Timing chain replace JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide GRAND CHEROKEE 2003 WJ / 2.G JEEP JEEP https://www.carmanualsonline.info/img/16/7175/w960_7175-0.png JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide

Page 1327 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide AIR CLEANER HOUSING
REMOVAL - 4.7L
(1) Disconnect air cleaner cover-to-air duct clamp
(Fig. 8).
(2) Disconnect air duct at housing.
(3)Each of the 3 air cleaner housing mount-
ing bolts is attached wi

Page 1340 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide (5) Using special tool 8516 press downward on the
valve spring, install rocker arm (Fig. 28).
(6) Install the cylinder head cover (Refer to 9 -
ENGINE/CYLINDER HEAD/CYLINDER HEAD
COVER(S) - INSTALLATI

Page 1341 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide VISUAL TEST METHOD
With the engine cool, remove the coolant pressure
cap. Start the engine and allow it to warm up until
thermostat opens.
If a large combustion/compression pressure leak
exists, bubbl

Page 1354 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide Bearing
MarkSIZE USED WITH
JOURNAL SIZE
.025 US.025 mm 50.983-50.967 mm
(.001 in.) (2.0073-2.0066 in.)
Std.STANDARD 50.992-51.008 mm
(2.0076-2.0082 in.)
.250 US.250 mm 50.758-50.742 mm
(.010 in.) (1.9

Page 1363 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide Check the connecting rod for signs of twist or bend-
ing.
Check the piston for taper and elliptical shape
before it is fitted into the cylinder bore (Refer to 9 -
ENGINE/ENGINE BLOCK/PISTON & CONNECT-

Page 1377 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide OIL PUMP
REMOVAL
(1) Remove the oil pan and pick-up tube (Refer to
9 - ENGINE/LUBRICATION/OIL PAN - REMOVAL).
(2) Remove the timing chain cover (Refer to 9 -
ENGINE/VALVE TIMING/TIMING BELT / CHAIN
CO

Page 1388 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide STANDARD PROCEDUREÐMEASURING
TIMING CHAIN WEAR
NOTE: This procedure must be performed with the
timing chain cover removed.
(1) Remove the timing chain cover. (Refer to 9 -
ENGINE/VALVE TIMING/TIMING

Page 1389 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide TIMING BELT / CHAIN
COVER(S)
REMOVAL
(1) Disconnect the battery negative cable.
(2) Drain cooling system (Refer to 7 - COOLING -
STANDARD PROCEDURE).
(3) Disconnect both heater hoses at timing cover.

Page 1392 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide INSPECTION
Inspect the following components:
²Sprockets for excessive tooth wear. Some tooth
markings are normal and not a cause for sprocket
replacement.
²Idler sprocket assembly bushing and shaft

Page 1395 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G User Guide (13) Remove Special Tool 8515, then attach both
sprockets to camshafts. Remove excess oil from bolts,
then Install sprocket bolts, but do not tighten at this
time.
(14) Verify that all plated links ar
Page:   < prev 1-10 11-20