maintenance CHRYSLER VOYAGER 2001 Service Manual

CHRYSLER VOYAGER 2001 Service Manual VOYAGER 2001 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56872/w960_56872-0.png CHRYSLER VOYAGER 2001 Service Manual

Page 3377 of 4284

CHRYSLER VOYAGER 2001  Service Manual (2) Install andlightly tightenthe three remain-
ing wheel mounting nuts, securing the wheel cover in
place (Fig. 25).
(3) Tighten all five wheel mounting nuts in the
proper sequence (Fig. 28). Tighten

Page 3378 of 4284

CHRYSLER VOYAGER 2001  Service Manual INSTALLATION
(1) Install replacement wheel stud into flange of
hub and bearing assembly. Install washers on wheel
stud, then install a wheel mounting (lug) nut on stud
with flat side of lug nut agains

Page 3383 of 4284

CHRYSLER VOYAGER 2001  Service Manual When the conditions causing a water leak have
been determined, simulate the conditions as closely
as possible.
²If a leak occurs with the vehicle parked in a
steady light rain, flood the leak area wi

Page 3574 of 4284

CHRYSLER VOYAGER 2001  Service Manual (5) Install fuel filler housing to outer quarter
panel.
(6) Verify that all clips on fuel filler housing are
fully engaged to outer quarter panel.
(7) Engage fuel filler lockout link into clip on fuel

Page 3768 of 4284

CHRYSLER VOYAGER 2001  Service Manual VAPOR CANISTER
DESCRIPTION
There are 2 EVAP canisters on the vehicle. The vac-
uum and vapor tubes connect to the top of the canister.
It is a charcoal canister (Fig. 11) or (Fig. 12).
OPERATION
All v
Page:   < prev 1-10 ... 61-70 71-80 81-90 91-100 101-110