tension SUZUKI SWIFT 2000 1.G SF310 Service Repair Manual

Page 377 of 557

6A1-82 ENGINE MECHANICAL (G13B, 1-CAM 16-VALVES ENGINE)
TIGHTENING TORQUE SPECIFICATIONS
FASTENING PARTSTIGHTENING TORQUEFASTENING PA R T SN.mkg-mlb-ft
Oil pressure switch131.39.5
Valve adjusting screw lock nuts121.29.0
Cylinder head cover bolts111.18.0
Intake manifold bolts and nuts232.317.0
Timing belt tensioner stud111.18.0
Timing belt tensioner bolt252.518.0
Timing belt cover bolts and nut111.18.0
Exhaust manifold bolts and nuts323.223.5
Crankshaft pulley bolt161.611.5
Crankshaft timing belt pulley bolt13013.094.0
Exhaust pipe nuts and bolts505036 5Exhaust manifold stiffener nut505.036.5
Oil pump strainer bolt and stay bolt111180Oil pan bolts and nuts111.18.0
CKP sensor bolt101.07.5
Oil pan drain plug505.036.0
Oil pump rotor plate screws111180Oil pump case bolts111.18.0
Camshaft housing bolts111180Rocker arm shaft bolts111.18.0
Camshaft timing belt pulley bolt606.043.5
Cylinder head venturi plug3.50.352.5
Cylinder head bolts686.849.0
Connecting rod bearing cap nuts353.525.5
Crankshaft main bearing cap bolts545.439.0
Flywheel bolts787.856.5
Drive plate bolts959.569.0
Engine mounting & bracket bolts and nutsRefer to INSTALLATION of
ENGINE ASSEMBLY in this section.

Page 386 of 557

ENGINE COOLING 6B-9
WATER PUMP
1) Disconnect negative cable at battery.
2) Drain cooling system.
3) Remove timing belt and tensioner according to procedure de-
scribed in “TIMING BELT AND TENSIONER” of Section 6A or
6A1.
4) Remove water pump belt adjusting arm.
5) Remove water pump assembly (1).
INSPECTION
NOTE:
Do not disassemble water pump.
If any repair is required on pump, replace it as assembly.
Rotate water pump by hand to check for smooth operation.
If pump does not rotate smoothly or makes abnormal noise, replace
it.
INSTALLATION
1) Install new pump gasket to cylinder block.
2) Install water pump to cylinder block.
Tightening Torque
(a): 12 N
.m (1.2 kg-m, 9.0 lb-ft)
3) After installing water pump, install rubber seal (1) between water
pump and oil pump, and another between water pump and cylin-
der head.
4) Install timing belt tensioner, timing belt and timing belt outside
covers according to procedure described in “TIMING BELT AND
TENSIONER” of Section 6A or 6A1.
NOTE:
Special care must be used when installing belt tensioner
and timing belt.
Torque each bolt and nut to specification.
Before installing outside covers, check to make sure that
cover seal is fitted in groove of each cover properly.

Page 387 of 557

6B-10 ENGINE COOLING
5) Install crankshaft pulley, water pump pulley, and pump drive
belt referring to Section 6A or 6A1.
6) Adjust water pump belt tension.
7) Install fender apron extension on right side.
8) Install air cleaner assembly.
9) Connect negative cable at battery.
10) Fill cooling system.
11) After installation, check each part for leakage.

Page 416 of 557

ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10) 6E1-25
1. Main relay
2. Relay box
CRANKSHAFT POSITION SENSOR
INSPECTION
Check crankshaft position sensor referring to step 1 and 2 of DTC
P0335 Flow Chart. If malfunction is found, replace.
REMOVAL
1) Hoist vehicle.
2) Remove fender apron extension on right side.
3) Disconnect connector from crankshaft position sensor.
4) Remove crankshaft position sensor from oil pan.
INSTALLATION
1) Check to make sure that crankshaft position sensor and pulley
tooth is free from any metal particles and damage.
2) Install crankshaft position sensor to oil pan.
3) Connect connector to it securely.
4) Install fender apron extension.
MAIN RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove main relay from relay box.
3) Check resistance between each two terminals as in table below.
If check results are as specified, proceed to next operation
check. If not, replace.
TERMINALS
RESISTANCE
Between A and B∞ (infinity)
Between C and D100 – 120 Ω
4) Check that there is continuity between terminals “A” and “B”
when battery is connected to terminals “C” and “D”.
If found defective, replace.

Page 468 of 557

6F
IGNITION SYSTEM 6F-1
GENERAL DESCRIPTION6F- 1 . . . . . . . . . . . . . .
DIAGNOSIS6F- 3 . . . . . . . . . . . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE6F- 5 . . . . . . . . . . . . . . . .
Ignition Spark Test 6F- 5. . . . . . . . . . . . . . . . . . . .
High-Tension Cords 6F- 5. . . . . . . . . . . . . . . . . . .
Spark Plugs 6F- 6. . . . . . . . . . . . . . . . . . . . . . . . .
Noise Suppressor 6F- 6. . . . . . . . . . . . . . . . . . . . Ignition Coil 6F- 7. . . . . . . . . . . . . . . . . . . . . . . . . .
Igniter 6F- 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Distributor 6F- 8. . . . . . . . . . . . . . . . . . . . . . . . . . .
Ignition Timing 6F- 9. . . . . . . . . . . . . . . . . . . . . . .
Distributor Unit 6F-10. . . . . . . . . . . . . . . . . . . . . . .
SPECIAL TOOLS6F-11 . . . . . . . . . . . . . . . . . . . . . .
The ignition system used for this vehicle has an elec-
tronic ignition control system and consists of the fol-
lowing parts.
ECM
It detects the engine condition through the signals
from the sensors, determines the most suitable igni-
tion timing and time for electricity to flow to the pri-
mary coil and sends a signal to the power unit.
Power unit (Igniter)
It turns ON and OFF the primary current of the igni-
tion coil according to the signal from ECM.
Ignition coil
When the ignition coil primary current is turned OFF,
a high voltage is induced in the secondary winding.
Distributor
It distributes a high voltage current to each plug.High-tension cords and spark plugs.
CMP sensor (Camshaft position Sensor)
Located in the distributor, it converts the crank angle
into voltage variation and sends it to ECM. For its
details, refer to Section 6E1.
TP sensor, ECT sensor and MAP sensor
For their details, refer to Section 6E.
In electronic ignition control system, the ECM is pro-
grammed for the best ignition timing under every en-
gine condition. Receiving signals which indicate the
engine condition from the sensors, e.g., engine revo-
lution, intake air pressure, coolant temperature, etc.,
it selects the most suitable ignition timing from its
memory and operates the power unit.
Thus ignition timing is controlled to yield the best en-
gine performance.
For more information, refer to Section 6E1.
SECTION 6F
IGNITION SYSTEM
WARNING:
For vehicles equipped with a Supplemental Inflatable Restraint Air Bag System:
Service on or around Air Bag System Components or Wiring must be performed only by an authorized
Suzuki dealer. Please observe all WARNINGS and SERVICE PRECAUTIONS in Section 9J under “On-
Vehicle Service” and the Air Bag System Component and Wiring Location view in Section 9J before
performing service on or around Air Bag System Components or Wiring. Failure to follow WARNINGS
could result in unintended air bag deployment or could render the air bag inoperative. Either of these
two conditions may result in severe injury.
SDM can maintain sufficient voltage to cause a deployment of air bags for up to 10 seconds after igni-
tion switch is turned to “LOCK” position, battery is disconnected or fuse powering SDM is removed.
Work must be started after 15 seconds from the time.
CONTENTS
GENERAL DESCRIPTION

Page 470 of 557

IGNITION SYSTEM 6F-3
DIAGNOSIS
ConditionPossible CauseCorrection
Engine cranks, but will
not start or hard to startBlown fuse for ignition coil
Loose connection or disconnection of lead wire or
high-tension cord(s)
Faulty high-tension cord(s)
Faulty spark plug(s)
Cracked rotor or cap
Maladjusted signal rotor air gap
Faulty ignition coil
Faulty noise suppressor
Faulty CMP sensor
Faulty igniter
Faulty ECM (or PCM)
Maladjusted ignition timingReplace
Connect securely
Replace
Adjust, clean or replace
Replace
Adjust
Replace
Replace
Replace
Replace
Replace
Adjust
Poor fuel economy or
engine performanceIncorrect ignition timing
Faulty spark plug(s) or high-tension cord(s)
Faulty ECM (or PCM)Adjust
Adjust, clean or replace
Replace
DIAGNOSTIC FLOW TABLE
STEPACTIONYESNO
1Was “Engine Diagnostic Flow Table” in SECTION 6
performed?Go to Step 2.Go to “Engine
Diagnostic Flow
Table” in SECTION 6.
2Ignition Spark Test
1) Check all spark plug for condition and type,
referring to “Spark Plugs” in this section.
2) If OK, perform ignition spark test, referring to
“Ignition Spark Check” in this section.
Is spark emitted from all spark plugs?Go to Step 11 on the
next page.Go to Step 3.
3Diagnostic Trouble Code (DTC) Check
1) Check DTC stored in ECM (or PCM), referring to
“Diagnostic Trouble Code (DTC) Check” in
SECTION 6.
Is DTC stored?Go to applicable flow
table corresponding to
that code No. in
SECTION 6.Go to Step 4.
4Electrical Connection and Noise Suppressor Check
1) Check ignition coil for electrical connection and
noise suppressor for conductivity.
Are they good condition?Go to Step 5.Repair or replace.
5High-tension Cord Check
1) Check high-tension cord for resistance, referring
to “High-tension Cords” in this section.
Is check result satisfactory?Go to Step 6.Replace high-tension
cord(s).

Page 472 of 557

1. Injector coupler
2. Throttle body
3. Air cleaner case
4. Cylinder head cover
1. High-tension code 2. Cap
1. High-tension
cord
2. Ohmmeter
IGNITION SYSTEM 6F-5
ON-VEHICLE SERVICE
IGNITION SPARK TEST
1) Disconnect injector coupler at throttle body side.
WARNING:
Without disconnection of injector coupler, combustible gas
may come out from spark plug holes during this test and
may get ignited in engine room.
2) Remove spark plugs and connect them to high-tension cords,
and then ground spark plugs.
3) Crank engine and check if each spark plug sparks.
4) If no spark is emitted, inspect high-tension cords, spark plugs,
ignition coil, distributor, etc.
HIGH-TENSION CORDS
1) Remove high-tension cord at ignition coil while gripping its cap.
2) Remove distributor cap installed with high-tension cords.
3) Remove high-tension cord clamp from cylinder head cover.
4) Pull out high-tension cords from spark plugs while gripping each
cap.
CAUTION:
Removal of high-tension cords together with clamps
will be recommended so as not to damage their inside
wire (resistive conductor).
For the same reason, pull out each connection by grip-
ping cap portion.
5) Measure resistance of high-tension cord by using ohmmeter.
High-tension cord resistance: 10 – 22 kΩ/ m (3.0 – 6.7 kΩ/ft)

Page 473 of 557

6F-6 IGNITION SYSTEM
6) If resistance exceeds specification, inspect distributor terminal
and replace high-tension cord(s) and/or distributor cap as re-
quired.
CAUTION:
Never attempt to use metal conductor high-tension cords
as replacing parts.
Insert each cap portion fully when installing high-tension
cords.
SPARK PLUGS
1) Pull out high-tension cords by gripping their caps and then re-
move spark plugs.
2) Inspect them for:
Electrode wear
Carbon deposits
Insulator damage
3) If any abnormality is found, adjust air gap, clean with spark plug
cleaner or replace them with specified new plugs.
Spark plug air gap “a’’: 1.0 – 1.1 mm (0.039 – 0.043 in.)
Spark plug type : NGK BPR6ES-11
: DENSO W20EPR-U11
4) Install spark plugs and torque them to specification.
Tightening Torque for spark plug
25 N
.m (2.5 kg-m, 18.0 lb-ft)
5) Install high-tension cords securely by gripping their caps.
NOISE SUPPRESSOR
REMOVAL
1) Unwrap tape from noise suppressor.
2) Disconnect coupler of noise suppressor.
3) Remove noise suppressor.
INSTALLATION
Reverse removal procedure for installation.
INSPECTION
Using an ohmmeter (1) to check continuity as the following.
“a” – “b”: No continuity
“a” – “c”: No continuity
“c” – “d”: Continuity (Approx. 2.2 kΩ)
If check result is not satisfactory, replace noise suppressor (2).

Page 474 of 557

PRIMARY
SECONDARY
1. Ohmmeter
IGNITION SYSTEM 6F-7
IGNITION COIL
1) Pull out high-tension cord by gripping its cap.
2) Disconnect ignition coil coupler.
3) Measure primary and secondary coil resistances.
Ignition coil resistance (at 20C, 68F)
Primary : 0.87 – 1.05 Ω
Secondary : 11.2 – 15.2 kΩ
4) If resistance is out of specification, replace coil with new one.
IGNITER
Before this inspection, prepare 5 V power supply (3 new 1.5 V bat-
teries), one 12 V 3.4 W light bulb and one 12 V battery (fully
charged).
1) Disconnect igniter coupler (1).
2) Remove igniter (2) from its bracket.
3) Arrange 3 new batteries in series (1) (check total voltage is about
4.7 V).
4) Connect light bulb (2) between “c” terminal of igniter (3) and bat-
tery (4) positive (+) terminal, then connect battery negative (–)
terminal to igniter body.
Also connect battery positive (+) terminal and “b” terminal of ig-
niter.
Check that the light bulb does not illuminate.
5) Connect negative (–) terminal of batteries (1) and igniter body.
Check that the light bulb illuminate when positive (+) terminal of
batteries (1) is connected to “a” terminal of igniter.
If inspection result is not satisfactory, replace igniter.
6) Install igniter and connect igniter coupler.

Page 476 of 557

1. Crankshaft pulley
2. Water pump pulley
A: To be advanced
B: To be retarded
1. Distributor flange bolt
2. Distributor
IGNITION SYSTEM 6F-9
IGNITION TIMING
NOTE:
Before starting engine, place transmission gear shift lever in
“Neutral” (shift selector lever to “P” range for A/T model), and
set parking brake.
INSPECTION AND ADJUSTMENT
1) Connect SUZUKI scan tool (1) to DLC (2) with ignition switch
OFF.
2) Start engine and warm it up to normal operating temperature.
3) Make sure that all of electrical loads except ignition are
switched off.
4) Check to be sure that idle speed is within specification.
(Refer to SECTION 6E1)
5) Set timing light to No.1 high-tension cord.
6) Fix ignition timing to initial one as follows:
Select “MISC” made on SUZUKI scan tool and fix ignition tim-
ing to initial one.
7) Using timing light, check that timing is within specification.
Initial ignition timing (Ignition timing fixed):
5 ±3 BTDC (at idle speed)
Ignition order: 1-3-2
Special Tool
(A): 09900-27301 or 09930-76420
8) If ignition timing is out of specification, loosen flange bolts, ad-
just timing by turning distributor assembly while engine is run-
ning, and then tighten bolts.
Tightening Torque
(a): 15 N
.m (1.5 kg-m, 11.0 lb-ft)
9) After tightening distributor flange bolts, recheck that ignition
timing is within specification.
10) After checking and/or adjusting Initial Ignition Timing, release
ignition timing fixation by SUZUKI scan tool.
11) With engine idling (ignition timing not fixed, idle switch ON and
car stopped), check that ignition timing is about 10 BTDC.
(Constant variation within a few degrees from 10 indicates no
abnormality but proves operation of electronic timing control
system.) Also, check that increasing engine speed advances
ignition timing.
If above check results are not satisfactory, check CTP switch,
test switch terminal circuit and ECM.

Page:   < prev 1-10 ... 11-20 21-30 31-40 41-50 51-60 61-70 next >