repair.
Check and replace as
necessary.
Check and replace radiator as
necessary.
Replace.
Adjust.
Adjust brake.
Adjust or replace.
Page 399 of 557
6E1-8 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
ON-VEHICLE SERVICE
GENERAL
When the hoses have been disconnected and system’s component
removed for service, be sure to reinstall component properly, and
route and connect hoses correctly after service. Refer to Emission
Control Information Label for proper connection of hoses (if
equipped).
ACCELERATOR CABLE ADJUSTMENT
1) Confirm that ambient temperature is higher than 0C, 32F.
2) Warm up engine to normal operating temperature with all elec-
tric loads OFF and stop engine.
3) Confirm that clearance “c” between throttle lever (1) and stop
screw (2) is less than about 1 mm (0.04 in.).
4) Check accelerator cable for play.
Accelerator cable play “a”: 10 – 15 mm (0.4 – 0.6 in.)
Cable play should be within specification. If out of specification,
loosen accelerator cable lock nut and adjust by turning adjusting
nut (3). Be sure to tighten lock nut (4) securely after adjustment.
5) With accelerator pedal depressed fully, check clearance be-
tween throttle lever and lever stopper (5) (throttle body) which
should be within following specification.
Clearance “b”: 0.5 – 2.0 mm (0.02 – 0.07 in.)
(With pedal depressed fully)
If measured value is out of specification, adjust it to specification
by changing height of pedal stopper bolt (6).
IDLE SPEED INSPECTION
Before inspecting idle speed, make sure to the following.
Lead wires and hoses of Electronic Fuel Injection and engine
emission control systems are connected securely.
After warming up engine, accelerator cable has some play, that
is, it is not tight.
Ignition timing is within specification.
All of electrical loads except ignition are switched off.
Air cleaner has been properly installed and is in good condition.
Malfunction indicator lamp does not light when engine running.
After above items are all confirmed, check idle speed as follows.