adding oil GREAT WALL SO COOL 2006 Service Manual
[x] Cancel search | Manufacturer: GREAT WALL, Model Year: 2006, Model line: SO COOL, Model: GREAT WALL SO COOL 2006Pages: 484, PDF Size: 16.35 MB
Page 74 of 484
TF-8Transfer Box Disassembly and Mount of Transfer Box
2. Transfer box mount
a) Coat the lubricant grease on the output axial
spline of the gearbox with a thin sleeve contain-
ing lubricant grease.
b) Mount a new gasket on the mounting face of the
transfer box.
c) Lift the lifting bracket of transfer box and align
it to the same axle with the gearbox.
Notice: The transfer shall be guaranteed to flush
with the gearbox before connecting the spline.
Do not handle it forcefully to press the transfer
box spline into the gearbox. Otherwise, damage
will be caused, run the rear output shaft where
necessary to aim at the spline.
(d) Move the transfer box forward slowly so that
the spline and pin of the input shaft of gearbox
reach the front body of the transfer box, and the
gasket attaches on the gearbox completely.
(e) Ensure that the mounting holes of the front
body of transfer box, gasket, and gearbox are in
alignment and then mount the sets of bolt and
nut.
Fastening torque(35-48)Nm
(f) Connect the rear drive shaft and the rear output
flange of the transfer box.
(g) Connect the front drive shaft and the front
output fork flange of the transfer box.(h) Connect the venting valve and the soft ventila-
tion pipe.
(i) Connect the cables of odometer that locates
nearby the transfer box.
(j) Connect all wire harnesses that connected with
the transfer box, and
(k) Add the lubricant of right brand.
Notice: when starting the engine, if the lubricant
is added incorrectly or in unsuitable volume,
which may lead the transfer box to damage.
Notice: as for the transfer box mounted on
vehicle, oil pump shall be used when adding oil
for it.
Notice: In case the transfer box is taken apart for
maintenance or inspection, there will be no
lubricant supplied by oil pump in the oil passage
on the top of transfer box. Therefore, it is not
accurate to control the oil volume by opening the
oil filling plug, in such condition, the oil passage
will be filled with oil once the oil pump runs. If the
wheel can run, such operation can be conducted
on the lifting jack. The oil level shall be rechecked
once the oil pump runs.
(l) Put down the vehicle after finishing the lubri-
cant inspection, and connect the cell cathode.
Page 366 of 484
AC-3Air Conditioning SystemIntroduction
(c) Tighten the O-ring matching position or the threaded position
to the specified moment.
4. Take notice when connecting measuring meter at branch pipes:
(a) Connect the end of filling hose with high speed joint to the
filling valve of compressor.
(b) Letter D marked on the compressor near the auxiliary valve
represents the side of high voltage while S means the side of
low voltage, which shall be looked out when connecting the hose.
(c) Fasten the bolts by hand, and
(d) In order to prevent the hose from loosing, lubricant oil shall not
be spread at the connection position.
Remarks: after connecting the measuring meter on branch pipes to
the refrigerant container (repairing tank), the air in the hose shall be
exhausted up.
5. Take notice when vacuumizing:
After vacuumizing for 20 min, maintain the container at certain
pressure to ensure that all air in it is exhausted up, and another
inspection shall be made to see whether there is leakage.
6. Take notice when handling with the refrigerant container
(repairing tank):
(a) Do not heat it.
(b) Store the container at the place where temperature is under 40
(c) In case of heating the repairing tank with hot water, care shall
be paid to the valves at the top of tank, do not dip them into the
water, or the water will penetrate into the cooling system.
(d) The empty repairing tank is forbidden to reuse.
8. Take notice when using the high-pressure air cylinder type
inspecting device:
(a) In case the open fire is used, it is the first to ensure before using
there is no flammable material around.
(b) Be careful because toxic gas will be produced when the
gaseous refrigerant meets with the open fire. 7. Take notice in the A/C operation or when adding the liquid
refrigerant:
(a) In case the gaseous refrigerant in the cooling system is
insufficient, which can lead to the compressor burns out, and
such accidents shall be avoided.
(b) If the valve on the side of high pressure is uncovered, the
refrigerant will flow in the reverse direction, which may lead
to the break of the repairing tank, therefore, only valves on the
side of low pressure are allowed to open or closed.
(c) If the repair tank is laid in reverse direction, and the refrigerant
is added in liquid status, the liquid refrigerant will be
compressed, which may lead to failure of the compressor,
therefore, refrigerant shall be inflated in the gaseous status.
(d) Be careful not over-inflate the gaseous refrigerant, otherwise,
such failures as insufficient cooling, increase of oil consuming
or over heat of engine will be followed.
under 40
incorrect
correct
measuring meter of branch pipe
loose over-fastened
A/C operation