TOYOTA LAND CRUISER 1996 J80 Workshop Manual
Page 771 of 1399
EC07H−06
−
EMISSION CONTROL EMISSION CONTROL SYSTEM
EC−1
614
Author: Date:
1996 LAND CRUISER (RM451U)
EMISSION CONTROL SYSTEM
PURPOSE
The emission control systems are installed to reduce the amount of HC, CO a\
nd NOx exhausted from the
engine ((3), (4) and (5)), to prevent the atmospheric release of blow −by gas− containing HC (1) and evapo-
rated fuel containing HC being released from the fuel tank (2).
The function of each system is shown in the following table.
SystemAbbreviationFunction
(1) Positive Crankcase V entilation
(2) Evaporative Emission Control
(3) Exhaust Gas Recirculation
(4) Three− Way Catalytic Converter
(5) Sequential Multiport Fuel Injection*PCV
EVAP EGR
TWC SFIReduces HC
Reduces evaporated HC
Reduces NOx
Reduces HC, CO and NOx
Injects a precisely timed, optimum amount of fuel for reduced
exhaust emissions
Remark: * For inspection and repair of the SFI system, refer to the SF section \
in this manual.
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 772 of 1399
EC07I−06
EC−2
−
EMISSION CONTROL PARTS LAYOUT AND SCHEMATIC DRAWING
615
Author: Date:
1996 LAND CRUISER (RM451U)
PARTS LAYOUT AND SCHEMATIC DRAWING
LOCATION
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 773 of 1399
EC07J−05
−
EMISSION CONTROL PARTS LAYOUT AND SCHEMATIC DRAWING
EC−3
1996 LAND CRUISER (RM451U)
DRAWING
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 774 of 1399
EC0G9−01
EC−4−
EMISSION CONTROL POSITIVE CRANKCASE VENTILATION (PCV)
SYSTEM
617
Author: Date:
1996 LAND CRUISER (RM451U)
POSITIVE CRANKCASE
VENTILATION (PCV) SYSTEM
INSPECTION
1. REMOVE PCV VALVE
(a) Disconnect the PCV hose from the PCV valve.
(b) Remove the PCV valve.
2. INSTALL CLEAN HOSE TO PCV VALVE
3. INSPECT PCV VALVE OPERATION
(a) Blow air into the cylinder head side, and check that air
passes through easily.
CAUTION:
Do not suck air through the valve.
Petroleum substances inside the valve are harmful.
(b) Blow air into the air intake chamber side, and check that air passes through with difficulty.
If operation is not as specified, replace the PCV valve.
4. REMOVE CLEAN HOSE FROM PCV VALVE
5. REINSTALL PCV VALVE
6. VISUALLY INSPECT HOSE, CONNECTIONS AND GASKETS
Check for cracks, leaks or damage.
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 775 of 1399
EC0GA−01
−
EMISSION CONTROL EVAPORATIVE EMISSION (EVAP) CONTROL SYSTEM
EC−5
618
Author: Date:
1996 LAND CRUISER (RM451U)
EVAPORATIVE EMISSION (EVAP) CONTROL SYSTEM
COMPONENTS
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 776 of 1399
EC0GB−01
EC3069
Gasket
Check Valve (V acuum Valve)
EC−6
−
EMISSION CONTROL EVAPORATIVE EMISSION (EVAP) CONTROL SYSTEM
1996 LAND CRUISER (RM451U)
INSPECTION
1. VISUALLY INSPECT LINES AND CONNECTIONS
Look for loose connections, sharp bends or damage.
2. VISUALLY INSPECT FUEL TANK
Look for deformation, cracks or fuel leakage.
3. VISUALLY INSPECT FUEL TANK CAP
Check if the cap and/or gasket are deformed or damaged.
If necessary, repair or replace the cap.
4. INSPECT TVV OPERATION WITH COLD ENGINE
(a) The engine coolant temperature should be below 45 °C
(113 °F).
(b) Disconnect the EVAP hose from the union pipe.
(c) Start the engine.
(d) Gradually increase the engine speed from idle to 3,000 rpm and check that air suction is not felt at the union pipe.
5. INSPECT OPERATION OF VCV WITH HOT ENGINE
(a) Warm up the engine.
(b) With the engine idling, check that air suction is not felt at union pipe.
(c) Gradually increase the engine speed to 3,000 rpm and check that there is air suction at the union pipe.
(d) Reconnect the EVAP hose to the union pipe.
If no problem is found with this inspection, system is normal;
otherwise inspect each part.
6. REMOVE CHARCOAL CANISTER WITH BRACKET
7. REMOVE CHARCOAL CANISTER FROM BRACKET
8. REMOVE CAP FROM CHARCOAL CANISTER
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 777 of 1399
−
EMISSION CONTROL EVAPORATIVE EMISSION (EVAP) CONTROL SYSTEM
EC−7
1996 LAND CRUISER (RM451U)
9. VISUALLY INSPECT CHARCOAL CANISTER
Look for cracks or damage.
10. INSPECT FOR CLOGGED FILTER AND STUCK VALVE
(a) Using low pressure compressed air (7.26 kPa, 74 gf/cm
2,
1.05 psi), blow into tank pipe and check that air flows with-
out resistance from the other pipes.
(b) While holding drain pipe closed, blow air (1.96 kPa, 20 gf/
cm
2, 0.28 psi) into purge pipe and check that air flow with-
out resistance from tank pipe.
If a problem is found, replace the charcoal canister.
11. CLEAN FILTER IN CANISTER
Clean the filter by blowing 294 kPa (3 kgf/cm
2, 43 psi) of com-
pressed air into tank pipe while holding purge pipe closed.
NOTICE:
Do not attempt to wash the canister.No activated carbon
should come out.
12. REINSTALL CAP TO CHARCOAL CANISTER
13. REINSTALL CHARCOAL CANISTER TO BRACKET Torque: 14 N·m (145 kgf·cm, 10 ft·lbf)
14. REINSTALL CHARCOAL CANISTER WITH BRACKET Torque: 18 N·m (185 kgf·cm, 13 ft·lbf)
15. DRAIN ENGINE COOLANT
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 778 of 1399
EC−8
−
EMISSION CONTROL EVAPORATIVE EMISSION (EVAP) CONTROL SYSTEM
1996 LAND CRUISER (RM451U)
16. REMOVE TVV FROM CYLINDER HEAD
(a) Disconnect the 2 vacuum hoses.
(b) Remove the TVV.
17. INSPECT TVV OPERATION
(a) Cool the TVV to below 45° C (113°F) with cool water.
(b) Check that air flows from pipe J to the air filter.
(c) Heat the TVV to above 64° C (147°F) with hot water.
(d) Check that air flows from pipe J to pipe K.
If operation is not as specified, replace the TVV.
18. REINSTALL TVV
(a) Apply adhesive to 2 or 3 threads of the TVV, and install it.
Adhesive:
Part No. 08833 −00070, THREE BOND 1324
or equivalent
Torque: 29 N·m (300 kgf·cm, 22 ft·lbf)
(b) Reconnect 2 vacuum hoses.
19. REFILL WITH ENGINE COOLANT
20. REMOVE INTAKE MANIFOLD STAY
21. REMOVE VCV
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 779 of 1399
EC0107
Orange PipeBlack Pipe
−
EMISSION CONTROL EVAPORATIVE EMISSION (EVAP) CONTROL SYSTEM
EC−9
1996 LAND CRUISER (RM451U)
22. INSPECT VCV
(a) Apply vacuum above 9.3 kPa (70 mmHg, 2.76 in.Hg) to
pipe S.
(b) Blow air into pipe Y and check that air comes out of pipe Z.
(c) Stop the applied vacuum.
(d) Blow air into pipe Y and check that air does not come out
of pipe Z.
If operation is not as specified, replace the VCV.
23. REINSTALL VCV
24. INSTALL INTAKE MANIFOLD STAY Torque: 36 N·m (360 kgf·cm, 26 ft·lbf)
25. REMOVE INTAKE MANIFOLD STAY
26. REMOVE CHECK VALVE
27. INSPECT CHECK VALVE
(a) Check that air flows from the orange pipe to the black pipe.
(b) Check that air does not flow from the black pipe to the
orange pipe.
If operation is not as specified, replace the check valve.
28. REINSTALL CHECK VALVE
HINT:
Reinstall the check valve with the black pipe facing the VCV
side.
29. INSTALL INTAKE MANIFOLD STAY Torque: 36 N·m (360 kgf·cm, 26 ft·lbf)
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010
Page 780 of 1399
EC0GC−01
EC−10
−
EMISSION CONTROL EXHAUST GAS RECIRCULATION (EGR) SYSTEM
623
Author: Date:
1996 LAND CRUISER (RM451U)
EXHAUST GAS RECIRCULATION (EGR) SYSTEM
COMPONENTS
Brought to you by BirfMark
Brought to you by BirfMark
Version 1.11 - 03/16/2010