Timing CHRYSLER VOYAGER 2003 Workshop Manual

CHRYSLER VOYAGER 2003 Workshop Manual VOYAGER 2003 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56869/w960_56869-0.png CHRYSLER VOYAGER 2003 Workshop Manual

Page 1274 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual SPECIFICATIONS - TORQUE
DESCRIPTION N´mFt.
Lbs.In.
Lbs.
Camshaft SprocketÐBolt 54 40 Ð
Camshaft Thrust
PlateÐBolts12 Ð 105
Connecting Rod
CapÐBolts54 +
1¤4
turn40
+1¤4
turnÐ
Crankshaft Main B

Page 1294 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual CAMSHAFT & BEARINGS (IN
BLOCK)
DESCRIPTION
The nodular iron camshaft is mounted in the
engine block and supported with four steel backed
aluminum bearings (Fig. 48). A thrust plate, located
in front o

Page 1295 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual NOTE: When camshaft is replaced, all of the
hydraulic lifters must be replaced also.
(7) Install the hydraulic lifters (Refer to 9 -
ENGINE/ENGINE BLOCK/HYDRAULIC LIFTERS
(CAM IN BLOCK) - INSTALLATION

Page 1305 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual (5)Remove the oil pan and oil pick-up tube (Refer to
9 - ENGINE/LUBRICATION/OIL PAN - REMOVAL).
(6) Remove the timing chain cover (Refer to 9 -
ENGINE/VALVE TIMING/TIMING CHAIN COVER -
REMOVAL).
(7) R

Page 1306 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual (7) Position and install the connecting rod and
bearing caps on the crankshaft (Refer to 9 -
ENGINE/ENGINE BLOCK/CONNECTING ROD
BEARINGS - STANDARD PROCEDURE).
(8) Install the crankshaft rear oil seal

Page 1315 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual LUBRICATION
DESCRIPTION
The lubrication system is a full flow filtration pres-
sure feed type. The oil pump is mounted in the tim-
ing chain cover and is driven by the crankshaft
OPERATION
Oil from th

Page 1321 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual OIL PUMP
DESCRIPTION
The oil pump is located in the timing chain cover.
It is driven by the crankshaft.
REMOVAL
The oil pump is contained within the timing chain
cover housing (Fig. 105).
(1) Remove o

Page 1323 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual (3) Install cover and tighten screws to 12 N´m (105
in. lbs.).
(4) If removed, install the oil pressure relief valve.
(Refer to 9 - ENGINE/LUBRICATION/OIL PRES-
SURE RELIEF VALVE - INSTALLATION)
INST

Page 1332 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual VALVE TIMING
STANDARD PROCEDURE
STANDARD PROCEDURE - VALVE TIMING
VERIFICATION
(1) Remove front cylinder head cover and all 6
spark plugs.
(2) Rotate engine until the #2 piston is at TDC of
the compre

Page 1333 of 2177

CHRYSLER VOYAGER 2003 Workshop Manual (16) Remove camshaft position sensor from timing
chain cover (Fig. 136).
Fig. 133 OIL PICKUP TUBE
1 - BOLT
2 - OIL PICK-UP TUBE
3 - O-RING
Fig. 134 HEATER RETURN HOSE (Without Engine
Oil Cooler)
1 - C