fuse box NISSAN MURANO HYBRID 2016 3.G First Responders Guide
[x] Cancel search | Manufacturer: NISSAN, Model Year: 2016, Model line: MURANO HYBRID, Model: NISSAN MURANO HYBRID 2016 3.GPages: 44, PDF Size: 5.13 MB
Page 15 of 44
• The high-voltage system and high-voltage capacitor may remain powered for up to
approximately 10 minutes after the vehicle is shut off. Appropriate Personal Protective
Equipment (PPE) must always be worn when touching or working on high-voltage
components to avoid risk of electrical shock and severe personal injury or death.
• The high-voltage battery retains high-voltage at all times. Appropriate PPE must always be worn when touching or working on high-voltage components to avoid risk of electrical
shock and severe personal injury or death.
• A ground fault monitor continuously monitors for high-voltage leakage to the metal chassis while the vehicle is running. If a malfunction is detected, the HPCM (hybrid powertrain control module) will
illuminate the hybrid system warning lamp in the instrument cluster.
•
The high-voltage battery relays (SMR1 and SMR2) will automatically open to stop the electrical flow
in a front, side or certain rear collisions that are sufficient enough to activate the supplemental
restraint system (SRS) . Passenger Compartment
J
unction Box High-voltage Battery
System main relay 1
Service Plug (With Fuse)
System main relay 2
Transmission
Traction Motor Traction
Motor Inverter
(With built in high- voltage capacitor) DC/DC
Converter
HPCM
(Hybrid Powertrain Control Module)
Engine Compartment AAYIA0136GB
FRG–15
Page 25 of 44
Alternate Procedure 1 (Remove Fuses)
NO
TE:
Before removing any fuses, if necessary, lower the windows, adjust the steering column,
adjust the seats, unlock the doors, etc. Once fuses are removed, power controls will not
operate.
1. Pull release handle located on the instrument panel and push the release lever under the hoodsideways to open hood.
2. Release clips on the narrow ends of the fuse box cover and remove it. : Vehicle front AAYIA0422ZZ
AAYIA0154GB
FRG–25
Page 26 of 44
3. Remove IGCT RLY fuse (F/L IGCT RLY 50A) .
4.
If you cannot identify the correct fuse, remove all the
fuses. To avoid unintended reinstallation and risk of
electrical
shock and severe personal injury or death, the
rescuer should carry the fuse or fuses on his/her person
and cover the fuse box with insulated tape.
5. Remove traction motor inverter cover.
6. Disconnect negative (-) battery cable and cover it withinsulated tape.
7. Wait approximately ten (10) minutes for complete discharge of the high-voltage capacitor
after the fuse panel and battery cable have been disconnected.
8. Perform the first response action. F/L IGCT RLY 50A
(Red)
AAYIA0154GB
AAYIA0447ZZ
AAYIA0274ZZ
FRG–26