engine YAMAHA TTR125 2003 Workshop Manual
Page 190 of 578
3 - 14
INSP
ADJ
SPARK ARRESTER CLEANING (For USA)
SPARK ARRESTER CLEANING (For USA)
WARNING
Be sure the exhaust pipe and muffler are
cool before cleaning the spark arrester.
Do not start the engine when cleaning the
exhaust system.
1. Remove:
Bolt (spark arrester) 1
2. Remove:
Spark arrester 1
Pull the spark arrester out of the muf-
fler.
3. Clean:
Spark arrester
Tap the spark arrester lightly, then use
a wire brush to remove any carbon
deposits.
4. Install:
Spark arrester
Insert the spark arrester into the muffler
and align the bolt holes.
Bolt (spark arrester)
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
Page 206 of 578
3 - 22
INSP
ADJ
DRIVE CHAIN SLACK ADJUSTMENT
6. Lubricate:
Drive chain
Drive chain lubricant:
SAE 10W-30 motor oil or suit-
able chain lubricants
DRIVE CHAIN SLACK ADJUSTMENT
1. Elevate the rear wheel by placing the
suitable stand under the engine.
2. Check:
Drive chain slack a
In the center between the drive axle
and rear wheel axle.
Out of specification → Adjust.
NOTE:
Before checking and/or adjusting, rotate the
rear wheel through several revolutions and
check the slack several times to find the tight-
est point. Check and/or adjust chain slack with
rear wheel in this “tight chain” position.
Drive chain slack:
35 ~ 50 mm (1.4 ~ 2.0 in)
3. Adjust:
Drive chain slack
Drive chain slack adjustment steps:
Loosen the axle nut 1.
Turn both drive chain pullers 2 the same
amount a and adjust them to the stopper
in the same position so that the drive chain
slack is within the specified limits.
CAUTION:
Too small chain slack will overload the
engine and other vital parts; keep the
slack within the specified limits.
Tighten the axle nut while pushing down
the drive chain.
T R..
Axle nut:
60 Nm (6.0 m • kg, 43 ft • lb)
Page 210 of 578
3 - 24
INSP
ADJ
REAR SHOCK ABSORBER ASSEMBLY
INSPECTION
1. Inspect:
Swingarm smooth action
Abnormal noise/unsmooth action →
Grease the pivoting points or repair the
pivoting points.
Damage/oil leakage → Replace.
REAR SHOCK ABSORBER SPRING
PRELOAD ADJUSTMENT
1. Elevate the rear wheel by placing the
suitable stand under the engine.
2. Remove:
Left side cover
3. Loosen:
Locknut 1
4. Adjust:
Spring preload
By turning the adjuster 2.
NOTE:
Be sure to remove all dirt and mud from
around the locknut and adjuster before
adjustment.
The length of the spring (installed) changes
1.5 mm (0.06 in) per turn of the adjuster.
CAUTION:
Never attempt to turn the adjuster beyond
the maximum or minimum setting.Stiffer →Increase the spring preload.
(Turn the adjuster 2 in.)
Softer →Decrease the spring preload.
(Turn the adjuster 2 out.)
Spring length (installed) a:
Standard length Extent of adjustment
TT-R125E:
165 mm
(6.50 in)
TT-R125LWE:
160.5 mm
(6.32 in)TT-R125E:
155 ~ 175 mm
(6.10 ~ 6.89 in)
TT-R125LWE:
147.5 ~ 167.5 mm
(5.81 ~ 6.59 in)
REAR SHOCK ABSORBER ASSEMBLY INSPECTION/
REAR SHOCK ABSORBER SPRING PRELOAD ADJUSTMENT
Page 218 of 578
3 - 28
INSP
ADJ
STEERING HEAD INSPECTION AND ADJUSTMENT
2. Inspect:
Bearing free play
Exist play → Replace.
STEERING HEAD INSPECTION AND
ADJUSTMENT
1. Elevate the front wheel by placing a suit-
able stand under the engine.
2. Check:
Steering shaft
Grasp the bottom of the forks and gen-
tly rock the fork assembly back and
forth.
Free play → Adjust steering head.
3. Check:
Steering smooth action
Turn the handlebar lock to lock.
Unsmooth action → Adjust steering ring
nut.
4. Adjust:
Steering ring nut
Steering ring nut adjustment steps:
Remove the number plate and starter
knob.
Remove the main switch, handlebar and
upper bracket.
Remove the special washer 1
Remove the upper ring nut 2, and rubber
washer 3.
Loosen the lower ring nut 4 using the
steering nut wrench 5.
Steering nut wrench:
YU-33975/90890-01403
Page 226 of 578
3 - 32
INSP
ADJ
ELECTRICAL/SPARK PLUG INSPECTION
EC370000
ELECTRICAL
EC371001
SPARK PLUG INSPECTION
1. Remove:
Spark plug
2. Inspect:
Electrode 1
Wear/damage → Replace.
Insulator color 2
Normal condition is a medium to light
tan color.
Distinctly different color → Check the
engine condition.
NOTE:
When the engine runs for many hours at low
speeds, the spark plug insulator will become
sooty, even if the engine and carburetor are in
good operating condition.
3. Measure:
Plug gap a
Use a wire gauge or thickness gauge.
Out of specification → Regap.
4. Clean the plug with a spark plug cleaner
if necessary.
Spark plug gap:
0.6 ~ 0.7 mm (0.02 ~ 0.03 in)
Standard spark plug:
CR7HSA (NGK)
U22FSR-U (DENSO)
5. Tighten:
Spark plug
NOTE:
Before installing a spark plug, clean the gas-
ket surface and plug surface.
Finger-tighten a the spark plug before torqu-
ing to specification b.
T R..13 Nm (1.3 m · kg, 9.4 ft · lb)
Page 246 of 578
4 - 1
ENG
EC400000
ENGINE
EC4R0000
SEAT, FUEL TANK AND SIDE COVERS
Extent of removal:
1
Seat removal
2
Fuel tank removal
3
Side covers removal
4
Number plate removal
Extent of removal Order Part name Q’ty Remarks
Preparation for removal
SEAT, FUEL TANK AND SIDE
COVERS REMOVAL
Turn the fuel cock to “OFF”.
1 Seat 1
2 Air scoop (left and right) 2
3 Fuel hose 1 Remove on fuel tank side.
4 Fitting band 1
5 Bolt (fuel tank) 2
6 Fuel tank 1
7 Left side cover 1
8 Right side cover 1
9Number plate
1
13
4
2
3
SEAT, FUEL TANK AND SIDE COVERS
Page 254 of 578
4 - 5
ENG
CARBURETOR
HANDLING NOTE
At high altitudes, the atmospheric pressure is
lower. This can make the fuel mixture too rich,
leading to such problems as fouled.
Spark plugs and slow response at high engine
speeds. A special part, High Altitude Main Jet
1
#102.5 (620-1423A-71-A0) is available to
correct this.
EC463000
REMOVAL POINTS
Throttle valve
1. Remove:
Throttle valve
1
Spring (throttle valve)
2
Carburetor top cover
3
Throttle cable
4
NOTE:
While compressing the spring (throttle valve),
disconnect the throttle cable.
Pilot air screw
1. Remove:
Pilot air screw
1
NOTE:
To optimize the fuel flow at a smaller throttle
opening, each machine’s pilot air screw has
been individually set at the factory. Before
removing the pilot air screw, turn it in fully and
count the number of turns. Record this number
as the factory-set number of turns out.
Page 266 of 578
4 - 11
ENGCARBURETOR
3. Install:
Carburetor top cover 1
Starter plunger 2
Air vent hose 3
Over flow hose 4
Fuel hose 5
NOTE:
Align the slit a of the throttle valve with the tab
b of the carburetor body.
CAUTION:
In order to release the starter cable from
the twist, install the starter knob after tight-
ening the nut for the starter plunger.
4. Adjust:
Idle speed
Refer to “ENGINE IDLING SPEED
ADJUSTMENT” section in the CHAP-
TER 3.
Page 268 of 578
4 - 12
ENGCYLINDER HEAD
CYLINDER HEAD
CYLINDER HEAD SIDE COVER AND TAPPET COVER
Extent of removal:1 Cylinder head side cover and tappet cover removal
Extent of removal Order Part name Q’ty Remarks
CYLINDER HEAD SIDE COVER
AND TAPPET COVER
REMOVAL
Preparation for removal Seat and fuel tank Refer to “SEAT, FUEL TANK AND SIDE
COVERS” section.
Muffler Refer to “MUFFLER” section.
Carburetor Refer to “CARBURETOR” section.
CDI unit Remove from the frame.
1 Engine bracket 1
2 Spark plug 1
3 Cylinder head side cover 1
4 Tappet cover 2
5 Crankshaft end accessing screw 1
6Timing mark accessing screw
1
1
Page 276 of 578
4 - 16
ENGCYLINDER HEAD
Warpage limit:
0.03 mm (0.0012 in)
If the warpage is out of specification,
resurface the cylinder head.
Place #400 ~ 600 grit wet sandpaper on
the surface plate, and re-surface the head
using a figure-eight sanding pattern.
NOTE:
Rotate the cylinder head several times to
avoid removing too much material from one
side.
ASSEMBLY AND INSTALLATION
Cylinder head
1. Install:
Dowel pin 1
Gasket 2 New
2. Install:
Cylinder head
Copper washer
Bolt (cylinder head)
NOTE:
Apply Quick gasket® (YAMAHA Bond
No.1215) on end of the cylinder head bolts
(M6), as shown.
Apply the engine oil on the contact surfaces of
the bolts (cylinder head) and copper washers.
Follow the numerical order shown in the illus-
tration. Tighten the bolts in two stages.
Quick gasket®:
ACC-QUICK-GS-KT
YAMAHA Bond No.1215:
90890-85505
T R..M8 22 Nm (2.2 m · kg, 16 ft · lb)
M6 10 Nm (1.0 m · kg, 7.2 ft · lb)