1. Thickness gauge IN
EX
360
IN
EX
6A1-10 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
6) If valve lash is out of specification, adjust it to specification by
turning adjusting screw after loosening lock nut.
After adjustment, tighten lock nut to specified torque while hold-
ing adjusting screw stationary, and then make sure again that
valve lash is within specification.
Valve
clearance
When cold
(Coolant tempera-
ture is 15 – 25C
or 59 – 77F)When hot
(Coolant tempera-
ture is 60 – 68C
or 140 – 154F)
specifica-
tionIntake0.13 – 0.17 mm
(0.005 – 0.007 in.)0.18 – 0.22 mm
(0.007 – 0.009 in.)
Exhaust0.23 – 0.27 mm
(0.009 – 0.011 in.)0.28 – 0.32 mm
(0.011 – 0.013 in.)
Special Tool
(A): 09917-18211
Tightening Torque
(a): 12 N
.m (1.2 kg-m, 9.0 lb-ft)
7) After checking and adjusting valve lashes at valves (1), (2), (5)
and (7), (or (3), (4), (6) and (8)) rotate crankshaft exactly one full
turn (360) and check the same at valves (3), (4), (6) and (8) (or
(1), (2), (5) and (7)). Adjust them as necessary.
8) After checking and adjusting all valves, reverse removal proce-
dure for installation.

Page 306 of 557

3
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-11
AIR CLEANER ELEMENT
REMOVAL
1) Disconnect air cleaner outlet hose from case after loosening its
clamp (2) and removing bolt (1) shown in figure.
2) Remove air cleaner cap (3) from case by unhooking its clamps,
then take out air cleaner element.
INSPECTION
Check air cleaner element for dirt. Replace excessively dirty ele-
ment.
CLEAN
Blow off dust by compressed air from air outlet side of element.
INSTALLATION
Reverse removal procedure for installation.

Page 308 of 557

3
3
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-13
CYLINDER HEAD COVER
REMOVAL
1) Disconnect negative cable at battery.
2) Disconnect breather hose (2) and PCV valve (3) from head cov-
er.
3) Disconnect ignition coil couplers (6).
4) Remove ignition coil assemblies (5) with high-tension cord (4).
5) Remove cylinder head cover (1) with cylinder head cover gasket
and O-rings.
INSTALLATION
1) Install O-rings (3) and cylinder head cover gasket (2) to cylinder
head cover (1).
NOTE:
Be sure to check each of these parts for deterioration or any
damage before installation and replace if found defective.
2) Install cylinder head cover to cylinder head and tighten cover
bolts to specified torque.
Tightening Torque
(a): 11 N
.m (1.1 kg-m, 8.0 lb-ft)
NOTE:
When installing cylinder head cover, use care so that cylin-
der head cover gasket or O-rings will not get out of place or
fall off.
3) Install ignition coil assemblies (5) with high-tension cord (4).
4) Connect ignition coil couplers (6).
5) Connect breather hose (2) and PCV valve (3) to head cover (1).
6) Connect negative cable at battery.

Page 311 of 557

1. Long bolt
2. Short bolt
6A1-16 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
10) Remove intake manifold rear stiffener (1) and generator adjust
arm reinforcement (2) from intake manifold (3).
11) Remove intake manifold with throttle body from cylinder head,
and then its gasket.
INSTALLATION
Reverse removal procedure for installation noting the followings.
Use new intake manifold gasket.
When installing intake manifold, install clamps securely.
Tightening Torque
(a): 23 N
.m (2.3 kg-m, 17.0 lb-ft)
Adjust accelerator cable play, referring to Section 6E.
Check to ensure that all removed parts are back in place.
Reinstall any necessary parts which have not been reinstalled.
Refill cooling system referring to Section 6B.
Upon completion of installation, turn ignition switch ON but en-
gine OFF and check for fuel leaks.
Finally, start engine and check for engine coolant leaks.

Page 313 of 557

(b)
(a)
6A1-18 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
INSTALLATION
1) Install new gaskets to cylinder head.
2) Install exhaust manifold.
Tighten bolts and nuts to specified torque.
Tightening Torque
(a): 32 N
.m (3.2 kg-m, 23.5 lb-ft)
3) Install exhaust manifold cover(s) (1).
4) Connect oxygen sensor coupler (3) and clamp (2) its wire se-
curely.
5) Tighten exhaust No.1 pipe to manifold nuts and exhaust man-
ifold stiffener bolt.
Tightening Torque
(a): 50 N
.m (5.0 kg-m, 36.5 lb-ft)
(b): 50 N
.m (5.0 kg-m, 36.5 lb-ft)
6) Connect negative cable at battery.
7) Check exhaust system for exhaust gas leakage.

Page 317 of 557

4. Damper
6A1-22 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
2) Install tensioner (2) and tensioner plate (3):
Do not tighten tensioner bolt (1) with wrench yet. Hand tighten
only at this time.
Check to ensure that plate movement in arrow direction as
shown in figure causes tensioner to move in the same direction.
If no associated movement between plate and tensioner occurs,
remove tensioner and plate again and reinsert plate lug into ten-
sioner hole.
3) Check that timing mark (2) on camshaft timing belt pulley is
aligned with “V” mark (1) on cylinder head cover. If not, align two
marks by turning camshaft but be careful not to turn it more than
its allowable turning range which is described on previous page.
4) Check that timing mark (2) on crankshaft timing belt pulley is
aligned with arrow mark (1) on oil pump case. If not, align two
marks by turning crankshaft but be careful not to turn it more
than its allowable turning range which is described on previous
page.
5) Install timing belt and tensioner spring (2).
With two sets of marks aligned and tensioner plate pushed up,
install timing belt on two pulleys in such a way that drive side (1)
of belt is free from any slack.
And then install tensioner spring as shown in figure, and hand-
tighten tensioner stud (3).
NOTE:
When installing timing belt, match arrow mark (
) on
timing belt with rotating direction of crankshaft.
In this state, No. 4 piston is at top dead center of compres-
sion stroke.

Page 324 of 557

4. Guide seal
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-29
7) Remove oil pump assembly (1) after removing bolts (2).
DISASSEMBLY
1) Remove oil level gauge guide bolt (3) and pull out guide (2) from
oil pump (1).
2) Remove rotor plate (1).
3) Remove outer rotor (1) and inner rotor (2).
INSPECTION
Check oil seal lip for fault or other damage. Replace as necessary.

Page 325 of 557

6A1-30 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
NOTE:
When installing oil seal (1), press-fit it till its end face is flush
with oil pump case (2) end face.
Check outer and inner rotors, rotor plate, and oil pump case for
excessive wear or damage.
MEASUREMENT
Radial clearance
Check radial clearance between outer rotor (1) and case, using
thickness gauge.
If clearance exceeds its limit, replace outer rotor or case.
Limit on radial clearance between outer rotor and case:
0.200 mm (0.079 in.)
Side clearance
Using straight edge and thickness gauge, measure side clear-
ance.
Limit on side clearance: 0.10 mm (0.0039 in.)
ASSEMBLY
1) Wash, clean and then dry all disassembled parts.
2) Apply thin coat of engine oil to inner (2) and outer rotors (1), oil
seal lip portion, and inside surfaces of oil pump case and plate.
3) Install outer and inner rotors to pump case.

Page 326 of 557

(a)
1. Oil pump
1. No. 1 bolts (short)
2. No. 2 bolts (long)
ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE) 6A1-31
4) Install rotor plate. Tighten 5 screw securely.
After installing plate, check to be sure that gears turn smoothly
by hand.
Tightening Torque
(a): 11 N
.m (1.1 kg-m, 8.0 lb-ft)
5) Apply engine oil to guide seal (3) and install guide seal and guide
(2).
INSTALLATION
1) Install two oil pump pins and oil pump gasket to cylinder block.
Use a new gasket.
2) To prevent oil seal lip from being damaged or upturned when
installing oil pump to crankshaft, fit special tool (Oil seal guide)
to crankshaft, and apply engine oil to special tool.
Special Tool
(A): 09926-18210
3) Install oil pump to cylinder block.
As there are 2 types of oil pump bolts, refer to figure for their cor-
rect use and tighten them to specified torque.
Tightening Torque
(a): 11 N
.m (1.1 kg-m, 8.0 lb-ft)
4) Install rubber seal between oil pump and water pump.

Page 327 of 557

6A1-32 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
5) Install timing pulley key (2) and crank timing belt pulley (3) and
crankshaft pulley pin (1). Refer to figure for proper installation
of these parts.
With crankshaft locked using flat end rod or the like (5), tighten
crank timing belt pulley bolt (4) to specified torque.
Tightening Torque
(a): 130 N
.m (13.0 kg-m, 94.0 lb-ft)
6) Install timing belt, tensioner, oil pump strainer, oil pan and other
parts as previously outlined.
7) Check to ensure that all removed parts are back in place. Rein-
stall any necessary parts which have not been reinstalled.
8) Adjust water pump drive belt tension referring to Section 6B.
9) Adjust power steering pump belt tension or A / C compressor
belt tension, if equipped.
Refer to Section 0B.
10) Refill engine with engine oil referring to “ENGINE OIL
CHANGE” in Section 0B.
11) Connect negative cable at battery.
12) After completing installation, check oil pressure by running en-
gine.