diagram YAMAHA YZ450F 2004 Notices Demploi (in French)
Page 134 of 642
2 - 23
SPEC
◊Position the neutral switch lead, CDI magneto
lead and radiator breather hose at the left of the
frame.
B
0
C-C
D-D
B
A
AB
DD
CC
F
D G
F
D
◊
A
G
A
A
F
AE
A
DC A A A A B A 0
1
2
3
4 5 6 7 89
‰
̉
Ï
‰
Î
Çı ÅÊÓ
È
Ô
Ò
A ˜
ˆ
Ø ∏ Œ ÂÍ
Ë HIH
E
CABLE ROUTING DIAGRAM
Page 136 of 642
2 - 24
SPECCABLE ROUTING DIAGRAM
1CDI unit
2Hot starter cable
3Throttle cable (return)
4Throttle cable (pull)
5Ignition coil
6Radiator breather hose
7Radiator hose 4
8Cylinder head breather
hose
9CDI unit bracket
0CDI unit bandÅPass the hot starter cable and
throttle cables through the cable
guides.
ıPass the hot starter cable over the
top radiator mounting boss.
ÇPass the hot starter cable and
throttle cables between the radia-
tor and frame, then over the mid-
dle radiator mounting boss.
ÎPass the throttle cables on the
outside of the ignition coil.
‰Pass the carburetor breather hose
(throttle cable cover) through the
hose holder.
ÏPass the radiator breather hose at
the rear of the radiator, on the left
of the chassis, and then between
the frame and radiator hose 4.ÌInsert the CDI unit band over the
CDI unit bracket as far as possi-
ble.
ÓFirst install the CDI unit and CDI
unit band to the CDI unit bracket,
then the CDI unit bracket to the
frame.
8
761
09
1
52
3
4
Å
ı
Ç
Î ‰ÏB
A
A
B
Ì
Ó
Page 138 of 642
2 - 25
SPECCABLE ROUTING DIAGRAM
1Master cylinder
2Brake hose holder
3Brake hoseÅInstall the brake hose so that its
pipe portion directs as shown and
lightly touches the projection on
the caliper.
ıPass the brake hose into the
brake hose holders.
ÇIf the brake hose contacts the
spring (rear shock absorber), cor-
rect its twist.
ÎInstall the brake hose so that its
pipe portion directs as shown and
lightly touches the projection on
the master cylinder.
Page 140 of 642
2 - 26
SPECCABLE ROUTING DIAGRAM
1Throttle cable
2Fuel tank breather hose
3Clamp
4Clutch cable
5Hot starter cable
6“ENGINE STOP” button lead
7Brake hose
8Hose guideÅFasten the “ENGINE STOP” but-
ton lead to the handlebar with the
plastic band.
ıPass the brake hose in front of the
number plate.
3
6
40˚±10˚
A
12
3
4
5
6
7
8 Å
ı
A
Page 274 of 642
4 - 18
ENGCARBURETOR
15. Install:
Jet needle 1
Collar 2
Spring 3
Needle holder 4
Throttle valve plate 5
To throttle valve 6.
5
6
1
2
3
4
16. Install:
Throttle valve assembly 1
Screw (throttle shaft) 2
NOTE:
Install the valve lever rollers 3 into the slits a
of the throttle valve.
17. Install:
O-ring 1
Valve lever housing cover 2
Bolt (valve lever housing cover) 3
18. Install:
Carburetor breather hose 1
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
Page 397 of 642
4 - 79
ENG
MAGNETO CDI
CDI-SCHWUNGRADMAGNETZÜNDER
4. Anschließen:
CDI-Schwungradmagnetzünder-Kabel
Siehe unter “KABELFÜHRUNG” im KA-
PITEL 2.
5. Montieren:
Paßstift
Dichtung [Kurbelgehäusedeckel (links)]
Kurbelgehäusedeckel (links) 1
Halterung (Zylinderkopf-Entlüftungs-
schlauch) 2
Schraube [Kurbelgehäusedeckel (links)]
HINWEIS:
Die Schrauben stufenweise über Kreuz fest-
ziehen.
New
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
4. Connecter:
Fil de magnéto CDI
Se référer au paragraphe “DIAGRAMME
DE CHEMINEMENT DE CABLE” au
CHAPITRE 2.
5. Monter:
Goujon
Joint [couvercle de carter (gauche)]
Couvercle de carter (gauche) 1
Support de flexible (reniflard de culasse) 2
Boulon [couvercle de carter (gauche)]
N.B.:
Serrer les vis par étapes dans un ordre entrecroisé.
New
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
Page 564 of 642
6 - 1
–+ELECELECTRICAL COMPONENTS AND WIRING DIAGRAM
EC600000
ELECTRICAL
EC610000
ELECTRICAL COMPONENTS AND WIRING DIAGRAM
EC611000
ELECTRICAL COMPONENTS
1“ENGINE STOP” button
2TPS (throttle position sensor)
3Neutral switch
4CDI magneto
5Ignition coil
6Spark plug
7CDI unitCOLOR CODE
B...................... Black
Br .................... Brown
G ..................... Green
L ...................... Blue
O ..................... Orange
P...................... Pink
R ..................... Red
Sb.................... Sky blue
EC612000
WIRING DIAGRAM
71
5
62
3
4
B/WB/W
B/L
B/Y
SbSb
G/B
LYLY
P
B
B
B
B
G
O
WR
P
GW
R PP
B Br W
W
B/YGBr
G RR
OB Sb Sb Y
Y
WY
W
GG
B
PP
Br BrR R
OL
B SbY LL
B/L B/WB/W G/B
B B
B/L L Sb
B/L
G/B G/B
B/Y
B/Y B/W
O B/W
BrBr
W ..................... White
Y ...................... Yellow
B/L ................... Black/Blue
B/W .................. Black/White
B/Y ................... Black/Yellow
G/B................... Green/Black
L/W .................. Blue/White
R/W .................. Red/White
Page 571 of 642
–+ELECZÜNDANLAGE
ZÜNDANLAGE
FEHLERSUCHE
Folgendes Diagramm hilft zündanlagen- und zündkerzenbedingte Motorstörungen zu beheben.
* Nur wenn der Zündfunkenstreckentester verwendet wird
HINWEIS:
Die folgenden Teile vor Beginn der Störungsbeseitigung ausbauen.
1) Sitz
2) Kraftstofftank
Folgendes Spezialwerkzeug verwenden.
Zündfunkenstrecke
kontrollieren*Zündkerze reinigen
oder erneuern.
Kabelanschlüsse der
gesamten Zündenlage
kontrollieren.
(Steckverbinder,
Kabel und Zündspule)Erneuern oder instand
setzen.
Motorstoppschalter
“ENGINE STOP”
kontrollieren.Erneuern.
Zündspule kontrollieren. Primärspule Erneuern.
Sekundär-
spuleErneuern.
CDI-Schwungradmagnet-
zünder kontrollieren.Impulsgeber Erneuern.
Erregerspule Erneuern.
Leerlaufschalter
kontrollieren.Erneuern oder instand
setzen.
CDI-Zündbox erneuern.
Zündfunkenstreckentester:
YM-34487
Zündprüfer:
90890-06754Taschen-Multimeter:
YU-3112-C/90890-03112
Kein Zündfunke
In Ordnung
In Ordnung
In Ordnung
In Ordnung
Zündfunke
Nicht in Ordnung
In Ordnung
Nicht in Ordnung
Nicht in Ordnung
Nicht in Ordnung
Nicht in Ordnung
Nicht in Ordnung
Nicht in Ordnung
6 - 3