Engine Installation DODGE RAM 1500 1998 2.G Workshop Manual

DODGE RAM 1500 1998 2.G Workshop Manual RAM 1500 1998 2.G DODGE DODGE https://www.carmanualsonline.info/img/12/5702/w960_5702-0.png DODGE RAM 1500 1998 2.G Workshop Manual

Page 2037 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual o-ring is properly installed and is free of any debris.
The hub must be smooth to avoid damaging pump
seal at installation.
(2) If a replacement transmission is being
installed, transfer any component

Page 2039 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (22) Install torque converter-to-driveplate bolts.
Tighten bolts to 31 N´m (270 in. lbs.).
(23) Install starter motor and cooler line bracket.
(24) Connect cooler lines to transmission.
(25) Install

Page 2071 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (11) Remove and discard the oil filter seal from the
bottom of the oil pump.
(12) If replacing the cooler return filter, use Oil
Filter Wrench 8321 to remove the filter from the
transmission.
(13) Dis

Page 2073 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
(1) Route the transmission end of the gearshift
cable through the opening in the dash panel (Fig.
72).
(2) Seat the cable grommet into the dash panel
opening.
(3) Snap the cable into the

Page 2085 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (28) Install the number 2 bearing onto the under-
drive hub with outer race against the hub with petro-
leum jelly.
(29) Install the underdrive hub into the input
clutch retainer.
(30) Install the num

Page 2086 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual feedback loop to the TCM. The TCM uses this infor-
mation to adjust its control of the pressure control
solenoid to achieve the desired line pressure.
OPERATION
The TCM calculates the desired line pre

Page 2094 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual into the appropriate oil pump valve body bore (Fig.
102) (Fig. 103).
(4) Place the separator plate onto the oil pump
body (Fig. 101).
(5) Install the screws to hold the separator plate
onto the oil pu

Page 2107 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual control switch is in the OFF position, the clutch will
engage after the shift to third gear.
The TCM controls the torque converter by way of
internal logic software. The programming of the soft-
ware

Page 2111 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
(1) Place TRS selector plate in the PARK position.
(2) Position the transmission solenoid/TRS assem-
bly onto the valve body. Be sure that both alignment
dowels are fully seated in the va

Page 2118 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual TRANSFER CASE - NV241 GENII
TABLE OF CONTENTS
page page
TRANSFER CASE - NV241 GENII
DESCRIPTION........................415
OPERATION..........................415
DIAGNOSIS AND TESTING - TRANSFER
CASE