ECU DODGE DURANGO 1997 1.G Workshop Manual

DODGE DURANGO 1997 1.G Workshop Manual DURANGO 1997 1.G DODGE DODGE https://www.carmanualsonline.info/img/12/5703/w960_5703-0.png DODGE DURANGO 1997 1.G Workshop Manual

Page 12 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine Otherwise the indicated compression pressures may
not be valid for diagnosis purposes.
(1) Clean the spark plug recesses with compressed
air.
(

Page 21 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine Fig. 13 Securing Timing Chain Tensioners Using Timing Chain Wedge
1 ± LEFT CYLINDER HEAD
2 ± RIGHT CYLINDER HEAD3 ± SPECIAL TOOL 8350 WEDGE

Page 32 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine ²Throttle Position (TPS) Switch
²Idle Air Control (IAC) Motor
²Engine Oil Pressure Switch
²Engine Coolant Temperature (ECT) Sensor
²Manifo

Page 56 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine INSTALLATION
(1) Thoroughly clean the idler shaft bore.
(2) Position the idler shaft in the bore.
NOTE: The two lubrication holes in the idler

Page 57 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine (9) Remove the camshaft bearing caps and the
camshaft.INSTALLATION
(1) Lubricate camshaft journals with clean engine
oil.
NOTE: Position the le

Page 59 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine (2) Set engine to TDC cylinder #1, camshaft
sprocket V8 marks at the 12 oclock position.
(3) Mark one link on the secondary timing chain
on bo

Page 60 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine Fig. 97 Securing Timing Chain Tensioners Using Timing Chain Wedge
1 ± LEFT CYLINDER HEAD
2 ± RIGHT CYLINDER HEAD3 ± SPECIAL TOOL 8350 WEDGE

Page 106 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine (2) Install new bolt and washer assemblies in the
remaining holes (Fig. 42). Start at the center arm
and work outward. Tighten the bolts and nu

Page 107 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine (2) Position the cylinder head cover onto the gas-
ket. Tighten the bolts to 11 N´m (95 in. lbs.) torque.
(3) Install closed crankcase ventila

Page 147 of 193

DODGE DURANGO 1997 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine Ensure the battery is completely charged and the
engine starter motor is in good operating condition.
Otherwise, the indicated compression pres
Page:   1-10 11-20 next >