mirror DODGE RAM 2002 Service Workshop Manual
[x] Cancel search | Manufacturer: DODGE, Model Year: 2002, Model line: RAM, Model: DODGE RAM 2002Pages: 2255, PDF Size: 62.07 MB
Page 2094 of 2255

(3) Sand the surface on the support bracket with
fine grit-sandpaper. Wipe the bracket surface clean
with a paper towel.
(4) Apply accelerator to the surface on the bracket
according to the following instructions:
(a) Crush the vial to saturate the felt applicator.
(b) Remove the paper sleeve.
(c) Apply accelerator to the contact surface on
the bracket.
(d) Allow the accelerator to dry for five minutes.
(e) Do not touch the bracket contact surface
after the accelerator has been applied.
(5) Apply adhesive accelerator to the bracket con-
tact surface on the windshield glass. Allow the accel-
erator to dry for one minute. Do not touch the glass
contact surface after the accelerator has been
applied.
(6) Install the bracket according to the following
instructions:
(a) Apply one drop of adhesive at the center of
the bracket contact-surface on the windshield
glass.
(b) Apply an even coat of adhesive to the contact
surface on the bracket.
(c) Align the bracket with the marked position
on the windshield glass.
(d) Press and hold the bracket in place for at
least one minute.
NOTE: Verify that the mirror support bracket is cor-
rectly aligned, because the adhesive will cure rap-
idly.
(7) Allow the adhesive to cure for 8-10 minutes.
Remove any excess adhesive with an alcohol-damp-
ened cloth.
(8) Allow the adhesive to cure for an additional
8-10 minutes before installing the mirror.SUN VISOR
REMOVAL
(1) Remove screws attaching sunvisor to roof (Fig.
19).
(2) If equipped, disengage lighted vanity mirror
connector.
(3) Separate sunvisor from roof.
(4) Remove screw attaching sun visor hook to roof.
(5) Separate sunvisor hook from roof.
INSTALLATION
(1) Position sunvisor hook on roof.
(2) Install screw attaching sunvisor hook to roof.
(3) Position sunvisor on roof.
(4) If equipped, engage lighted vanity mirror con-
nector.
(5) Install screws attaching sunvisor to roof (Fig.
19).
Fig. 19 Sunvisor
1 - BODY
2 - CLIP
3 - SUNVISOR
BR/BEINTERIOR 23 - 127
REAR VIEW MIRROR (Continued)
Page 2114 of 2255

(7) Latch vent glass panels
(8) Insert upper ends of vent glass panels into
upper run channel.
NOTE: Aggressive clamp pressure is required to
lock lower run channel into place.
(9) Position lower run channel on backlite frame
lower rail and roll lower run channel onto backlite
frame rail.
(10) Fill the ends of the run channel with Mopar
GEN II Silicone Rubber Adhesive Sealant or equiva-
lent.
(11) Verify window and latch/keeper operation.(12) Install rear closure panel trim. (Refer to 23 -
BODY/INTERIOR/REAR CLOSURE PANEL TRIM -
INSTALLATION).
WINDSHIELD
DESCRIPTION
The windshield is attached to the window frame
with urethane adhesive. The urethane adhesive is
applied cold and seals the surface area between the
window opening and the glass. The primer adheres
the urethane adhesive to the windshield.
It is difficult to salvage a windshield during the
removal operation. The windshield is part of the struc-
tural support for the roof. The urethane bonding used to
secure the windshield to the fence is difficult to cut or
clean from any surface. If the moldings are set in ure-
thane, it would also be unlikely they could be salvaged.
Before removing the windshield, check the availability
of the windshield and moldings from the parts supplier.
REMOVAL
(1)Remove inside rear view mirror. (Refer to 23 -
BODY/INTERIOR/REAR VIEW MIRROR - REMOVAL).
(2) Remove cowl grill. (Refer to 23 - BODY/EXTE-
RIOR/COWL GRILLE - REMOVAL).
(3) With doors open, remove windshield molding
(Fig. 7). Pull outward on molding beginning at the
bottom of A-pillars using pliers.
(4) Cut urethane bonding from around windshield
using a suitable sharp cold knife (C-4849). A pneu-
matic cutting device can be used but is not recom-
mended (Fig. 8).
(5) Separate windshield from vehicle.
Fig. 4 Lower Run Channel
1 - SLIDING BACKLITE
2 - LOWER RUN CHANNEL
3 - CAB BACK PANEL
Fig. 5 Lower Run Channel Removal
1 - LATCH/KEEPER
2 - BACK LITE
3 - LOWER RUN CHANNEL
4 - SLIDE OUTWARD
Fig. 6 Glass Panel Installation
1 - INSERT A 0.5mm DIA. BEAD OF PUMPABLE GRADE BUTYL
ALONG THE ENTIRE LENGTH OF THE LOWER RUN WINDOW
CHANNEL
BR/BESTATIONARY GLASS 23 - 147
BACKLITE VENT GLASS (Continued)
Page 2116 of 2255

(14) Clean excess urethane from exterior with
MOPARtSuper Clean or equivalent.
(15) Apply 150 mm (6 in.) lengths of 50 mm (2 in.)
masking tape spaced 250 mm (10 in.) apart to hold
molding in place until urethane cures.
(16) Install cowl grill. (Refer to 23 - BODY/EXTE-
RIOR/COWL GRILLE - INSTALLATION).
(17) Install rear view mirror support bracket.
(Refer to 23 - BODY/INTERIOR/REAR VIEW MIR-
ROR - INSTALLATION).
(18)
Install rear view mirror. (Refer to 23 - BODY/IN-
TERIOR/REAR VIEW MIRROR - INSTALLATION).
(19) After urethane has cured, remove tape strips
and water test windshield to verify repair.
Fig. 9 Center Windshield and Mark at Support
1 - WINDSHIELD
2 - INDEX MARKS
3 - SUPPORT SPACERS
Fig. 10 Work Surface Set up
1 - WINDSHIELD AND MOULDINGS
2 - URETHANE BEAD AROUND GLASS 7mm (.3 in.) FROM
EDGE
3 - BLOCKS
Fig. 11 Position Urethane Compression Spacer
1 - URETHANE COMPRESSION SPACER
2 - FENCE
Fig. 12 Applicator Tip
1 - APPLICATOR TIP
Fig. 13 Lower Windshield Into Position
1 - COMPRESSION SPACER
2 - WINDSHIELD
3 - ADJUSTABLE SUPPORT SPACERS
BR/BESTATIONARY GLASS 23 - 149
WINDSHIELD (Continued)
Page 2120 of 2255

INSTALLATION
(1) Press door glass run weatherstrip into channel
around window opening (Fig. 4).
(2) Install inner door belt weatherstrip. (Refer to
23 - BODY/WEATHERSTRIP/SEALS/FDR INNER
BELT WEATHERSTRIP - INSTALLATION)
FRONT DOOR INNER BELT
WEATHERSTRIP
REMOVAL
(1) Remove door trim panel. (Refer to 23 - BODY/
DOOR - FRONT/TRIM PANEL - REMOVAL)
(2) Lift inner door belt weatherstrip upward (Fig.
5).
(3) Separate inner door belt weatherstrip from
door.
INSTALLATION
(1) Position inner door belt weatherstrip on door.
(2) Press inner door belt weatherstrip downward
to seat.
(3) Install door trim panel. (Refer to 23 - BODY/
DOOR - FRONT/TRIM PANEL - INSTALLATION)
FRONT DOOR OUTER BELT
WEATHERSTRIP
REMOVAL
(1) Roll door glass down.
(2) Remove mirror. (Refer to 23 - BODY/EXTERI-
OR/SIDE VIEW MIRROR - REMOVAL)
(3) Using a hook tool inserted into the end of the
belt weatherstrip, lift upward.(4) Separate outer door belt weatherstrip from
door (Fig. 6).
INSTALLATION
(1) Position outer door belt weatherstrip on door.
(2) Press weatherstrip downward to seat.
(3) Install mirror. (Refer to 23 - BODY/EXTERI-
OR/SIDE VIEW MIRROR - INSTALLATION)
FRONT DOOR UPPER CORNER
SEAL
REMOVAL
(1) Remove the push-in fasteners attaching the
upper corner seal to the front door (Fig. 7).
(2) Separate the upper corner seal from the door.Fig. 5 Inner Door Belt Weatherstrip
1 - DOOR
2 - INNER BELTLINE WEATHERSEAL
Fig. 6 Outer Door Belt Weatherstrip
1 - OUTER BELTLINE WATHERSTRIP
2 - DOOR
Fig. 7 Upper Corner SealÐQuad Cab
1 - UPPER CORNER SEAL
2 - PUSHÐIN FASTENER
BR/BEWEATHERSTRIP/SEALS 23 - 153
FRONT DOOR GLASS RUN WEATHERSTRIP (Continued)
Page 2139 of 2255

(1) The relay common feed terminal cavity (30) is
connected to fused battery feed. There should be bat-
tery voltage at the cavity for relay terminal 30 at all
times. If OK, go to Step 2. If not OK, repair the open
circuit to the fuse in the PDC as required.
(2) The relay normally closed terminal (87A) is not
used in this application. Go to Step 3.
(3) The relay normally open terminal cavity (87) is
connected to the compressor clutch coil. There should
be continuity between this cavity and the A/C com-
pressor clutch relay output circuit cavity of the com-
pressor clutch coil wire harness connector. If OK, go
to Step 4. If not OK, repair the open circuit as
required.
(4) The relay coil battery terminal (86) is con-
nected to the fused ignition switch output (run/start)
circuit. There should be battery voltage at the cavity
for relay terminal 86 with the ignition switch in the
On position. If OK, go to Step 5. If not OK, repair the
open circuit to the fuse in the junction block as
required.
(5) The coil ground terminal cavity (85) is switched
to ground through the Powertrain Control Module
(PCM). There should be continuity between this cav-
ity and the A/C compressor clutch relay control cir-
cuit cavity of the PCM wire harness connector C
(gray) at all times. If not OK, repair the open circuit
as required.
REMOVAL
(1) Disconnect and isolate the battery negative
cable.
(2) Remove the cover from the Power Distribution
Center (PDC) (Fig. 17).
(3) Refer to the label on the PDC for compressor
clutch relay identification and location.(4) Unplug the compressor clutch relay from the
PDC and remove it.
INSTALLATION
(1) Install the compressor clutch relay by aligning
the relay terminals with the cavities in the PDC and
pushing the relay firmly into place.
(2) Install the PDC cover.
(3) Connect the battery negative cable.
(4) Test the relay operation.
A/C-HEATER CONTROL
DESCRIPTION
Both the heater-only and a/c heater systems use a
combination of electrical and vacuum controls. These
controls provide the vehicle operator with a number
of setting options to help control the climate and
comfort within the vehicle. Refer to the owner's man-
ual in the vehicle glove box for more information on
the features, use, and suggested operation of these
controls.
OPERATION
The heater-only or a/c heater control panel is
located to the right of the instrument cluster on the
instrument panel. The control panel contains a rota-
ry-type temperature control knob, a rotary-type mode
control switch knob, and a rotary-type blower motor
speed switch knob. On models with the optional
heated mirror system, a momentary push button
switch and indicator lamp are located near the bot-
tom of the a/c heater control panel. Refer to Heated
Mirrors for more information on this feature.
The heater-only or a/c heater control panel cannot
be repaired. If faulty or damaged, the entire unit
must be replaced. The control knobs and the illumi-
nation lamps are available for service replacement.
DIAGNOSIS AND TESTING - A/C HEATER
CONTROL
Satisfactory heater and air conditioner perfor-
mance depends upon proper operation and adjust-
ment of all operating controls and refrigeration
system components. For circuit descriptions and dia-
grams, (Refer to Appropriate Wiring Information).
These inspections, tests, and adjustments should be
used to locate the cause of a malfunction.
Operation must be tested as described in the fol-
lowing sequence:
(1) Inspect and adjust the serpentine drive bel-
t(Refer to 7 - COOLING/ACCESSORY DRIVE/DRIVE
BELTS - DIAGNOSIS AND TESTING).
(2) Start the engine and hold the idle speed at
1,300 rpm.
Fig. 17 POWER DISTRIBUTION CENTER
1 - COVER
2 - POWER DISTRIBUTION CENTER
24 - 18 CONTROLSBR/BE
A/C COMPRESSOR CLUTCH RELAY (Continued)
Page 2140 of 2255

(3) On vehicles with air conditioning, turn the
temperature control knob to the extreme counter
clockwise (Cool) position, and set the mode control
switch knob to the Bi-Level (A/C) position. The out-
side (recirculation) air door should be open to outside
air. If not OK, (Refer to 24 - HEATING & AIR CON-
DITIONING/CONTROLS - DIAGNOSIS AND TEST-
ING - VACUUM SYSTEM).
(4) Open the vehicle windows. Test the blower
motor operation in all speeds. If not OK, (Refer to 24
- HEATING & AIR CONDITIONING/DISTRIBU-
TION/BLOWER MOTOR - DIAGNOSIS AND TEST-
ING).
(5) On vehicles with air conditioning, the compres-
sor should be running and the air conditioning sys-
tem in operation unless the ambient air temperature
is below about -1É C (30É F). If not OK, (Refer to 24 -
HEATING & AIR CONDITIONING - DIAGNOSIS
AND TESTING - A/C PERFORMANCE).
(6) Check the mode control switch operation. The
heater and air conditioner systems should respond as
described in the owner's manual in the vehicle glove
box to each mode selected. Reduce the engine speed
to normal idle. The vacuum will be high at low idle
and the vacuum actuators should respond quickly. If
not OK, (Refer to 24 - HEATING & AIR CONDI-
TIONING/CONTROLS - DIAGNOSIS AND TEST-
ING - VACUUM SYSTEM).
(7) If the vacuum tests, and the electrical compo-
nent and circuit tests reveal no problems, disassem-
ble the HVAC housing to inspect for mechanical
misalignment or binding of the mode doors (Refer to
24 - HEATING & AIR CONDITIONING/DISTRIBU-
TION/HVAC HOUSING - DISASSEMBLY)
REMOVAL
WARNING: ON VEHICLES EQUIPPED WITH AIR-
BAGS, DISABLE THE AIRBAG SYSTEM BEFORE
ATTEMPTING ANY STEERING WHEEL, STEERING
COLUMN, OR INSTRUMENT PANEL COMPONENT
DIAGNOSIS OR SERVICE. DISCONNECT AND ISO-
LATE THE BATTERY NEGATIVE (GROUND) CABLE,
THEN WAIT TWO MINUTES FOR THE AIRBAG SYS-
TEM CAPACITOR TO DISCHARGE BEFORE PER-
FORMING FURTHER DIAGNOSIS OR SERVICE. THIS
IS THE ONLY SURE WAY TO DISABLE THE AIRBAG
SYSTEM. FAILURE TO TAKE THE PROPER PRE-
CAUTIONS COULD RESULT IN AN ACCIDENTAL
AIRBAG DEPLOYMENT AND POSSIBLE PERSONAL
INJURY.
(1) Disconnect and isolate the battery negative
cable.
(2) Reach under the instrument panel near the
driver side of the floor panel transmission tunnel andunplug the a/c heater control to HVAC housing vac-
uum harness connector.
(3) While still reaching under the instrument
panel, disengage the retainer on the a/c heater con-
trol half of the vacuum harness from the hole in the
center distribution duct (Fig. 18).
(4) Remove the cluster bezel from the instrument
panel(Refer to 23 - BODY/INSTRUMENT PANEL/
CLUSTER BEZEL - REMOVAL).
(5) Remove the four screws that secure the a/c
heater control to the instrument panel (Fig. 19).
(6) Pull the a/c heater control assembly away from
the instrument panel far enough to access the con-
nections on the back of the control.
(7) Unplug the wire harness connector from the
back of the a/c heater control.
(8) On vehicles with heated mirrors, unplug the
heated mirror wire harness connector from the back
of the a/c heater control.
(9) Remove the a/c heater control from the instru-
ment panel.
INSTALLATION
(1) Plug the wire harness connector(s) into the
receptacle(s) on the back of the a/c heater control.
(2) Route the HVAC vacuum harness through the
hole in the reinforcement below the a/c heater control
opening of the instrument panel.
(3) Position the a/c heater control in the instru-
ment panel and secure it with four screws. Tighten
the screws to 2.2 N´m (20 in. lbs.).
Fig. 18 A/C HEATER CONTROL VACUUM HARNESS
ROUTING
1 - A/C HEATER CONTROL VACUUM HARNESS
2 - REINFORCEMENT
3 - RETAINER
4 - CENTER DISTRIBUTION DUCT
BR/BECONTROLS 24 - 19
A/C-HEATER CONTROL (Continued)
Page 2141 of 2255

(4) Reinstall the cluster bezel to the instrument
panel(Refer to 23 - BODY/INSTRUMENT PANEL/
CLUSTER BEZEL - INSTALLATION).
(5) Reach under the instrument panel to reinstall
the a/c heater control vacuum harness retainer to the
side of the center distribution duct.
(6) Plug in the two halves of the a/c heater control
to HVAC housing vacuum harness connector.
(7) Connect the battery negative cable.
A/C HIGH PRESSURE SWITCH
DESCRIPTION
The a/c high pressure switch is located on the dis-
charge line near the compressor. The switch is
screwed onto a fitting that contains a Schrader-type
valve, which allows the switch to be serviced without
discharging the refrigerant system. The discharge
line fitting is equipped with an O-ring to seal the
switch connection.
OPERATION
The a/c high pressure switch is connected in series
electrically with the a/c low pressure switch between
ground and the Powertrain Control Module (PCM).
The switch contacts open and close causing the PCM
to turn the compressor clutch on and off. This pre-
vents compressor operation when the discharge line
pressure approaches high levels.
The a/c high pressure switch contacts are open
when the discharge line pressure rises above about3100 to 3375 kPa (450 to 490 psi). The switch con-
tacts will close when the discharge line pressure
drops to about 1860 to 2275 kPa (270 to 330 psi).
When checking refrigerant system pressures with a
manifold gauge set, keep in mind that the indicated
pressures will be about 172 kpa (25 psi) below the
actual switch pressure values due to the pressure
drop that occurs in the refrigerant system between
the switch and the high pressure service port.
The a/c high pressure switch is a factory-calibrated
unit. The switch cannot be adjusted or repaired and,
if faulty or damaged, it must be replaced.
DIAGNOSIS AND TESTING - A/C HIGH
PRESSURE SWITCH
Before performing diagnosis of the a/c high pres-
sure switch, verify that the refrigerant system has
the correct refrigerant charge. (Refer to 24 - HEAT-
ING & AIR CONDITIONING - DIAGNOSIS AND
TESTING)
For circuit descriptions and diagrams, (Refer to
Appropriate Wiring Information).
(1) Disconnect and isolate the battery negative
cable.
(2) Unplug the a/c high pressure switch wire har-
ness connector from the switch on the refrigerant
system fitting.
(3) On the four terminal high pressure switch,
check for continuity between terminals C and D. On
the two terminal switch, check for continuity
between both terminals of the a/c high pressure
switch. There should be continuity. If OK, test and
repair the A/C switch sense circuit as required. If not
OK, replace the faulty switch.
REMOVAL
(1) Disconnect and isolate the battery negative
cable.
(2) Unplug the wire harness connector from the a/c
high pressure switch, which is mounted to a fitting
on the discharge line between the compressor and
the condenser inlet.
(3) Unscrew the a/c high pressure switch from the
discharge line fitting.
(4) Remove the a/c high pressure switch from the
vehicle.
(5) Remove the O-ring seal from the discharge line
fitting and discard.
INSTALLATION
(1) Lubricate a new O-ring seal with clean refrig-
erant oil and install it on the discharge line fitting.
Use only the specified O-rings as they are made of a
special material for the R-134a system. Use only
refrigerant oil of the type recommended for the com-
pressor in the vehicle. (Refer to 24 - HEATING &
Fig. 19 A/C HEATER CONTROL REMOVE/INSTALL
1 - HEATED MIRROR WIRE HARNESS CONNECTOR
2 - WIRE HARNESS CONNECTOR
3 - SCREW
4 - HEATER-A/C CONTROL
24 - 20 CONTROLSBR/BE
A/C-HEATER CONTROL (Continued)
Page 2219 of 2255

AIR LEAK VACUUM TEST - DIAGNOSIS
AND TESTING, FUEL SYSTEM...........14-57
AIR PUMP FILTER - INSTALLATION......25-30
AIR PUMP FILTER - REMOVAL..........25-30
AIR TESTING TRANSMISSION CLUTCH
AND BAND OPERATION - DIAGNOSIS
AND TESTING................21-100,21-272
AIR TO OIL COOLER - INSTALLATION.....7-87
AIR TO OIL COOLER - REMOVAL.........7-86
AIRBAG - ASSEMBLY, DRIVER..........8O-16
AIRBAG - DESCRIPTION, DRIVER........8O-14
AIRBAG - DESCRIPTION, PASSENGER....8O-21
AIRBAG - DISASSEMBLY, DRIVER.......8O-15
AIRBAG - INSTALLATION, DRIVER.......8O-17
AIRBAG - INSTALLATION, PASSENGER . . . 8O-23
AIRBAG - OPERATION, DRIVER.........8O-14
AIRBAG - OPERATION, PASSENGER......8O-21
AIRBAG - REMOVAL, DRIVER...........8O-14
AIRBAG - REMOVAL, PASSENGER.......8O-21
AIRBAG CONTROL MODULE -
DESCRIPTION........................8O-6
AIRBAG CONTROL MODULE -
INSTALLATION.......................8O-8
AIRBAG CONTROL MODULE -
OPERATION..........................8O-6
AIRBAG CONTROL MODULE - REMOVAL . . . 8O-7
AIRBAG DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER AN........8O-4
AIRBAG INDICATOR - DESCRIPTION.......8J-15
AIRBAG INDICATOR - OPERATION.......8J-15
AIRBAG ON/OFF SWITCH -
DESCRIPTION, PASSENGER............8O-23
AIRBAG ON/OFF SWITCH -
INSTALLATION, PASSENGER...........8O-25
AIRBAG ON/OFF SWITCH - OPERATION,
PASSENGER........................8O-24
AIRBAG ON/OFF SWITCH - REMOVAL,
PASSENGER........................8O-24
AIRBAG SYSTEM - DIAGNOSIS AND
TESTING............................8O-4
AIRBAG SYSTEM - SPECIAL TOOLS.......8O-6
AIRBAGS - STANDARD PROCEDURE,
HANDLING NON-DEPLOYED.............8O-4
AIRFLOW - DESCRIPTION, HVAC
SYSTEM............................24-30
AJAR SWITCH - DESCRIPTION, DOOR....8L-34
AJAR SWITCH - DIAGNOSIS AND
TESTING, DOOR.....................8L-34
AJAR SWITCH - INSTALLATION, DOOR . . . 8L-35
AJAR SWITCH - REMOVAL, DOOR.......8L-35
ALIGNMENT - DESCRIPTION, WHEEL.......2-1
ALIGNMENT - OPERATION, WHEEL........2-2
ALIGNMENT I.F.S. - STANDARD
PROCEDURES.........................2-3
ALIGNMENT LINK/COIL SUSPENSION -
STANDARD PROCEDURE.................2-5
ALIGNMENT, SPECIAL TOOLS -
HEADLAMP..........................8L-4
ALIGNMENT, SPECIFICATIONS............2-6
ALUMINUM THREAD REPAIR -
STANDARD PROCEDURE........21-114,21-286
AMBIENT TEMP SENSOR - DESCRIPTION . 8M-12
AMBIENT TEMP SENSOR -
INSTALLATION......................8M-13
AMBIENT TEMP SENSOR - OPERATION . . 8M-12
AMBIENT TEMP SENSOR - REMOVAL
....8M-12
AMBIENT TEMPERATURE SENSOR -
DIAGNOSIS AND TESTING
.............8M-12
AMPERAGE TEST - DIAGNOSIS AND
TESTING, FUEL PUMP
.................14-10
ANTENNA - DIAGNOSIS AND TESTING
.....8A-5
ANTENNA BODY & CABLE -
DESCRIPTION
........................8A-4
ANTENNA BODY & CABLE -
INSTALLATION
.......................8A-6
ANTENNA BODY & CABLE - OPERATION
. . . 8A-4
ANTENNA BODY & CABLE - REMOVAL
.....8A-6
ANTENNA CABLE - INSTALLATION,
INSTRUMENT PANEL
..................8A-9
ANTENNA CABLE - REMOVAL,
INSTRUMENT PANEL
..................8A-9
ANTILOCK BRAKE - DESCRIPTION,
CONTROLLER
.......................8E-11
ANTILOCK BRAKE - INSTALLATION,
CONTROLLER
.......................8E-12
ANTILOCK BRAKE - OPERATION,
CONTROLLER
.......................8E-11ANTILOCK BRAKE - REMOVAL,
CONTROLLER.......................8E-11
ANTILOCK BRAKES - DIAGNOSIS AND
TESTING............................5-36
A-PILLAR GRAB HANDLE -
INSTALLATION......................23-119
A-PILLAR GRAB HANDLE - REMOVAL . . . 23-119
A-PILLAR TRIM - INSTALLATION.......23-119
A-PILLAR TRIM - REMOVAL...........23-119
A-PILLAR TWEETER SPEAKER -
INSTALLATION.......................8A-19
A-PILLAR TWEETER SPEAKER -
REMOVAL..........................8A-18
APPLICATION TABLE, SPECIFICATIONS -
A/C ................................24-7
APPLIQUE - INSTALLATION........23-63,23-68
APPLIQUE - REMOVAL...........23-63,23-68
ARM / ADJUSTER ASSEMBLY -
INSTALLATION, ROCKER................9-26
ARM / ADJUSTER ASSEMBLY -
REMOVAL, ROCKER...................9-26
ARM / ADJUSTER ASSY - CLEANING,
ROCKER............................9-146
ARM / ADJUSTER ASSY - DESCRIPTION,
ROCKER............................9-145
ARM / ADJUSTER ASSY - INSPECTION,
ROCKER............................9-146
ARM / ADJUSTER ASSY -
INSTALLATION, ROCKER...........9-148,9-84
ARM / ADJUSTER ASSY - REMOVAL,
ROCKER.......................9-145,9-84
ARM - DESCRIPTION, WIPER............8R-11
ARM - INSTALLATION, LOWER
CONTROL.......................2-10,2-20
ARM - INSTALLATION, UPPER
CONTROL.......................2-13,2-19
ARM - INSTALLATION, WIPER..........8R-12
ARM - OPERATION, WIPER............8R-11
ARM - REMOVAL, LOWER CONTROL . . 2-10,2-20
ARM - REMOVAL, UPPER CONTROL . . 2-13,2-19
ARM - REMOVAL, WIPER..............8R-12
ARMREST/CONSOLE - INSTALLATION,
CENTER SEAT......................23-132
ARMREST/CONSOLE - REMOVAL,
CENTER SEAT......................23-132
ARMREST/LATCH COVER -
INSTALLATION, CENTER SEAT.........23-132
ARMREST/LATCH COVER - REMOVAL,
CENTER SEAT......................23-132
ASD AND FUEL PUMP RELAYS -
DIAGNOSIS AND TESTING...............8I-4
ASD SENSE - PCM INPUT - OPERATION....8I-4
ASH RECEIVER - INSTALLATION........23-107
ASH RECEIVER - REMOVAL...........23-107
ASSEMBLY - INSTALLATION,
INSTRUMENT PANEL.................23-117
ASSEMBLY - INSTALLATION, ROCKER
ARM / ADJUSTER.....................9-26
ASSEMBLY - OVERHEAD CONSOLE
ASSEMBLY..........................8M-8
ASSEMBLY - REMOVAL, INSTRUMENT
PANEL............................23-115
ASSEMBLY - REMOVAL, ROCKER ARM /
ADJUSTER...........................9-26
ASSEMBLY, ASSEMBLY - OVERHEAD
CONSOLE...........................8M-8
ASSEMBLY, AXLE VACUUM MOTOR.......3-34
ASSEMBLY, DIAGNOSIS AND
TESTING....................21-122,21-294
ASSEMBLY, DIFFERENTIAL . 3-126,3-38,3-66,3-97
ASSEMBLY, DIFFERENTIAL - POWR-LOK . . . 3-99
ASSEMBLY, DIFFERENTIAL -
TRAC-LOK......................3-129,3-70
ASSEMBLY, DOUBLE CARDAN
UNIVERSAL JOINTS
...................3-11
ASSEMBLY, DRIVER AIRBAG
...........8O-16
ASSEMBLY, FLYWHEEL
.................6-14
ASSEMBLY, FRONT CLUTCH
.....21-162,21-333
ASSEMBLY, FRONT SERVO
......21-164,21-335
ASSEMBLY, GLOVE BOX
..............23-111
ASSEMBLY, HVAC HOUSING
............24-36
ASSEMBLY, INSTRUMENT CLUSTER
......8J-12
ASSEMBLY, MANUAL - NV4500
.........21-21
ASSEMBLY, MANUAL - NV5600
.........21-64
ASSEMBLY, OIL PUMP
.................9-49
ASSEMBLY, OIL PUMP
.........21-169,21-340
ASSEMBLY, OVERDRIVE UNIT
....21-180,21-354ASSEMBLY, OVERRUNNING CLUTCH
CAM/OVERDRIVE PISTON
RETAINER...................21-193,21-364
ASSEMBLY, PLANETARY GEARTRAIN/
OUTPUT SHAFT...............21-199,21-371
ASSEMBLY, REAR CLUTCH......21-205,21-377
ASSEMBLY, REAR SERVO.......21-207,21-379
ASSEMBLY, SINGLE CARDAN
UNIVERSAL JOINTS....................3-9
ASSEMBLY, TRANSFER CASE - NV241HD . 21-480
ASSEMBLY, TRANSFER CASE - NV241LD . 21-445
ASSEMBLY, VALVE BODY.......21-248,21-420
ASSIST HANDLE - INSTALLATION.......23-124
ASSIST HANDLE - REMOVAL..........23-124
ASSY - CLEANING, ROCKER ARM /
ADJUSTER..........................9-146
ASSY - DESCRIPTION, ROCKER ARM /
ADJUSTER..........................9-145
ASSY - INSPECTION, ROCKER ARM /
ADJUSTER..........................9-146
ASSY - INSTALLATION, ROCKER ARM /
ADJUSTER......................9-148,9-84
ASSY - REMOVAL, ROCKER ARM /
ADJUSTER......................9-145,9-84
AUDIO - DESCRIPTION.................8A-1
AUDIO - DIAGNOSIS AND TESTING.......8A-2
AUDIO - OPERATION...................8A-2
AUDIO SYSTEMS, SPECIAL TOOLS.......8A-4
AUTO. TRANS. - INSTALLATION, DIESEL
WITH..........................8P-12,8P-6
AUTO. TRANS. - REMOVAL, DIESEL
WITH...........................8P-5,8P-9
AUTOMATIC DAY / NIGHT MIRROR -
DESCRIPTION.......................8N-11
AUTOMATIC DAY / NIGHT MIRROR -
INSTALLATION......................8N-13
AUTOMATIC DAY / NIGHT MIRROR -
OPERATION.........................8N-12
AUTOMATIC DAY / NIGHT MIRROR -
REMOVAL..........................8N-13
AUTOMATIC DAY/NIGHT MIRROR -
DIAGNOSIS AND TESTING.............8N-12
AUTOMATIC TRANSMISSION - 46RE -
DESCRIPTION.......................21-89
AUTOMATIC TRANSMISSION - 46RE -
OPERATION.........................21-91
AUTOMATIC TRANSMISSION - 47RE -
DESCRIPTION......................21-261
AUTOMATIC TRANSMISSION - 47RE -
OPERATION........................21-263
AUTOMATIC TRANSMISSION -
DIAGNOSIS AND TESTING.......21-268,21-96
AUTOMATIC TRANSMISSION FLUID -
DESCRIPTION.........................0-6
AUTOMATIC TRANSMISSION FLUID -
OPERATION...........................0-6
AXLE - 248FBI - ADJUSTMENTS, FRONT . . . 3-19
AXLE - 248FBI - DESCRIPTION, FRONT....3-14
AXLE - 248FBI - INSTALLATION, FRONT....3-18
AXLE - 248FBI - OPERATION, FRONT......3-14
AXLE - 248FBI - REMOVAL, FRONT.......3-18
AXLE - 248RBI - ADJUSTMENTS, REAR....3-51
AXLE - 248RBI - DESCRIPTION, REAR.....3-46
AXLE - 248RBI - INSTALLATION, REAR....3-51
AXLE - 248RBI - OPERATION, REAR.......3-46
AXLE - 248RBI - REMOVAL, REAR........3-51
AXLE - 267RBI - ADJUSTMENTS, REAR....3-83
AXLE - 267RBI - DESCRIPTION, REAR.....3-78
AXLE - 267RBI - INSTALLATION, REAR....3-82
AXLE - 267RBI - OPERATION, REAR.......3-78
AXLE - 267RBI - REMOVAL, REAR........3-82
AXLE - 286RBI - ADJUSTMENTS, REAR . . . 3-112
AXLE - 286RBI - DESCRIPTION, REAR....3-107
AXLE - 286RBI - INSTALLATION, REAR . . . 3-112
AXLE - 286RBI - OPERATION, REAR......3-108
AXLE - 286RBI - REMOVAL, REAR.......3-112
AXLE - DIAGNOSIS AND
TESTING...............3-108,3-15,3-47,3-80
AXLE - INSTALLATION, DANA 44.....2-20,2-21
AXLE - INSTALLATION, DANA 60.....2-20,2-22
AXLE - INSTALLATION, INTERMEDIATE....3-30
AXLE - REMOVAL, DANA 44.............2-21
AXLE - REMOVAL, DANA 60.............2-21
AXLE, 248FBI - FRONT
.................3-27
AXLE, 248RBI - REAR
..................3-59
AXLE, 267RBI - REAR
..................3-91
AXLE, 286 RBI - REAR
................3-120
AXLE, 286RBI - REAR
.................3-120
2 INDEXBR/BE
Description Group-Page Description Group-Page Description Group-Page
Page 2221 of 2255

BLOCK - DIAGNOSIS AND TESTING,
JUNCTION........................8W-97-7
BLOCK - INSPECTION, ENGINE.......9-27,9-85
BLOCK HEATER - 5.9L - DESCRIPTION,
ENGINE.............................7-44
BLOCK HEATER - 5.9L - INSTALLATION,
ENGINE.............................7-44
BLOCK HEATER - 5.9L - OPERATION,
ENGINE.............................7-44
BLOCK HEATER - 5.9L - REMOVAL,
ENGINE.............................7-44
BLOCK HEATER - 5.9L DIESEL -
DESCRIPTION, ENGINE.................7-46
BLOCK HEATER - 5.9L DIESEL -
INSTALLATION, ENGINE................7-46
BLOCK HEATER - 5.9L DIESEL -
OPERATION, ENGINE...................7-46
BLOCK HEATER - 5.9L DIESEL -
REMOVAL, ENGINE....................7-46
BLOCK HEATER - 8.0L - DESCRIPTION,
ENGINE.............................7-45
BLOCK HEATER - 8.0L - INSTALLATION,
ENGINE.............................7-45
BLOCK HEATER - 8.0L - OPERATION,
ENGINE.............................7-45
BLOCK HEATER - 8.0L - REMOVAL,
ENGINE.............................7-45
BLOCK REFACING - STANDARD
PROCEDURE, CYLINDER...............9-148
BLOWER MOTOR - DESCRIPTION.......24-31
BLOWER MOTOR - DIAGNOSIS AND
TESTING...........................24-32
BLOWER MOTOR - INSTALLATION........24-32
BLOWER MOTOR - OPERATION.........24-31
BLOWER MOTOR - REMOVAL...........24-32
BLOWER MOTOR RELAY - DESCRIPTION . . 24-22
BLOWER MOTOR RELAY - DIAGNOSIS
AND TESTING.......................24-22
BLOWER MOTOR RELAY -
INSTALLATION.......................24-23
BLOWER MOTOR RELAY - OPERATION . . . 24-22
BLOWER MOTOR RELAY - REMOVAL.....24-23
BLOWER MOTOR RESISTOR BLOCK -
DESCRIPTION.......................24-23
BLOWER MOTOR RESISTOR BLOCK -
DIAGNOSIS AND TESTING.............24-23
BLOWER MOTOR RESISTOR BLOCK -
INSTALLATION.......................24-24
BLOWER MOTOR RESISTOR BLOCK -
OPERATION.........................24-23
BLOWER MOTOR RESISTOR BLOCK -
REMOVAL..........................24-24
BLOWER MOTOR SWITCH -
DESCRIPTION.......................24-24
BLOWER MOTOR SWITCH - DIAGNOSIS
AND TESTING.......................24-25
BLOWER MOTOR SWITCH - OPERATION . . 24-24
BLOWER MOTOR SWITCH - REMOVAL . . . 24-25
BODY - ADJUSTMENTS, VALVE . . 21-257,21-428
BODY - ASSEMBLY, VALVE......21-248,21-420
BODY & CABLE - DESCRIPTION,
ANTENNA...........................8A-4
BODY & CABLE - INSTALLATION,
ANTENNA...........................8A-6
BODY & CABLE - OPERATION, ANTENNA . . . 8A-4
BODY & CABLE - REMOVAL, ANTENNA....8A-6
BODY - CLEANING, VALVE......21-244,21-418
BODY - DESCRIPTION, THROTTLE.......14-47
BODY - DESCRIPTION, VALVE....21-218,21-391
BODY - DISASSEMBLY, VALVE . . . 21-237,21-409
BODY - INSPECTION, VALVE.....21-244,21-419
BODY - INSTALLATION, VALVE . . . 21-256,21-428
BODY - OPERATION, THROTTLE.........14-47
BODY - OPERATION, VALVE.....21-223,21-394
BODY - REMOVAL, VALVE.......21-236,21-407
BODY CODE PLATE - DESCRIPTION.....Intro.-4
BODY GAP AND FLUSH
MEASUREMENTS, SPECIFICATIONS......23-56
BODY OPENING DIMENSIONS,
SPECIFICATIONS.....................23-60
BODY SEALER LOCATIONS,
SPECIFICATIONS
.....................23-47
BODY SIDE MOLDINGS - INSTALLATION
. . 23-87
BODY SIDE MOLDINGS - REMOVAL
......23-86
BODY STRIPES AND DECALS -
INSTALLATION
.......................23-87
BODY STRIPES AND DECALS -
REMOVAL
..........................23-87BODY VENT - INSTALLATION..........23-126
BODY VENT - REMOVAL..............23-126
BOOST PRESSURE - DIAGNOSIS AND
TESTING...........................14-93
BOOST PRESSURE - DIAGNOSIS AND
TESTING, TURBOCHARGER.............11-13
BOOSTER - DIAGNOSIS AND TESTING,
HYDRAULIC..........................5-18
BOOSTER - DIAGNOSIS AND TESTING,
MASTER CYLINDER/POWER.............5-26
BOOSTER - INSTALLATION, POWER
BRAKE..............................5-19
BOOSTER - REMOVAL, POWER BRAKE....5-19
BOOT - INSTALLATION, 4WD FLOOR
SHIFT.............................23-122
BOOT - MANUAL TRANSMISSION -
INSTALLATION, SHIFT................23-122
BOOT - MANUAL TRANSMISSION -
REMOVAL, SHIFT....................23-122
BOOT - REMOVAL, 4WD FLOOR SHIFT . . . 23-122
BORE - DE-GLAZE - STANDARD
PROCEDURE, CYLINDER...............9-148
BORE HONING - STANDARD
PROCEDURE, CYLINDER............9-11,9-65
BORE REPAIR - STANDARD
PROCEDURE, CAM...................9-151
BORE REPAIR - STANDARD
PROCEDURE, CYLINDER...............9-149
BOX - ASSEMBLY, GLOVE.............23-111
BOX - DISASSEMBLY, GLOVE..........23-110
BOX - INSTALLATION, CARGO..........23-97
BOX - REMOVAL, CARGO..............23-97
BOX LAMP AND SWITCH -
INSTALLATION, GLOVE................8L-36
BOX LAMP AND SWITCH - REMOVAL,
GLOVE.............................8L-35
BOX LATCH STRIKER - INSTALLATION,
GLOVE............................23-112
BOX LATCH STRIKER - REMOVAL,
GLOVE............................23-111
BOX OPENING UPPER TRIM -
INSTALLATION, GLOVE...............23-112
BOX OPENING UPPER TRIM - REMOVAL,
GLOVE............................23-112
B-PILLAR DOOR SEAL - INSTALLATION . . 23-151
B-PILLAR DOOR SEAL - REMOVAL......23-151
B-PILLAR TRIM - INSTALLATION.......23-120
B-PILLAR TRIM - REMOVAL...........23-120
BRACKET - INSTALLATION, CAB
CHASSIS ADAPTER...................13-10
BRACKET - INSTALLATION, REARVIEW
MIRROR SUPPORT..................23-126
BRACKET - REMOVAL, CAB CHASSIS
ADAPTER...........................13-10
BRAKE - DESCRIPTION, CONTROLLER
ANTILOCK..........................8E-11
BRAKE - DESCRIPTION, PARKING........5-28
BRAKE - INSTALLATION, CONTROLLER
ANTILOCK..........................8E-12
BRAKE - OPERATION, CONTROLLER
ANTILOCK..........................8E-11
BRAKE - OPERATION, PARKING..........5-28
BRAKE - REMOVAL, CONTROLLER
ANTILOCK..........................8E-11
BRAKE BOOSTER - INSTALLATION,
POWER.............................5-19
BRAKE BOOSTER - REMOVAL, POWER....5-19
BRAKE CABLE - INSTALLATION, FRONT
PARKING............................5-30
BRAKE CABLE - INSTALLATION, REAR
PARK...............................5-30
BRAKE CABLE - REMOVAL, FRONT
PARKING............................5-29
BRAKE CABLE - REMOVAL, REAR PARK . . . 5-29
BRAKE CALIPERS - DESCRIPTION, DISC . . . 5-10
BRAKE CALIPERS - OPERATION, DISC.....5-10
BRAKE FLUID CONTAMINATION -
DIAGNOSIS AND TESTING..............5-15
BRAKE FLUID LEVEL - STANDARD
PROCEDURE.........................5-15
BRAKE FLUID, SPECIFICATIONS
..........5-15
BRAKE INDICATOR - DESCRIPTION,
BRAKE/PARK
........................8J-15
BRAKE INDICATOR - DIAGNOSIS AND
TESTING
...........................8J-16
BRAKE INDICATOR - OPERATION,
BRAKE/PARK
........................8J-15
BRAKE LAMP SWITCH - DESCRIPTION
....8L-4BRAKE LAMP SWITCH - DIAGNOSIS
AND TESTING........................8L-5
BRAKE LAMP SWITCH - INSTALLATION....8L-6
BRAKE LAMP SWITCH - OPERATION......8L-4
BRAKE LAMP SWITCH - REMOVAL.......8L-5
BRAKE ROTOR, DIAGNOSIS AND
TESTING - DISC......................5-20
BRAKE SHOES - ADJUSTMENT, PARKING . . 5-33
BRAKE, SPECIFICATIONS - BASE..........5-2
BRAKE SYSTEM - DIAGNOSIS AND
TESTING, BASE........................5-5
BRAKE SYSTEM - STANDARD
PROCEDURE, BLEEDING ABS............5-36
BRAKE/PARK BRAKE INDICATOR -
DESCRIPTION.......................8J-15
BRAKE/PARK BRAKE INDICATOR -
OPERATION.........................8J-15
BRAKES - ABS - DESCRIPTION...........5-35
BRAKES - ABS - OPERATION............5-36
BRAKES - DIAGNOSIS AND TESTING,
ANTILOCK...........................5-36
BRAKES, SPECIAL TOOLS - BASE.........5-4
BR/BE PAINT COLOR CODES,
SPECIFICATIONS - 2002..............23-129
BREAKER - DESCRIPTION, CIRCUIT....8W-97-4
BREAKER - DIAGNOSIS AND TESTING,
CIRCUIT.........................8W-97-4
BREAK-IN - STANDARD PROCEDURE,
A/C COMPRESSOR CLUTCH............24-13
BREATHER VAPOR CANISTER -
INSTALLATION, CRANKCASE.............9-126
BREATHER VAPOR CANISTER -
REMOVAL, CRANKCASE...............9-125
BUCKLE - INSTALLATION, FRONT SEAT
BELT ..............................8O-20
BUCKLE - INSTALLATION, REAR SEAT
BELT ..............................8O-27
BUCKLE - REMOVAL, FRONT SEAT BELT . . 8O-20
BUCKLE - REMOVAL, REAR SEAT BELT . . . 8O-27
BUMPER - INSTALLATION, FRONT........13-4
BUMPER - INSTALLATION, REAR.........13-6
BUMPER - INSTALLATION, SLAM........23-67
BUMPER - REMOVAL, FRONT............13-4
BUMPER - REMOVAL, REAR.............13-6
BUMPER - REMOVAL, SLAM...........23-67
BUMPER - SPORT - INSTALLATION,
FRONT..............................13-5
BUMPER - SPORT - REMOVAL, FRONT....13-5
BUMPERS - DESCRIPTION..............13-1
BURNT FLUID - DIAGNOSIS AND
TESTING, CAUSES OF..........21-157,21-327
BUS - DESCRIPTION, CCD DATA..........8E-6
BUS - DIAGNOSIS AND TESTING, CCD
DATA ..............................8E-11
BUS - OPERATION, CCD DATA...........8E-7
BUSHING - INSTALLATION,
DISTRIBUTOR........................9-35
BUSHING - INSTALLATION, EXTENSION
HOUSING....................21-156,21-326
BUSHING - REMOVAL, DISTRIBUTOR......9-35
BUSHING - REMOVAL, EXTENSION
HOUSING....................21-156,21-326
BUSHING AND SEAL - INSTALLATION,
EXTENSION HOUSING..........21-460,21-497
BUSHING AND SEAL - REMOVAL,
EXTENSION HOUSING..........21-460,21-497
BUSHINGS - INSTALLATION.............2-27
BUSHINGS - REMOVAL.................2-27
BYPASS HOSE WITH AIR CONDITIONING
- INSTALLATION, WATER PUMP..........7-76
BYPASS HOSE WITH AIR CONDITIONING
- REMOVAL, WATER PUMP..............7-73
BYPASS HOSE WITHOUT AIR
CONDITIONING - INSTALLATION,
WATER PUMP........................7-77
BYPASS HOSE WITHOUT AIR
CONDITIONING - REMOVAL, WATER
PUMP..............................7-76
CAB - INSTALLATION, CLUB/QUAD.......8O-20
CAB - INSTALLATION, STANDARD.......8O-19
CAB - REMOVAL, CLUB/QUAD
..........8O-19
CAB - REMOVAL, STANDARD
...........8O-18
CAB CHASSIS ADAPTER BRACKET -
INSTALLATION
.......................13-10
CAB CHASSIS ADAPTER BRACKET -
REMOVAL
..........................13-10
CAB SIDE PANEL SPEAKER -
INSTALLATION, REAR
.................8A-20
4 INDEXBR/BE
Description Group-Page Description Group-Page Description Group-Page
Page 2226 of 2255

CRANKSHAFT MAIN BEARINGS -
DESCRIPTION........................9-31
CRANKSHAFT MAIN BEARINGS -
INSTALLATION....................9-32,9-88
CRANKSHAFT MAIN BEARINGS -
OPERATION..........................9-31
CRANKSHAFT MAIN BEARINGS -
REMOVAL.......................9-31,9-88
CRANKSHAFT MAIN BEARINGS -
STANDARD PROCEDURE, FITTING........9-88
CRANKSHAFT OIL SEAL - FRONT -
DESCRIPTION........................9-32
CRANKSHAFT OIL SEAL - FRONT -
INSTALLATION...................9-160,9-32
CRANKSHAFT OIL SEAL - FRONT -
OPERATION..........................9-32
CRANKSHAFT OIL SEAL - FRONT -
REMOVAL......................9-160,9-32
CRANKSHAFT OIL SEAL - REAR -
DESCRIPTION........................9-33
CRANKSHAFT OIL SEAL - REAR -
INSTALLATION...............9-162,9-34,9-90
CRANKSHAFT OIL SEAL - REAR -
OPERATION..........................9-33
CRANKSHAFT OIL SEAL - REAR -
REMOVAL..................9-161,9-33,9-90
CRANKSHAFT REAR OIL SEAL RETAINER
- INSTALLATION.................9-163,9-90
CRANKSHAFT REAR OIL SEAL RETAINER
- REMOVAL.....................9-162,9-90
CROSSHEADS - CLEANING.............9-134
CROSSHEADS - INSPECTION...........9-135
CRUISE INDICATOR - DESCRIPTION.......8J-18
CRUISE INDICATOR - OPERATION.......8J-18
CUBBY BIN - INSTALLATION...........23-109
CUBBY BIN - REMOVAL..............23-108
CUP HOLDER - INSTALLATION.........23-110
CUP HOLDER - REMOVAL.............23-109
CUSHION - INSTALLATION, SEAT.......23-138
CUSHION - REMOVAL, SEAT...........23-138
CUSHION COVER - INSTALLATION, SEAT . 23-139
CUSHION COVER - REMOVAL, SEAT.....23-139
CUSHION COVER - SPLIT BENCH -
INSTALLATION, SEAT.................23-140
CUSHION COVER - SPLIT BENCH -
REMOVAL, SEAT....................23-139
CYLINDER - DESCRIPTION, MASTER......5-26
CYLINDER - DIAGNOSIS AND TESTING,
IGNITION SWITCH AND KEY LOCK........19-9
CYLINDER - INSTALLATION, LOCK.......23-74
CYLINDER - INSTALLATION, LOCK.......19-10
CYLINDER - INSTALLATION, MASTER.....5-28
CYLINDER - OPERATION, MASTER........5-26
CYLINDER - REMOVAL, LOCK...........23-74
CYLINDER - REMOVAL, LOCK...........19-10
CYLINDER - REMOVAL, MASTER.........5-27
CYLINDER BLEEDING - STANDARD
PROCEDURE, MASTER.................5-27
CYLINDER BLOCK REFACING -
STANDARD PROCEDURE...............9-148
CYLINDER BORE - DE-GLAZE -
STANDARD PROCEDURE...............9-148
CYLINDER BORE HONING - STANDARD
PROCEDURE.....................9-11,9-65
CYLINDER BORE REPAIR - STANDARD
PROCEDURE........................9-149
CYLINDER COMBUSTION PRESSURE
LEAKAGE - DIAGNOSIS AND TESTING
. . 9-64,9-9
CYLINDER COMPRESSION PRESSURE -
DIAGNOSIS AND TESTING
...........9-64,9-9
CYLINDER HEAD - CLEANING
.......9-134,9-77
CYLINDER HEAD - DESCRIPTION
. . . 9-130,9-20,
9-76
CYLINDER HEAD - INSPECTION
.....9-134,9-77
CYLINDER HEAD - INSTALLATION
........9-77
CYLINDER HEAD - OPERATION
...........9-21
CYLINDER HEAD - REMOVAL
.......9-130,9-76
CYLINDER HEAD COVER GASKET -
DESCRIPTION
........................9-20
CYLINDER HEAD COVER GASKET -
OPERATION
..........................9-21
CYLINDER HEAD COVER(S) - CLEANING
. . 9-137,
9-23,9-79
CYLINDER HEAD COVER(S) -
DESCRIPTION
........................9-78
CYLINDER HEAD COVER(S) -
INSPECTION
................9-138,9-23,9-79CYLINDER HEAD COVER(S) -
INSTALLATION...............9-138,9-23,9-79
CYLINDER HEAD COVER(S) - REMOVAL . . 9-137,
9-23,9-78
CYLINDER HEAD GASKET FAILURE -
DIAGNOSIS AND TESTING..........9-21,9-76
CYLINDER LOCK SWITCH -
DESCRIPTION, DOOR..................8N-5
CYLINDER LOCK SWITCH - DIAGNOSIS
AND TESTING, DOOR..................8N-6
CYLINDER LOCK SWITCH -
INSTALLATION, DOOR.................8N-6
CYLINDER LOCK SWITCH - OPERATION,
DOOR..............................8N-5
CYLINDER LOCK SWITCH - REMOVAL,
DOOR..............................8N-6
CYLINDER/POWER BOOSTER -
DIAGNOSIS AND TESTING, MASTER......5-26
DAM - INSTALLATION, FRONT AIR........13-2
DAM - REMOVAL, FRONT AIR...........13-2
DAMAGED OR WORN THREADS -
STANDARD PROCEDURE,
REPAIR ....................9-11,9-122,9-66
DAMPER - INSPECTION, VIBRATION.....9-172
DAMPER - INSTALLATION,
VIBRATION.................9-173,9-40,9-97
DAMPER - REMOVAL, VIBRATION . . . 9-172,9-40,
9-96
DANA 44 & 60 - REMOVAL..............2-19
DANA 44 AXLE - INSTALLATION......2-20,2-21
DANA 44 AXLE - REMOVAL.............2-21
DANA 60 AXLE - INSTALLATION.......2-20,2-22
DANA 60 AXLE - REMOVAL.............2-21
DATA BUS - DESCRIPTION, CCD..........8E-6
DATA BUS - DIAGNOSIS AND TESTING,
CCD ...............................8E-11
DATA BUS - OPERATION, CCD...........8E-7
DATA LINK CONNECTOR - DESCRIPTION . . 8E-12
DATA LINK CONNECTOR - OPERATION....8E-12
DATA PLATE - DESCRIPTION, ENGINE....9-129
DATA PLATE, SPECIFICATIONS - FUEL
INJECTION PUMP....................14-77
DAY / NIGHT MIRROR - DESCRIPTION,
AUTOMATIC........................8N-11
DAY / NIGHT MIRROR - INSTALLATION,
AUTOMATIC........................8N-13
DAY / NIGHT MIRROR - OPERATION,
AUTOMATIC........................8N-12
DAY / NIGHT MIRROR - REMOVAL,
AUTOMATIC........................8N-13
DAY/NIGHT MIRROR - DIAGNOSIS AND
TESTING, AUTOMATIC................8N-12
DAYTIME RUNNING LAMP MODULE -
DESCRIPTION........................8L-9
DAYTIME RUNNING LAMP MODULE -
INSTALLATION........................8L-9
DAYTIME RUNNING LAMP MODULE -
OPERATION..........................8L-9
DAYTIME RUNNING LAMP MODULE -
REMOVAL...........................8L-9
DECALS - INSTALLATION..............23-64
DECALS - INSTALLATION, BODY
STRIPES...........................23-87
DECALS - REMOVAL..................23-64
DECALS - REMOVAL, BODY STRIPES
.....23-87
DEFINITION - DESCRIPTION, TRIP
.......25-19
DEFROSTER AND DEMISTER DUCT
ADAPTER - INSTALLATION
.............24-33
DEFROSTER AND DEMISTER DUCT
ADAPTER - REMOVAL
.................24-33
DEFROSTER AND DEMISTER DUCTS -
INSTALLATION
.......................24-33
DEFROSTER AND DEMISTER DUCTS -
REMOVAL
..........................24-33
DE-GLAZE - STANDARD PROCEDURE,
CYLINDER BORE
.....................9-148
DELIVERY - SPECIFICATIONS, TORQUE -
FUEL
...............................14-4
DELIVERY SYSTEM - DESCRIPTION,
DIESEL FUEL
........................14-55
DELIVERY SYSTEM - DESCRIPTION,
FUEL
...............................14-2
DELIVERY SYSTEM - OPERATION, FUEL
. . . 14-2
DEMAGNETIZING - STANDARD
PROCEDURE, COMPASS
...............8M-5
DEMISTER DUCT ADAPTER -
INSTALLATION, DEFROSTER
............24-33DEMISTER DUCT ADAPTER - REMOVAL,
DEFROSTER.........................24-33
DEMISTER DUCTS - INSTALLATION,
DEFROSTER.........................24-33
DEMISTER DUCTS - INSTALLATION,
INSTRUMENT PANEL..................24-36
DEMISTER DUCTS - REMOVAL,
DEFROSTER.........................24-33
DEMISTER DUCTS - REMOVAL,
INSTRUMENT PANEL..................24-36
DEMISTER GRILLES - INSTALLATION.....24-31
DEMISTER GRILLES - REMOVAL........24-31
DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER AN
AIRBAG.............................8O-4
DETECTION PUMP - DESCRIPTION, LEAK . 25-34
DETECTION PUMP - INSTALLATION,
LEAK..............................25-34
DETECTION PUMP - OPERATION, LEAK . . . 25-34
DETECTION PUMP - REMOVAL, LEAK....25-34
DIAGRAMS - DESCRIPTION, HOW TO
USE WIRING......................8W-01-1
DIAGRAMS - HYDRAULIC SCHEMATICS,
SCHEMATICS.................21-132,21-302
DIESEL - CLEANING, RADIATOR - 5.9L....7-64
DIESEL - CLEANING, RADIATOR FAN -
5.9L................................7-43
DIESEL - CLEANING, WATER PUMP -
5.9L................................7-72
DIESEL - DESCRIPTION................25-1
DIESEL - DESCRIPTION........14-106,14-108
DIESEL - DESCRIPTION.................8I-6
DIESEL - DESCRIPTION, 5.9L............11-3
DIESEL - DESCRIPTION, BELT
TENSIONERS - 5.9L...................7-23
DIESEL - DESCRIPTION, COOLANT
RECOVERY CONTAINER - 3.9L/5.2L/
5.9L/5.9L............................7-40
DIESEL - DESCRIPTION, COOLING
SYSTEM FLOW - 5.9L...................7-2
DIESEL - DESCRIPTION, ENGINE 5.9L....9-115
DIESEL - DESCRIPTION, ENGINE BLOCK
HEATER - 5.9L........................7-46
DIESEL - DESCRIPTION, ENGINE
COOLANT THERMOSTAT - 5.9L...........7-53
DIESEL - DESCRIPTION, FAN DRIVE
VISCOUS CLUTCH - 5.9L...............7-56
DIESEL - DESCRIPTION, RADIATOR -
5.9L................................7-62
DIESEL - DESCRIPTION, TRANS COOLER
- 5.9L..............................7-84
DIESEL - DESCRIPTION, VACUUM PUMP
- 5.9L..............................7-33
DIESEL - DESCRIPTION, WATER PUMP -
5.9L................................7-72
DIESEL - FUEL INJECTOR FIRING ORDER . 14-62
DIESEL - INSPECTION, EXHAUST PIPE -
5.9L................................11-9
DIESEL - INSPECTION, RADIATOR - 5.9L . . . 7-64
DIESEL - INSPECTION, RADIATOR FAN -
5.9L................................7-43
DIESEL - INSPECTION, TAILPIPE - 5.9L . . . 11-12
DIESEL - INSPECTION, WATER PUMP -
5.9L................................7-72
DIESEL - INSTALLATION..............14-107
DIESEL - INSTALLATION................8I-9
DIESEL - INSTALLATION, BELT
TENSIONERS - 5.9L...................7-23
DIESEL - INSTALLATION, COOLANT
RECOVERY CONTAINER - 3.9L/5.2L/
5.9L/5.9L............................7-41
DIESEL - INSTALLATION, DRIVE BELTS -
5.9L................................7-32
DIESEL - INSTALLATION, ENGINE BLOCK
HEATER - 5.9L........................7-46
DIESEL - INSTALLATION, ENGINE
COOLANT THERMOSTAT - 5.9L...........7-54
DIESEL - INSTALLATION, EXHAUST PIPE
- 5.9L..............................11-9
DIESEL - INSTALLATION, MUFFLER -
5.9L
...............................11-11
DIESEL - INSTALLATION, RADIATOR -
5.9L
................................7-64
DIESEL - INSTALLATION, RADIATOR FAN
- 5.9L
..............................7-44
DIESEL - INSTALLATION, TAILPIPE - 5.9L
. 11-13
DIESEL - INSTALLATION, VACUUM
PUMP - 5.9L
.........................7-36
BR/BEINDEX 9
Description Group-Page Description Group-Page Description Group-Page