drain bolt MITSUBISHI MONTERO 1987 1.G Workshop Manual

MITSUBISHI MONTERO 1987 1.G Workshop Manual MONTERO 1987 1.G MITSUBISHI MITSUBISHI https://www.carmanualsonline.info/img/19/7559/w960_7559-0.png MITSUBISHI MONTERO 1987 1.G Workshop Manual

Page 279 of 284

MITSUBISHI MONTERO 1987 1.G Workshop Manual AIR-CONDBTIONI G - Evaporator 24-43 
EVAPORATOR 
REMOVAL AND INSTALLATION 
N24RA-- 
Pre-removal Operation 
l 
Discharge the refrigerant. (Refer to 
P.24-36) Removal 
steps ~~ 1. Liquid pipe connection

Page 282 of 284

MITSUBISHI MONTERO 1987 1.G Workshop Manual 24-46 
COMPRESSOR 
AIR-CONDITIONING - Compressor 
DISASSEMBLY AND REASSEMBLY N24TE- 
15-h Nm 
11-13 ftlbs 16 
a 0  
I 
26-26 Nm 
16-20 ftlbs. Magnetic clutch disassembly steps 
1. Nut 
~~ Adjustment o