lock DODGE RAM 1500 1998 2.G Workshop Manual

DODGE RAM 1500 1998 2.G Workshop Manual RAM 1500 1998 2.G DODGE DODGE https://www.carmanualsonline.info/img/12/5702/w960_5702-0.png DODGE RAM 1500 1998 2.G Workshop Manual

Page 1721 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual OUTPUT SHAFT
NOTE: Lubricate shaft, gears, bearings and
immerse each synchro ring with recommended
lubricant during assembly. Petroleum jelly can be
used to hold parts in place.
(1) Install reverse ge

Page 1722 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (5) Installnewfifth-reverse hub snap ring (Fig.
54). Verify snap ring is seated in the groove.
(6) Install fifth gear synchro ring in synchro hub
and sleeve (Fig. 55).(7) Install fifth gear bearing. S

Page 1723 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (9) Invert output shaft and set the shaft in Collar
6310-1 so fifth gear is seated on the tool (Fig. 58).
(10) Install first gear bearing on output shaft (Fig.
58). Verify bearing is seated on shaft s

Page 1727 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (28) Press 3-4 synchro assembly onto output shaft
with shop press and suitable size pipe (Fig. 74).
NOTE: Tool presses on hub must be as close to
output shaft as possible but not contacting the
shaft

Page 1728 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual Fig. 77 SYNCHRO SLEEVE LOCATIONS
1 - DOUBLE GROOVE FORWARD
2 - GROOVE FORWARD
3 - FIRST GEAR SIDE MARKING TOWARD FIRST GEAR
4 - TAPER FORWARD5 - GROOVE FORWARD
6 - 5TH-REV SYNCHRO SLEEVE
7 - 1-2 SYNCH

Page 1729 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (8) Install front thrust washer on shaft and slide
washer up against gear and over lock ball (Fig. 80).
(9) Install wave washer, flat washer and remain-
ing snap ring on idler shaft (Fig. 80). Verify

Page 1736 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (4) Assemble shift shaft shift lever and bushing
(Fig. 102). Verify slot in bushing is facing up and roll
pin hole for lever is aligned with hole in shaft.
(5) Install assembled lever and bushing on s

Page 1737 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (9) Select correctnewroll pin for shift shaft lever
(Fig. 106). Shaft lever roll pin is approximately 22
mm (7/8 in.) long. Shift socket roll pin is approxi-
mately 33 mm (1-1/4 in.) long.
(10) Align

Page 1740 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (12) Install shift shaft bushing lock bolt (Fig. 117).
Apply Mopar Gasket Maker or equivalent to bolt
threads, shank and underside of bolt head before
installation.
CAUTION: If lock bolt cannot be ful

Page 1742 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
NOTE: If a new transmission is being installed, use
all components supplied with the new transmission.
For example, if a new shift tower is supplied, do not
re-use the original shift towe