Vacuum CHRYSLER VOYAGER 2004 Owner's Guide

CHRYSLER VOYAGER 2004 Owner's Guide VOYAGER 2004 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56870/w960_56870-0.png CHRYSLER VOYAGER 2004 Owner's Guide

Page 286 of 2585

CHRYSLER VOYAGER 2004 Owners Guide INSTALLATION
(1) Lubricate both ends of the torque shaft with
MS-4517 Lubricant or equivalent and install the
torque shaft from the left side reversing the removal
procedure. (2) Install the brake boo

Page 287 of 2585

CHRYSLER VOYAGER 2004 Owners Guide NOTE: The power brake booster assembly is not a
repairable component and must be replaced as a
complete assembly if found to be faulty in any way.
The check valve located on the power brake
booster fa

Page 288 of 2585

CHRYSLER VOYAGER 2004 Owners Guide (6) Apply light effort (approximately 15 lbs. of
force) to the brake pedal and hold the pedal steady.
Do not move the pedal once the pressure is applied
or the test results may vary. (7) Have an assis

Page 289 of 2585

CHRYSLER VOYAGER 2004 Owners Guide (16) Disconnect vacuum hose from check valve
located on vacuum booster. DO NOT REMOVE
CHECK VALVE FROM POWER BRAKE
BOOSTER. (17) Inside vehicle, remove silencer panel under
instrument panel below stee

Page 290 of 2585

CHRYSLER VOYAGER 2004 Owners Guide REMOVAL - RHD
CAUTION: Reserve vacuum in power brake booster
must be pumped down (removed) before removing
master cylinder from booster. This is necessary to
prevent booster from sucking in any contam

Page 291 of 2585

CHRYSLER VOYAGER 2004 Owners Guide (15) Under the instrument panel, remove booster
input rod trim cover. (16) Locate the booster input rod to brake pedal
torque shaft connection under the instrument panel.
Position a small screwdriver

Page 292 of 2585

CHRYSLER VOYAGER 2004 Owners Guide INSTALLATION
INSTALLATION - LHD
(1) Position power brake booster on dash panel
using the reverse procedure of its removal (Fig. 70).
It may be necessary to push in on booster input rod
as it is guided

Page 293 of 2585

CHRYSLER VOYAGER 2004 Owners Guide the mounting nuts to a torque of 14 N´m (124 in.
lbs.).(16) Install the battery tray. Install the two nuts
and one bolt attaching the battery tray to the vehicle.
Tighten the bolt and nuts to a torqu

Page 294 of 2585

CHRYSLER VOYAGER 2004 Owners Guide (11) Connect wiring harness connector to brake
fluid level switch in the master cylinder fluid reser-
voir (Fig. 71). (12) If the vehicle is equipped with the 2.5L diesel
engine, install the coolant r

Page 339 of 2585

CHRYSLER VOYAGER 2004 Owners Guide OPERATION
OPERATION - COOLING SYSTEM
The engine cooling systems primary purpose is to
maintain engine temperature in a range that will
provide satisfactory engine performance and emission
levels under