brake CHRYSLER VOYAGER 2005 Manual Online

CHRYSLER VOYAGER 2005 Manual Online VOYAGER 2005 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56868/w960_56868-0.png CHRYSLER VOYAGER 2005 Manual Online

Page 149 of 2339

CHRYSLER VOYAGER 2005 Manual Online (8) Disconnect primary and secondary brake tubes
from master cylinder housing (Fig. 50). Install seal-
ing plugs in the now open brake tube outlet ports.
CAUTION: Before removing the master cylinder
f

Page 150 of 2339

CHRYSLER VOYAGER 2005 Manual Online ASSEMBLY - MASTER CYLINDER (FLUID
RESERVOIR)
(1) Install new master cylinder housing to brake
fluid reservoir sealing grommets in master cylinder
housing (Fig. 52).
(2) Lubricate reservoir mounting ar

Page 151 of 2339

CHRYSLER VOYAGER 2005 Manual Online CAUTION: When tightening the primary and sec-
ondary brake tube nuts at master cylinder, be sure
brake tubes do not contact any other components
within the vehicle and that there is slack in the flex-

Page 152 of 2339

CHRYSLER VOYAGER 2005 Manual Online (12) Disconnect wiring harness connectors (as
equipped) from clockspring, multi-function switch,
SKIM module, ignition switch and BTSI solenoid.
(13) If equipped, disconnect PRNDL cable from
shift lev

Page 153 of 2339

CHRYSLER VOYAGER 2005 Manual Online (24) Unfasten routing clips retaining vehicle wir-
ing harness to pedal wiring harness (Fig. 58).
(25) Remove power brake booster input rod from
brake pedal pin by performing following:
(a) Position s

Page 154 of 2339

CHRYSLER VOYAGER 2005 Manual Online INSTALLATION
(1) Install adjustable pedals assembly under
instrument panel.
(2) Attach throttle cable to accelerator pedal using
cable retainer.
(3) Install two upper mounting bolts attaching
pedals a

Page 155 of 2339

CHRYSLER VOYAGER 2005 Manual Online PEDAL TORQUE SHAFT - RHD
REMOVAL
(1) Remove the instrument panel. (Refer to 23 -
BODY/INSTRUMENT PANEL/INSTRUMENT
PANEL ASSEMBLY - REMOVAL)
(2) Remove the HVAC housing. (Refer to 24 -
HEATING & AIR CO

Page 156 of 2339

CHRYSLER VOYAGER 2005 Manual Online (7) Connect the brake pedal link to the torque
shaft. Install a NEW retaining clip at the torque
shaft end of the brake pedal-to-torque shaft link.
(8) Install the HVAC housing. (Refer to 24 - HEAT-
I

Page 157 of 2339

CHRYSLER VOYAGER 2005 Manual Online OPERATION
The power brake booster reduces the amount of
force required by the driver to obtain the necessary
hydraulic pressure to stop a vehicle.
The power brake booster is vacuum operated. The
vacuu

Page 158 of 2339

CHRYSLER VOYAGER 2005 Manual Online (6) Remove screw securing engine coolant filler
tube to battery tray.
(7) If the vehicle is equipped with speed control,
disconnect the vacuum hose at the vacuum tank built
into the battery tray.
(8)