Downloaded from www.Manualslib.com manuals search engine 262
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1EP1EDC
Setting the timing (continued).
NOTE:If necessary, you can slightly rotate the pinions (10)and (7)anti-clockwise in order to engage the belt.
The angular displacement value of the belt in relation to the pinions should not be more than half a tooth.
Remove tool [5].
Act on the tensioner roller (8)by its square «a», using tool [6]to check that the camshaft and injection
pump pinions can turn freely.
Position the belt tension instrument [7]on the belt at «b».
Using tool [6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
106 ± 2 SEEMunits.
Tighten screws (9), (5) and (6).
Remove tools [7], [2], [3]and [4].
Rotate the crankshaft 8 times
in the normal direction of rotation.
Peg the flywheel, using tool [2].
Peg the camshaft hub, using tool [4].
Peg the injection pump hub, using tool [3].
Slacken screws (9), (5)and (6).
Position the belt tension instrument [7]on the belt at «b».
Using tool [6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
42 ± 2 SEEMunits.
B1EP1EFC
XSARA
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 262
Downloaded from www.Manualslib.com manuals search engine 268
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Reposition the timimg belt, belt at «a»well tensioned, in the following order:
- Fuel high pressure pump pulley (21).
- Guide roller (15).
- Crankshaft pinion (19).
- Coolant pump pinion (16).
- Tensioner roller (18).
Position tool [1]on the belt at «a».
Remove tools [4]and [9].
Turn the tensioner roller (18)anti-clockwise, using tool [2], to attain an overtension of:
98 ± 2 SEEMunits.
Tighten screw (17)of the tensioner roller to 2,5 ± 0,2 m.da N.
Lock the flywheel by means of tool [6].
Tighten the accessories drive pulley screw (8)to 7 ± 0,7 m.da N.
Remove tools [1], [3], [5]and [6].
Rotate the crankshaft eight times in the normal direction of rotation.
Peg:
- The crankshaft, using tool [3].
- The camshaft drive pulley, using tool [5].
B1EP1ABD
B1EP1ACC
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 268
Downloaded from www.Manualslib.com manuals search engine 277
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Refitting.
Rotate the crankshaft ten times
(in the direction of rotation of the engine).
Peg the crankshaft, using tool [2] and the camshaft drive pinion, using tool [3].
Lock the flywheel, using tool [6].
Slacken the screw (8)of the auxiliaries drive pulley (7) and the screw (12)of
the tensioner roller (17).
Turn the tensioner roller
(clockwise), using a hexagonal spanner at «e».
Position the index «d»opposite the notch «f».
Tighten:
- The screw (12)of the tensioner roller (17)to 2,1 ± 0,2 m.daN.
- The auxiliaries drive pulley to 7 ± 0,7 m.daN.
Remove tools [2], [3]and [6].
Rotate the crankshaft two times
(in the direction of rotation of the engine).
Refit tools [2]and [3].
Check the position of the index «d», it should be opposite the notch «f».
B1EP1FKC
B1EP1FLC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 277