chain tensioner BMW 540i 2001 E39 Repair Manual
[x] Cancel search | Manufacturer: BMW, Model Year: 2001, Model line: 540i, Model: BMW 540i 2001 E39Pages: 1002
Page 267 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain1
Tap locating dowels into cover until they protrude 2 to 3 mm
from sealing surface.
- Using new gaskets, install lower timing chain cover:
Tap cover into position to engage dowels.
Install timing chain cover fasteners and tighten to
5 Nm (44
in-lb).
Drive dowels in flush to front of cover.
. Tighten cover mounting bolts alternately and in stages.
Install cylinder head to timing chain cover fasteners and
tighten.
Tightening torques Lower timing chain cover to block
M7 15 Nm (1 1 ft-lb)
ME 20 Nm (15 it-lb)
- Replace front crankshaft radial seal. See Crankshaft oil
seal, front, replacing
(M52 engine).
Install engine oil pan using
a new gasket. See 119 Lubrica-
tion System.
Mount primary timing chain sprocket to primary
cha~n so that
arrow on sprocket faces up. Mount sprocket to camshafl so
that tapped holes in camshaft are on left side of elongated
holes in sprocket.
4 Install adjustable timing chain tensioner (BMW special tool
11 4 220). Thread tool in finger tight until slack is removed
from chain.
NOTE-
BMW special tool 11 4 220 is an adjustable timing chain ten-
sioner that simulates the function of the hydraulic tensioner.
- Check that elongated holes in primary sprocket are centered
to bolt holes in camshafl and chain is free of slack.
- Install secondary timing chain guide and secondary chain
tensioner. Tighten mounting bolts (tensioner remains
locited
down).
F81.,,l,ryT-iib.l>nii,:oni-Aii Ri"ilti R
Page 268 of 1002

Downloaded from www.Manualslib.com manuals search engine
-- -
Chain 1
- Install cylinder identification trigger plate to front of intake
camshaft.
- Install spacer to front of intake camshaft
- Install secondary chain sprockets and chain as an assembly
so that arrows on sprockets are pointing up. Center mounting
holes in sprockets to bolt holes in camshafts.
4 lnstall thrust washers and spring plate to intake cam
sprocket.
Tighten intake camshaft sprocket nuts.
- Install VANOS control unit, see VANOS control unit, install-
ing
(M52 engine).
Tightening torque
Intake camshaft sprocket nuts to studs
(ME) 1011 Nm (8919 In-lb) 502117068
- Unlock and release secondary chain tensioner,
4 Preload primary timing chain by torquing adjustable primary
chain tensioner (BMW special tool
11 4 220) to 1.3 Nm
(11 in-lb).
- Tighten exhaust camshaft sprocket bolts in two stage
Tightening torque Exhaust camshaft sprocket bolls (M7)
Stage 1
5 Nrn (44 in-lb)
Stage
2 22 Nm (17 ft-lb)
- Remove crankshaft locking tool and camshaft locking tools.
< Align hub with keyway and tap into place. Insert new center
bolt with washer shoulder (arrow) facing hub.
CAUTION-
Inspect woodruff ley for damage before installing hub.
- Attach crankshaft holding tool (BMW special tools 11 2
15011 1 2 410) to hub. Counterhold hub with tool while tight-
ening center bolt.
CAUTION-
Do not use flywheel locling tool to hold crankshaft stationary
to loosen or tighten
cranlshaft hub center bolt. Use only the
special tools specified, or equivalent hub holding tool.
Page 269 of 1002

Downloaded from www.Manualslib.com manuals search engine
-- Camshaft Timing Chain -- -
Tightening torque
Vibration damper hub to crankshaft
410 Nm (300 ft-lb)
4 Install cranltshaft hub and vibration damper while aligning
locating hole (arrow) in damper with dowel pin in hub.
Tightening torque
Vibration damper and
pulley to
cranltshaft hub
22 Nm (17 ft-lb)
- Turn engine over by hand in direction of rotation at least two
full rotations. Reinstall camshaft and crankshaft locking
toois
to recheck engine timing. Remove locking tools if no faults
are found.
- Remove BMW special tool 11 3 390 (dummy tensioner) from
side of cyiinder head.
- Install primary chain tensionerso that cutout in tensioner pis-
ton engages chain rail.
Tightening torque
Timing chain tensioner to tensioner sleeve
70 Nm (52 ft-ib)
- Install cylinder head cover mounting studs, camshaft cover,
and cylinder head cover.
Tightening torque Cylinder head cover to cyiinder head
M6 nut 10 Nm (89 in-lb)
MB bolt 22 Nm (17 ft-lb)
- installation of remaining parts is reverse of removal, noting
the following:
When installing thermostat, make sure arrow or vent hole
faces up, if applicable.
Refill cooling system as described in
170 Radiator and
Cooling System.
Fill engine with oil and install new
oil filter as described in
020 Maintenance.
Tightening torque Upper timing chain cover to cylinder head
M6 nut 10 Nm (89 in-lb)
MB bolt 22 Nm (17 ft-lb)
VANOS oil supply pipe to VANOS control
unit banjo bolt
32 Nm (24 ft-ib)
Page 279 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing Chain
- Connect electrical harness connectors to camshaft position
sensors and VANOS solenoid valves.
- Remove BMW special locking tools from rear of cylinder
head.
- Remove cranltshaft locking tool and replace sealing plug.
Install intake camshaft baffle and cylinder head cover.
Checlc for correct seating of half-moon seals (A) in back of
cylinder head cover.
Use a small amount of Three Bond 1209
O or equivalent
sealant at corners
(B) of half-moon cutouts.
Similarly, seat gasket and
seal corners in front of cylinder
head, at VANOS control unit.
Tightening torque
Cylinder head cover to cylinder head
(M6) 10 Nm (89 in-lb)
- Remainder of installation is reverse of removal.
Tightening torques
Radiator fan (viscous clutch) to
coolant pump 40
Nm (30 ft-lb)
Spark plug to cylinder head
25 Nrn (18 ft-lb)
VANOS timing, checking and adjusting
(M52 TU and M54 engines)
Use this procedure to check and, if necessary, adjust cam-
shaft timing. This procedure assumes that the cylinder head
cover and intake
camshaft plastic baffle have been removed.
Also, be sure the cooling fan and the spark plugs have been
removed.
Remove primary camshaft chain tensioner cylinder
(arrow).
~~ ~ ~~ ~--~
CA UTlOAC
Primary camshaft chain tensioning piston is under spring
pressure.
Page 280 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing Chain
Insert BMW special tool 11 4 220 in cylinder head and bring
adjustment screw into contact with tensioning rail.
NOTE-
BMW special tool 11 4 220 is an adjustable primary chain
tensioner that simulates the function of the tensioner.
Preload primary chain tensioner rail:
Tighten adjusting screw on
BMW special tool 11 4 220.
Tightening torque
Primary chain tensioner preload 0.7 Nm (6 in-lb)
4 Unscrew oil pressure pipe from VANOS control unit. Remove
banjo bolt from oil pressure line and install BMW special tool
11 3 450.
CA UTIOPI-
Cover top of VANOS control unit with lint-free shop cloth. At-
tachment of compressed air line will force oil to spray out of
- Connect compressed air line to air fitting. Apply air pressure
set to
2 - 8 bar (30 - 110 psi).
Page 281 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain1
< With compressed air line connected, turn engine at least
twice in direction of rotation until cylinder
1 intake and ex-
haust camshaft lobes (arrows) face each other.
Do not rotate engine counterclockwise to reach the top dead
center position. Instead, complete another two complete ro-
Remove sealing plug from bore at bellhousing. Secure crank-
shaft in
TDC position with BMW special tool 11 2 300 (ar-
row).
- Remove cylinder head cover studs at rear of cylinder head.
< Place BMW special tool 11 3 240 over camshafts ends and
measure clearance of tool to cylinder head surface.
NOTE-
If the exhaust side of the tool (A) is not flush with the head,
adjust camshaft timing as described below.
Due to flexible sprocket design and VANOS control unit tol-
erances and play, the
intake side of special tool 11 3 240
(B) may be up to 1 mm (0.04 in) above the surface of the
cylinder head. This is normal. Reassemble engine. Other-
wise, adjust camshaft timing as described below.
- Remove double VANOS control unit. See VANOS control
unit, removing
(M52 TU and M54 engines).
< Press down on secondary chain tensionerand lock into place
using BMW special tool
11 3 292 or equivalent pin or drift.
Page 283 of 1002
![BMW 540i 2001 E39 Repair Manual Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain]
4 Pull out exhaust camshaft splined shaft to stop.
- Make sure camshafts are secured in TDC position using
BMW s BMW 540i 2001 E39 Repair Manual Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain]
4 Pull out exhaust camshaft splined shaft to stop.
- Make sure camshafts are secured in TDC position using
BMW s](/img/1/2822/w960_2822-282.png)
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain]
4 Pull out exhaust camshaft splined shaft to stop.
- Make sure camshafts are secured in TDC position using
BMW soecial tools 11 3 240 and 11 3 244.
4 Preload primary chain tensioning rail:
Tighten adjusting screw on
BMW special tool 11 4 220.
Tightening torque
Primary chain tensioner preload
0.7 Nm (6 in-lb)
4 Preload exhaust camshaft spring plate by pressing on im-
pulse wheel. Tighten mounting nuts
(arrows) by hand. Do
not tighten fully.
Page 285 of 1002

Downloaded from www.Manualslib.com manuals search engine
-- - -- - -- Camshaft Timing chain1
- Remove camshaft locking tools from rear of camshafts
- Remove BMW special tool 11 4 220 (adjustable primary
chain tensioner). Reinstall primary chain tensioner.
Tightening torque Primary chain tensioner to cylinder head
70
Nm (52 it-lb)
- Remove crankshaft locking tool from transmission bellhous-
ing. Reinstall sealing plug.
- Remove VANOS setup bracket from front of cylinder head
- lnstall VANOS control unit as described earlier in this group.
- Remove compressed air fitting (BMW special tool 11 3 450)
from VANOS control unit.
- Fit VANOS oil line banjo bolt with new seals. Attach oil line to
VANOS control unit.
Tightening torque
Oil line to VANOS control unit (banjo bolt) 32 Nm (24 H-lb)
- Remainder of installation is reverse of removal, noting the fol-
lowing:
lnstall spark plugs.
* lnstall intake camshaft plastic baffle prior to installing cylin-
der head cover. lnstall ignition coil packs and connect elec-
trical harness connectors.
Install radiator cooling fan.
- lnstall air filter housing and top engine cover.
Tightening torque Radiator cooling fan
(VISCOUS clutch) to 40 Nm (30 ft-lb)
coolant pump
Cyitnder head cover to cylinder head 10 Nm (89 in-lb)
Sparlc plug to cylinder head 25 Nm (18 ft-lb)
Page 286 of 1002

Downloaded from www.Manualslib.com manuals search engine
11 7-50
/Camshaft Timing Chain
Timing chains assembly
(M52 TU and M54 engines)
1. Impulse wheel mounting nut
2. Camshaft impulse wheel
(exh.)
3. Spring plate
4. Thrust spacer (T
= 3.5 mm)
5. Primary chain tensioner
6. Torx screw
7. Exhaust secondary sprocket
8. Splined shaft
9. Secondary timing chain
10. Splined sleeve
11. Primary sprocket
12. Threaded stud
13. Secondary chain tensioner
14. Sprocket mounting nut
15. Spring plate
16. Splined shaft
17. Intake camshaft sprocket
18. Secondary chain lower guide
19. Thrust spacer
20. Camshaft impulse wheel
(intake)
21. Chain tensioner rail
22. Crankshaft sprocket
23. Threaded stud
24. Primary chain
25. Threaded stud
26. Guide rail
27. Threaded stud
28. Woodruff key
Page 288 of 1002

Downloaded from www.Manualslib.com manuals search engine
11 7-52
Camshaft Timing Chain
Remove primary camshaft chain tensioner (arrow) from tim-
ing chain cover.
CAUTIOIG
Primary camshaft chain tensioning piston is under spring
pressure.
Press down on secondary chain tensionerand lock into place
using
BMW special tool 11 3 292 or a similar size wire.
Remove exhaust camshaft impulse wheel
rows). Remove impulse wheel (A).
4 Remove spring plate (A). mounting
nuts
(ar-