service MITSUBISHI LANCER EVOLUTION VI 1999 Workshop Manual

MITSUBISHI LANCER EVOLUTION VI 1999 Workshop Manual LANCER EVOLUTION VI 1999 MITSUBISHI MITSUBISHI https://www.carmanualsonline.info/img/19/57324/w960_57324-0.png MITSUBISHI LANCER EVOLUTION VI 1999 Workshop Manual

Page 397 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual HEATER AND MANUAL AIR CONDITIONER – On-vehicle Service55-7
2. Charging
1. Open the low-pressure valve of the gauge manifold. Keep
the high-pressure valve closed.
2. With the handles turned back all

Page 398 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual HEATER AND MANUAL AIR CONDITIONER – On-vehicle Service55-8
12. Evacuate  to a vacuum reading of 100 kPa or higher (takes
approx. 10 minutes).
Start evacuation
Approx. for 10 minutes up to
100 kPa
St

Page 399 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual HEATER AND MANUAL AIR CONDITIONER – On-vehicle Service55-9
27. Remove the quick joint 2 from the low-pressure service
valve.
28. Remove the service can.
NOTE
If the service can is not emptied comple

Page 400 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual HEATER AND MANUAL AIR CONDITIONER – On-vehicle Service55-10
REPLENISHING SYSTEM
1. Connect  the charging hose (blue) to the adapter valve
1 with the handle fully turned back (valve closed).
2. Conne

Page 401 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual HEATER AND MANUAL AIR CONDITIONER – On-vehicle Service55-11
DISCHARGING SYSTEM
1. Run the engine at an engine speed of 1,200–1,500 r/min
for approximately 5 minutes with the A/C operating to
retur

Page 402 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual HEATER AND MANUAL AIR CONDITIONER – On-vehicle Service55-12
Caution
(1) To connect the quick joint, press section “A” firmly
against the service valve until a click is heard.
(2) When connecting

Page 403 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual HEATER AND MANUAL AIR CONDITIONER – On-vehicle Service55-13
DUAL PRESSURE SWITCH SIMPLE CHECK
Measure the high-pressure side pressure. If there is a
continuity  between the dual pressure switch term

Page 404 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual HEATER AND MANUAL AIR CONDITIONER – On-vehicle Service55-14
A/C COMPRESSOR RELAY, CONDENSER FAN RELAY
Battery voltageTerminal No.
1345
Power is not supplied
Power is supplied
IDLE-UP OPERATION CHECK

Page 405 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual  – Heater Control Assembly and A/C Switch HEATER AND MANUAL
AIR CONDITIONER55-15
HEATER CONTROL ASSEMBLY AND A/C SWITCH
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
Instrume

Page 406 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual  – Heater Control Assembly and A/C Switch HEATER AND MANUAL
AIR CONDITIONER55-16
INSTALLATION SERVICE POINT
AHEATER CONTROL ASSEMBLY INSTALLATION
1. Cut off the bosses and clamp shown before insta