coolant level ASTON MARTIN V8 VANTAGE 2010 Workshop Manual
[x] Cancel search | Manufacturer: ASTON MARTIN, Model Year: 2010, Model line: V8 VANTAGE, Model: ASTON MARTIN V8 VANTAGE 2010Pages: 947, PDF Size: 43.21 MB
Page 238 of 947

Engine Assembly (03.00)
Engine (03.00)3-0-6 Workshop Manual Issue 5, January 2010
7. Remove throttle body duct for access (clips x3) (refer to Figure 2).
Suspension Removal
8. Remove RH wheel arch liner (refer to Workshop Manual procedure 01.02.GB Wheel Arch Liner - Front - RH -
Renew).
9. Remove LH wheel arch liner (refer to Workshop Manual procedure 01.02.FB Wheel Arch Liner - Front - LH -
Renew).
10. Remove road wheel/s.
11. Remove brake callipers (tie aside).
12. Remove brake discs.
13. Remove anti-roll bar from links (nuts x2).
14. Remove front springs and da mpers (refer to Workshop
Manual procedure 04.03.AA Spring and Damper
Assembly - Front Pair - Renew).
15. Disconnect track rod ends.
16. Remove level sensor link from bottom arm (nut x1).
17. Mark lower arm bolt and washer positions (to retain geometry).
18. Remove bottom arms (nut and bolt x4) with uprights and top arm.
19. Disconnect level sensor multiplug.
Cooling Removal
20. Drain coolant (refer to Workshop Manual procedure 03.03.AD Coolant - Drain and Refill). 21. Disconnect top hose and unclip from body (refer to
Figure 3).
22. Disconnect bottom hose and tie aside (refer to Figure 4).
23. Disconnect expansion tank to engine hose (quickfit).
24. Disconnect heater feed hose (quickfit) (refer to Figure
5).
Figure 5
Figure 2
$ 3 #
Figure 3
Figure 4
$ 3 #
$ 3 #
$ 3 #
Page 254 of 947

Engine Structure (03.01)
3-1-6Workshop ManualIssue 4, November 2008
Removal Manifold Parts
47. Remove EGR valve (bolts x2) and gasket.
48. Remove IAT sensor.
49. Remove throttle body (bolts x4) and gasket.
50. Remove fuel rail (bolts x4) with injectors.
Installation
1. Install fuel rail (bolts x4) with injectors. (fit new O-rings
to injectors).
2. Install throttle body (bolts x4) and new gasket.
3. Install IAT sensor.
4. Install EGR valve and new gasket.
Installation Manifold to Vehicle
5. Install new gaskets to cylinder block (glue in place).
6. Install manifold (allowing access to install bolt for purge line P-clip).
7. Install manifold bolts (x 10) (torque and tightening
sequence).
8. Install bolts (x2) bracket to manifold (rear).
9. Connect EGR pipe union.
10. Connect EGR vacuum hose.
11. Connect air cleaner duct (clip x1).
12. Connect breather pipe quickf its (x2) to air cleaner duct.
13. Connect throttle body multiplug and harness clip.
14. Connect manifold heating hoses (x2).
Installation RH Side
15. Connect EGR vacuum pipe to sensor and manifold.
16. Install coolant pipe bracket (bolt x2, nut x2).
17. Connect EGR (x1), fuel rail pressure sensor (x1) and injector multiplugs (x4).
18. Refit harness to coolant pipe bracket (fir tree x3).
19. Connect heater hose to pipe (quick fit).
20. Refit heater hose (clipx2) and EGR vacuum lines (clips
x2) to bracket.
21. Install fuel feed pipe.
22. Install purge pipe P-clip.
23. Install harness bracket to engine.
24. Feed harness into inner wing area.
25. Install fusebox to bracket.
26. Install earth lead to fusebox.
27. Install battery lead to fusebox (1x nut and rubber cover).
28. Install multiplugs to fuse box.
29. Install fusebox bracket fixings.
30. Refit harness fir tree clips to cylinder head.
31. Refit engine breather hose.
32. Install VVT solenoid multiplug, position coil and CMP harness (1x edge clip).
33. Install ECM (see Workshop Manual procedure 03.14.BB Engine Control Module - RH - Renew).
34. Install coil cover.
Installation LH Side
35. Connect breather hose to manifold (quickfit). 36. Connect IAT multiplug.
37. Unclip injector harness from cam cover (x2).
38. Connect injector multiplugs (x4).
39. Install pipe support bracket (nuts x2, bolts x2).
40. Install harness support bracket (bolt x1, nut x2) release
harness clips (fir tree x3).
41. Connect booster hose to manifold and support clip.
42. Connect heater hose from pipe (quick fit).
43. Install heater hose (x2) and throttle body hose (x2) from support bracket.
44. Connect purge line to manifold and into support clip.
45. Connect breather hoses (x2) to cam cover.
46. Install coil cover.
47. Install corner cross brace (torque bolts with vehicle on level ground).
48. Refill coolant (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
49. Install cross brace. (torque bolts with vehicle on level
ground).
Upper Intake Manifold Assembly (RHD)
- Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Coolant drain (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
3. Remove cross brace (bolts x4).
Removal RH Side
4. Remove coil cover.
5. Remove corner cross brace.
6. Disconnect breather hose (quick fit) move aside.
7. Remove purge pipe P-clip (bolt x1) and move pipe
aside.
8. Remove harness bracket from engine (bolts x2, nut x1).
9. Release fuel feed hose from rail (clip x1) and move aside.
10. Disconnect heater hose from pipe (quick fit).
11. Release heater hose (clips x2) and EGR vacuum line (clips x2) from bracket.
12. Release harness from coolant pipe bracket (fir tree x3).
13. Disconnect EGR (x1), fuel rail pressure sensor (x1) and injector (x4) multiplugs, move harness aside.
14. Remove coolant pipe bracke t (nuts x2 and bolts x2).
15. Disconnect EGR vacuum pipe from sensor and
manifold, move aside. Note: The installation is not handed
Repair Operation Time (ROT)
ItemCode
Upper Intake Manifold Assembly-
Renew RHD
03.01.BE
Page 256 of 947

Engine Structure (03.01)
3-1-8Workshop ManualIssue 4, November 2008
23. Install fuel feed pipe.
24. Install purge pipe P-clip.
25. Install harness bracket to engine.
26. Refit harness fir tree clips to cylinder head.
27. Refit engine breather hose.
28. Install VVT solenoid multiplug, position coil and CMP
harness (1x edge clip).
29. Install corner cross brace (torque bolts with vehicle on level ground).
30. Install coil cover.
Installation LH Side
31. Connect breather hose to manifold (quickfit).
32. Connect IAT multiplug.
33. Install injector harness to cam cover (x2).
34. Connect injector multiplugs (x4).
35. Install pipe support bracket (nuts x2, bolts x2).
36. Install harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
37. Connect booster hose to manifold and support clip.
38. Connect heater hose from pipe (quick fit).
39. Install heater hose (x2) and throttle body hose (x2) from
support bracket.
40. Connect purge line to manifold and into support clip.
41. Connect breather hoses (x2) to cam cover.
42. Feed harness into inner wing area.
43. Install fusebox to bracket.
44. Install earth lead to fusebox.
45. Install battery lead to fusebox (1x nut and rubber cover).
46. Install multiplugs to fuse box.
47. Install fusebox bracket fixings.
48. Install ECM (see Workshop Manual procedure 03.13.ND Module - Power Train Control - RHD -
Renew).
49. Install coil cover.
50. Refill coolant (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
51. Install cross brace. (torque bolts with vehicle on level
ground).
Upper Intake Manifold Assembly Gasket
(LHD) - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Coolant drain (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill). 3. Remove cross brace (bolts x4).
Removal R/H Side
4. Remove coil cover.
5. Disconnect breather hose (quick fit) move aside.
6. Release (alt/inj) harness fir tr
ee clips (x3) from cylinder
head and move aside.
7. Remove fuse box bracket fixings (bolt and nut) (allows movement).
8. Remove ECM (see Workshop Manual procedure 03.13.NC Module - Powe r Train Control - Renew).
9. Remove battery lead (x1nut and rubber cover) from fuse box (2x leads).
10. Remove multiplugs (x10) from fusebox.
11. Remove earth terminal (1x nut and rubber cover) from fusebox.
12. Remove fuse box from bracket (bolt x2).
13. Release harness fir tree clips (x3) from engine bracket.
14. Feed harness from inner wing and over engine to gain access to cam cover.
15. Remove purge pipe P-clip (bolt x1) and move pipe
aside.
16. Remove harness bracket from engine (bolts x2, nut x1).
17. Release fuel feed hose from rail (clip x1) and move aside.
18. Disconnect heater hose from pipe (quick fit).
19. Release heater hose (clips x2) and EGR vacuum line (clips x2) from bracket.
20. Release (inj/alt) harness from coolant pipe bracket (fir tree x3).
21. Disconnect EGR (x1), fuel rail pressure sensor (x1) and injector multiplugs (x4), move harness aside.
22. Remove coolant pipe bracke t (nuts x2 and bolts x2).
23. Disconnect EGR vacuum pipe from sensor and
manifold, move aside.
Removal L/H Side
24. Remove corner cross brace.
25. Remove coil cover.
26. Disconnect breather hoses from cam cover (x2) for access.
27. Disconnect purge line from manifold (quickfit) and
support clip for access.
28. Disconnect heater hose from pipe (quick fit).
29. Release heater hose (x2) and throttle body hose (x2) from support bracket.
30. Remove booster hose from manifold and support clip.
31. Remove harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
32. Release pipe support bracket (nuts x2, bolts x2) move aside.
33. Disconnect injector multiplugs (x4).
34. Unclip injector harness from cam cover (x2).
35. Disconnect IAT multiplug.
36. Disconnect breather hose from manifold (quickfit).
Repair Operation Time (ROT)
Page 257 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-9
Removal Manifold
37. Disconnect manifold heating hoses (x2).
38. Disconnect throttle body multiplug and harness clip.
39. Disconnect breather pipe qu ickfits (x2) from air cleaner
duct.
40. Disconnect air clea ner duct (clip x1).
41. Disconnect EGR vacuum hose.
42. Disconnect EGR pipe union and tie aside.
43. Remove manifold bolts (x 10) (see Figure 1).
Figure 1
44. Remove bolts (x2) bracket to manifold (rear).
45. Move manifold (2x people) forward, remove bolt for purge line P-clip, remove manifold.
46. Remove gaskets and clean mating faces.
Installation
Manifold to Vehicle
1. Install new gaskets to cylinder block (glue in place).
2. Install manifold (allowing access to install bolt for purge line P-clip).
3. Install manifold bolts (x10) (torque and tightening sequence).
4. Install bolts (x2) bracket to manifold (rear).
5. Connect EGR pipe union.
6. Connect EGR vacuum hose.
7. Connect air cleaner duct (clip x1).
8. Connect breather pipe quickf its (x2) to air cleaner duct.
9. Connect throttle body multiplug and harness clip.
10. Connect manifold heating hoses (x2).
Installation RH Side
11. Connect EGR vacuum pipe to sensor and manifold.
12. Install coolant pipe bracket (bolt x2, nut x2).
13. Connect EGR (x1), fuel rail pressure sensor (x1) and
injector multiplugs (x4).
14. Refit (inj/alt) harness to coolant pipe bracket (fir tree x3).
15. Connect heater hose to pipe (quick fit).
16. Refit heater hose (clipx2) and EGR vacuum lines (clips x2) to bracket.
17. Install fuel feed pipe.
18. Install purge pipe P-clip.
19. Install harness bracket to engine. 20. Feed harness into inner wing area.
21. Install fusebox to bracket.
22. Install earth lead to fusebox.
23. Install battery lead to fusebox (1x nut and rubber cover).
24. Install multiplugs to fuse box.
25. Install fusebox bracket fixings.
26. Refit harness fir tree clips to cylinder head.
27. Refit engine breather hose.
28. Install VVT solenoid multip
lug, position coil and CMP
harness (1x edge clip).
29. Install ECM (see Workshop Manual procedure 03.13.NC Module - Power Train Control - Renew).
30. Install coil cover.
Installation LH Side
31. Connect breather hose to manifold (quickfit).
32. Connect IAT multiplug.
33. Unclip injector harness from cam cover (x2).
34. Connect injector multiplugs (x4).
35. Install pipe support bracket (nuts x2, bolts x2).
36. Install harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
37. Connect booster hose to manifold and support clip.
38. Connect heater hose from pipe (quick fit).
39. Install heater hose (x2) and throttle body hose (x2) from support bracket.
40. Connect purge line to manifold and into support clip.
41. Connect breather hoses (x2) to cam cover.
42. Install coil cover.
43. Install corner cross brace (t orque bolts with vehicle on
level ground).
44. Refill coolant (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
45. Install cross brace. (torque bolts with vehicle on level
ground).
Upper Intake Manifold Assembly Gasket
(RHD) - Renew
Removal
1. Depressurise fuel rail (see Workshop Manual procedure 10.01.EK Fuel System - Depressurise).
2. Coolant drain (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
3. Remove cross brace (bolts x4).
Removal RH Side
4. Remove coil cover.
5. Remove corner cross brace.
A030113
Note: The installation is not handed
Repair Operation Time (ROT)
Page 259 of 947

Engine Structure (03.01)
Issue 4, November 2008Workshop Manual 3-1-11
23. Install VVT solenoid multiplug, position coil and CMP
harness (1x edge clip).
24. Install corner cross brace (t orque bolts with vehicle on
level ground).
25. Install coil cover.
Installation LH Side
26. Connect breather hose to manifold (quickfit).
27. Connect IAT multiplug.
28. Install injector harness to cam cover (x2).
29. Connect injector multiplugs (x4).
30. Install pipe support bracket (nuts x2, bolts x2).
31. Install harness support bracket (bolt x1, nut x2) release harness clips (fir tree x3).
32. Connect booster hose to manifold and support clip.
33. Connect heater hose from pipe (quick fit).
34. Install heater hose (x2) and throttle body hose (x2) from support bracket.
35. Connect purge line to mani fold and into support clip.
36. Connect breather hoses (x2) to cam cover.
37. Feed harness into inner wing area.
38. Install fusebox to bracket.
39. Install earth lead to fusebox.
40. Install battery lead to fusebox (1x nut and rubber cover).
41. Install multiplugs to fuse box.
42. Install fusebox bracket fixings.
43. Install ECM (see Workshop Manual procedure 03.13.ND Module - Powe r Train Control - RHD -
Renew)
44. Install coil cover.
45. Refill coolant (see Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
46. Install cross brace. (torque bolts with vehicle on level
ground).
Intake Manifold Assembly - Remove for
Access and Refit (With Engine Removed
)
Removal
1. Remove RH coil cover.
2. Disconnect breather hose (quick fit).
3. Release alternator and injector harness fir tree clips (x3) from cylinder head.
4. Remove nut and bolts (x2) securing harness bracket to
engine, remove bracket.
5. Release heater hose (clips x2) and EGR vacuum line (clips x2) from bracket.
6. Release alternator and injector harness fir tree clips (x3) from coolant pipe bracket. 7. Disconnect multiplugs from EGR valve, fuel rail pressure
sensor and injectors (x4).
8. Remove nuts (x2) and bolts (x2) securing coolant pipe
bracket, remove bracket.
9. Disconnect EGR vacuum pipe from sensor and manifold.
10. Remove LH coil cover.
11. Disconnect breather hoses (x2) from LH engine cover.
12. Disconnect purge line from manifold (quickfit) and
support clip for access.
13. Disconnect heater hose from pipe (quick fit).
14. Release heater hose (x2) and throttle body hose (x2) from support bracket.
15. Remove bolt and nuts (x2) securing harness support bracket, release harness clips (fir tree x3). Remove
bracket.
16. Remove nuts (x2) and bolts (x2) pipe support bracket.
17. Disconnect injector multiplugs (x4).
18. Release injector harness clip s (x2) from LH engine cover.
19. Disconnect IAT multiplug.
20. Disconnect breather hose from manifold (quickfit).
21. Disconnect manifold heating hoses (x2).
22. Disconnect throttle body multiplug and harness clip.
23. Disconnect EGR vacuum hose.
24. Loosen and disconnect EGR pipe union from EGR valve.
25. Remove bolts (x2) securing EGR pipe to RH exhaust
manifold, remove pi pe, discard gasket.
26. Progressively loosen and remove bolts (x 10) securing intake manifold to cylinder heads (see Figure 1).
Figure 1
27. Carefully remove intake ma nifold from cylinder heads.
28. Remove and discard gaskets (x2).
Installation
1. Clean intake manifold and mating faces on cylinder heads.
2. Install new gaskets to cyli nder block (glue in place).
3. Install intake manifold (allowing access to install bolt for purge line P-clip).
4. Install and torque tighten in take manifold bolts (x10) in
the correct sequence.
5. Clean EGR pipe and mating face on exhaust manifold.
Repair Operation Time (ROT)
A030113
Page 283 of 947

Lubrication System (03.02)
Engine (03.00)
Issue 5, Janauary 2010 Workshop Manual 3-2-9
6. Fill tank with approximately amount of displaced oil and replace cap.
7. Use handbook procedure to check oil level.
Oil Cooler Tank Assembly - Renew
Removal
1. Disconnect breather pipe qu ickfits (x2) from air cleaner
duct.
2. Remove throttle body du ct for access (clips x3).
3. Remove cap.
4. Disconnect top hose from engine (clip x1) tie aside
(catch coolant).
5. Remove breather pipe from oil tank (quick fit) (refer to Figure 1).
Figure 1
6. Remove pipes (x2) fr om oil tank, tie aside.
7. Raise vehicle on ramp.
8. Remove undertray (refer to Workshop Manual procedure 01.02.NB Undertray - Front - Renew).
9. Drain oil tank. 10. Remove bottom pipe (x1) from oil tank (refer to Figure
2).
Figure 2
11. Remove bolts (x3) that attach the oil thermostat to body (allows oil hose movement).
12. Lower ramp.
13. Remove bolts (x4) that attach the tank to body and lift out.
Installation
1. Position tank to body and fit bolts (x4) (torque).
2. Install oil pipes to tank (torque).
3. Connect breather hose.
4. Connect top hose to engine (clip x1).
5. Raise vehicle on ramp.
6. Install bottom oil pipe to tank (torque).
7. Install bolts (x3) that attach the oil thermostat to body (torque).
8. Install undertray (refer to Workshop Manual procedure 01.02.NB Undertray - Front - Renew).
9. Lower vehicle.
10. Install throttle body duct.
11. Connect breather pipe quickf its (x2) to air cleaner duct.
12. Fill tank with approximately amount of displaced oil and replace cap.
13. Use handbook procedure to check oil level.
14. Top up coolant.
Thermostat - Renew
Removal
1. Drain Coolant (refer to Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
2. Release breather valve (bolt x1) and tie aside.
3. Unclip engine harness for access (x4).
4. Remove one end of engine breather hoses for access (x3).
Repair Operation Time (ROT)
A030243
Repair Operation Time (ROT)
A030244
Page 284 of 947

Lubrication System (03.02)
Engine (03.00)3-2-10 Workshop Manual Issue 5, Janauary 2010
5. Remove breather valve bracket for access (nuts x2 bolt x1).
6. Remove thermostat housing from manifold (bolt x3).
7. Remove thermostat and sealing ring.
Installation
1. Install new thermostat and sealing ring .
2. Install thermostat housing (torque).
3. Install breather valve bracket.
4. Install breather hoses (x3) and clip.
5. Clip engine harness.
6. Install breather valve.
7. Refill coolant (refer to Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
Oil Cooler Tank Pipe Assembly - Renew
Removal
1. Remove oil pipe from oil tank (refer to Figure 1).
Figure 1
2. Raise vehicle on ramp.
3. Remove undertray (refer to Workshop Manual
procedure 01.02.NB Undertray - Front - Renew).
4. Remove RH air filter box (refer to Workshop Manual
procedure 03.12.DH Cleaner Assembly - Engine Air -
RH - Renew).
5. Unclip pipe (x4) from inner wing. 6. Remove pipe from oil cool
er and pull out from inner
wing (position container to catch oil) (refer to Figure 2).
Figure 2
Installation
1. Install pipe to oil cooler (torque) through inner wing .
2. Clip pipe (x4) to inner wing.
3. Install undertray (refer to Workshop Manual procedure 01.02.NB Undertray - Front - Renew).
4. Install RH air filter box (refer to Workshop Manual
procedure 03.12.DH Cleaner Assembly - Engine Air -
RH - Renew).
5. Lower vehicle on ramp.
6. Install pipe to oil tank (torque) ensure correct alignment in oil tank bracket.
7. Fill tank with approximatel y amount of displaced oil and
replace cap.
8. Use handbook procedure to check oil level.
Oil Thermostat to Tank Tube Assembly -
Renew
Removal
1. Disconnect breather pipe qu ickfits (x2) from air cleaner
duct.
2. Remove throttle body duct for access (clips x3).
Repair Operation Time (ROT)
A030241Repair Operation Time (ROT)
ItemCode
Oil Thermostat to Tank Tube Assembly
- Renew 03.02.CD
WAR NI NG
DO NOT GET USED ENGINE OIL ON YOUR SKIN. USED ENGINE OIL CAN BE HARMFUL.
A030219
Page 296 of 947

Cooling System (03.03)
Engine (03.00)3-3-2 Workshop Manual Issue 5, Janauary 2010
cooling system. No manual bleed points are provided on the
system.
The coolant reservoir should be full when the coolant system
is cold.
Engine Oil Cooler
The oil temperature is contro lled by an air/oil cooler
mounted at the front of the car. Engine oil is removed from
the dry sump, with the scavenge pump. The oil is routed to
a temperature controlled thermostat which controls the
directional flow of the oil. With the thermostat closed the oil
is routed directly to the oil tank. When the thermostat starts
to open (at 105°C) the oil is routed via the air/oil cooler
before entering the tank.
Specifications
Torque Figures
Maintenance
Coolant-Drain/Fill
1. Raise vehicle on ramp.
2. Remove front undertray (refer to Workshop Manual procedure 01.02.NB Undertray - Front - Renew).
3. Position suitable container to collect coolant.
4. Remove pressure cap from coolant reservoir.
5. Remove drain plug from radiator, allow coolant to drain.
6. Installation
7. Clean radiator drain plug.
8. Install and tighten drain plug.
9. Remove drain container.
10. Install front undertray (refer to Workshop Manual procedure 01.02.NB Undertray - Front - Renew).
11. Lower vehicle on ramp.
12. Fill cooling system with specified coolant mix to maximum level in coolant reservoir.
Antifreeze Mix
50% OAT coolant/50% water
Pressure Cap 150kpa
Leakage Rates 30cm/min. 150-180kpa
60xcm/min. 10kpa
Up to 75kpa @ 150cm/h
Water Pump Pumps 4ltr/min. @ 1000rpm
Pumps 240ltr/min. @ 7000rpm
Thermostat Opens between 86°C - 90°C (186.8°F -
194°F)
Fully open at 102°C
The anti-freeze is un ique and cannot be mixed with other
anti-freeze solutions. The OAT coolant/water mixture has a
life of 150,000 miles or 5 years (which ever comes first).
Description Nm. Ib/ft
Condenser A/C pipes 8-10 6-8
Thermostat Housing 8-12 6-9
Thermostat housing support bracket 23-27 17-20
Water pump 23-27 17-20
Water pump pulley 23-27 17-20
Oil Cooler 50 36
Caution
‘Spring-band’ clips
‘Spring-band’ clips must be installed as detailed below:
All coolant hoses and spigots must be de-greased before assembly.
Repair Operation Time (ROT)
ItemCode
Coolant-Drain-Fill 03.03.AD
WAR NI NG
DO NOT REMOVE THE PRESSURE CAP WHEN THE
COOLANT IS HOT. ALLOW TIME FOR THE COOLANT /
ENGINE TO COOL. TAKE PARTICULAR CARE TO AVOID BURNS FROM THE COOLING SYSTEM.
03-03-002
3
2
4
Coolant Hose SpigottAlignment Marks
Page 297 of 947

Cooling System (03.03)
Engine (03.00)
Issue 5, Janauary 2010 Workshop Manual 3-3-3
13. Install and tighten pressure cap.
14. Run engine until normal operating temperature is reached.
15. Stop engine, allow to cool down.
16. Re-check coolant level, top-up as necessary.
Thermostat - Renew
Removal
1. Drain Coolant (refer to Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
2. Release breather valve (bolt x1) and tie aside.
3. Unclip engine harness for access (x4).
4. Remove one end of engine breather hoses for access (x3).
5. Remove breather valve bracket for access (nuts x2 bolt x1).
6. Remove thermostat housing from manifold (bolt x3).
7. Remove thermostat and sealing ring.
Installation
1. Install new thermostat and sealing ring .
2. Install thermostat housing (torque).
3. Install breather valve bracket.
4. Install breather hoses (x3) and clip.
5. Clip engine harness.
6. Install breather valve.
7. Refill coolant (refer to Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
Wa t e r P u m p - R e n e w
Removal
1. Drain cooling system (refer to Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
2. Disconnect breather pipe qu ickfits (x2) from air cleaner
duct.
3. Remove throttle body du ct for access. (clips x3). 4. Remove pump pulley bolts (x
3) (refer to Figure 1).
Figure 1
5. Release tensioner and slip belt from idler.
6. Remove pump pulley.
7. Remove pump (bolts x7 ) (refer to Figure 2).
Figure 2
Installation
1. Install pump (bolts x7) (torque), clean mating faces.
2. Fit pulley to pump with bolts.
3. Torque pulley bolts (bolt x3).
4. Release tensioner and slip belt on idler.
5. Install throttle body duct.
6. Connect breather pipe quickf its (x2) to air cleaner duct.
7. Refill cooling system (refer to Workshop Manual procedure 03.03.AD Coolant - Drain and Refill).
Water Pump Pulley - Renew
Removal
1. Battery isolation switch ‘OFF’.
2. Disconnect breather pipe qu ickfits (x2) from air cleaner
duct.
WA R N I N G
DO NOT REMOVE THE PRESSURE CAP WHEN THE
COOLANT IS HOT. ALLOW TIME FOR THE COOLANT /
ENGINE TO COOL. TAKE PARTICULAR CARE TO
AVOID BURNS FROM THE COOLING SYSTEM.
Repair Operation Time (ROT)
Repair Operation Time (ROT)
Repair Operation Time (ROT)
A030350
A030351
Page 301 of 947

Cooling System (03.03)
Engine (03.00)
Issue 5, Janauary 2010 Workshop Manual 3-3-7
5. Raise expansion tank sufficient to disconnect multiplug, release clip, disconnect hose.
6. Remove expansion tank.
Install
1. Position expansion tank, connect multiplug , install hose and secure with clip.
2. Install nut and bolt, tighten to correct torque.
3. Install hoses (x3) on expansion tank, secure with clips (x3).
4. Install LH cross brace, inst all bolts (x4) (torque with
vehicle on level ground).
5. Refill expansion tank to correct level with correct
coolant fluid mixture.
6. Clean up any spilled coolant fluid.
Coolant Recovery Tank Assembly -
Remove and Install
Remove
1. Raise the vehicle and make it safe.
2. On Roadster vehicles, re move the centre undertray.
3. Remove the left side front wheel.
4. Remove the five or six M6 Torx-head screws that attach the rear of the wheelarch liner.
5. Remove the self-tapping screw that attaches the rear of the wheelarch liner into the wheelarch.
6. Turn the steering fully to the left.
7. Move the rear of the wheela rch liner away to get access
to the recovery tank. 8. Release the clip that attaches each of the two hoses (2)
to the recovery tank and release the hoses (refer to
Figure 1).
Figure 1
9. Remove the two M6 screws (3) that attach the recovery tank to the body and remove the recovery tank.
Install
1. Put the recovery tank in position on the body.
2. Install and tighten the two M6 attachment screws (3).
3. Connect the two hoses (2) to the recovery tank.
4. Put the clip back in position on each hose.
5. Put the wheelarch liner back into position.
6. Turn the steering to the centre position.
7. Install the self-tapping screw that attaches the rear of the wheelarch liner into the wheelarch.
8. Install the five or six M6 Torx-head screws that attach the rear of the wheelarch liner.
9. Install the front left roadwheel.
10. On Roadster vehicles, install the centre undertray.
11. Lower the vehicle.
12. Do a check of the coolant level and fill if necessary.
Repair Operation Time (ROT)