drain bolt MITSUBISHI LANCER EVOLUTION VI 1999 Workshop Manual

MITSUBISHI LANCER EVOLUTION VI 1999 Workshop Manual LANCER EVOLUTION VI 1999 MITSUBISHI MITSUBISHI https://www.carmanualsonline.info/img/19/57324/w960_57324-0.png MITSUBISHI LANCER EVOLUTION VI 1999 Workshop Manual

Page 33 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual ENGINE – Specifications11-8
ItemsNm
Front case and oil pan
Drain plug39
Oil pan7
Oil screen19
Buffle plate22
Oil pressure switch10
Oil cooler by-pass valve54
Relief plug44
Plug24
Front case24
Oil pu

Page 76 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual ENGINE – Front Case, Counterbalance Shaft and Oil Pan11-51
FRONT CASE, COUNTERBALANCE SHAFT AND OIL PAN
REMOVAL AND INSTALLATION
16 Nm 10 Nm
39 Nm22 Nm
Apply engine oil to all
moving parts before
in

Page 235 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual REAR AXLE – Hydraulic Unit <Vehicles with AYC>27-39
HYDRAULIC UNIT <VEHICLES WITH AYC>
REMOVAL AND INSTALLATION
Caution
(1) When connecting the return hose and suction hose, do not apply lubricant.

Page 236 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual REAR AXLE – Hydraulic Unit <Vehicles with AYC>27-40
REMOVAL SERVICE POINTS
AHYDRAULIC UNIT REMOVAL
Should the hydraulic unit be discarded, drill a hole in the
accumulator at the illustrated positi

Page 255 of 558

MITSUBISHI LANCER EVOLUTION VI 1999  Workshop Manual STEERING – Power Steering Gear Box37A-5
POWER STEERING GEAR BOX <L.H. DRIVE VEHICLES>
REMOVAL AND INSTALLATION
CAUTION: SRS
For vehicles with SRS, before removal of steering gear box, refer to GROUP