cooling RENAULT TWINGO RS 2009 2.G Transmission User Guide
[x] Cancel search | Manufacturer: RENAULT, Model Year: 2009, Model line: TWINGO RS, Model: RENAULT TWINGO RS 2009 2.GPages: 135
Page 77 of 135
21B-17
SEQUENTIAL GEARBOX
Electro-hydraulic unit: Removal - Refitting
D4F, and JH1
21B
aRefit:
-the front left-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Exterior protection),
-the left-hand front wheel (see Wheel: Removal -
Refitting) (MR 411, 35A, Wheels and tyres),
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (MR 411,
19D, Engine mounting).
Refit.
aFit:
-the petrol injection computer support,
-the engine wiring harness on the petrol injection
computer mounting.
aRefit:
-the petrol injection computer mounting bolts,
-the engine wiring harness nut on the petrol injec-
tion computer mounting,
-the petrol injection computer mounting nut.
aClip onto the petrol injection computer mounting:
-the battery wiring harness,
-the petrol injection computer wiring harness,
-the sequential gearbox computer wiring harness,
-the cooling hose.
aRefit:
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery).
aFill the electric pump assembly reservoir with oil
(see Sequential gearbox oil: Specifications)
(Technical Note 6012, 04A, Lubricants) to between
32 and 38 mm above the MIN mark.aIf replacing the electro-hydraulic unit, carry out the
necessary operations using the Diagnostic tool
(see Fault finding - Replacement of components)
(MR 413, 21B, Sequential gearbox).
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil level is at the MINIMUM mark.
Page 81 of 135
21B-21
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection).
aDetach from the petrol injection computer mounting:
-the cooling hose,
-the sequential gearbox computer wiring harness,
-the petrol injection computer wiring harness,
-the battery wiring harness.
aRemove:
-the petrol injection computer mounting nut (1) , Special tooling required
Mot. 1390Suppor t for removal - refitting
of engine - gearbox assembly
Equipment required
Diagnostic tool
Tightening torquesm
left-hand suspended
engine mounting bolts21 N.m
left-hand suspended
engine mounting rubber
pad bolts62 N.m
left-hand suspended
engine mounting rubber
pad nut105 N.m
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
Note:
To discharge the accumulator and deactivate the
pump assembly pump, (see Fault finding -
Replacement of components) (MR 413, 21B,
Sequential gearbox).
122323
122322
Page 82 of 135
21B-22
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
-the engine wiring harness nut (2) from the petrol in-
jection computer mounting,
-the petrol injection computer mounting bolts (3) .
aRemove the engine wiring harness from the petrol
injection computer mounting.
aRemove the petrol injection computer mounting.
1 - Removing engagement solenoid valve 1,
selection solenoid valve 3 and selection solenoid
valve 4
aDetach the breather pipe (4) :
-from the sequential gearbox lifting eye (5) ,
-from the cooling hose (6) .
aRemove:
-the breather pipe (4) from the sequential gearbox,
-the lifting eye nut (5) from the sequential gearbox,
-the lifting eye (5) from the sequential gearbox.
aRemove the cooling hose.
aDisconnect the pump assembly supply connector (7)
.
aDetach the pump assembly pump supply connector
from the electro-hydraulic unit connector mounting.
aRemove the bolts (8) from the electro-hydraulic unit
connector mounting (9) .
aRemove the electro-hydraulic unit connector mount-
ing (9) .
122314
122313
122316
Page 85 of 135
21B-25
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
a
aRemove:
-the bolts (19) from engagement solenoid valve 2,
-engagement solenoid valve 2.
REFITTING
I - REFITTING PREPARATION OPERATION
aIt is essential to replace the engagement or clutch
solenoid valve seal.
II - REFITTING OPERATION FOR PART
CONCERNED
1 - Refitting engagement solenoid valve 1,
selection solenoid valve 3 and selection solenoid
valve 4
aRefit the affected solenoid valve, following the cor-
rect removal order for the solenoid valves:
-engagement solenoid valve 1 fitted with its new
seal,
-selection solenoid valve 3,
-selection solenoid valve 4,
-the clutch solenoid valve fitted with its new seal.2 - Refitting engagement solenoid valve 2
aRefit:
-engagement solenoid valve 2 fitted with its new
seal,
-engagement solenoid valve 2 bolts.
aConnect the connectors:
-to engagement solenoid valve 2,
-to the solenoid valve unit pressure sensor.
III - FINAL OPERATION
1 - Refitting engagement solenoid valve 1,
selection solenoid valve 3 and selection solenoid
valve 4
aFit the electro-hydraulic unit connector mounting.
aRefit the electro-hydraulic unit connector mounting
bolts.
aClip the pump assembly supply connector onto the
electro-hydraulic unit connector mounting.
aConnect the pump assembly supply connector.
aRefit:
-the sequential gearbox lifting eye on the sequential
gearbox,
-the sequential gearbox lifting eye nut,
-the breather pipe on the sequential gearbox.
aAttach the breather pipe:
-to the cooling hose,
-to the sequential gearbox lifting eye.
2 - Refitting engagement solenoid valve 2
aFit the left-hand suspended engine mounting to the
body.
aFit the left-hand suspended engine mounting bolts
without tightening them.
aTorque tighten the left-hand suspended engine
mounting bolts (21 N.m).
aRaise the sequential gearbox to its original position.
aFit the left-hand suspended engine mounting rubber
pad.
aFit the left-hand suspended engine mounting rubber
pad bolts without tightening them.
aTorque tighten the left-hand suspended engine
mounting rubber pad bolts ( 62 N.m).
122319
Note:
Prepare for oil to flow out of the electro-hydraulic
unit.
Page 86 of 135
21B-26
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
aFit the left-hand suspended engine mounting rubber
pad nut without tightening it.
aTorque tighten the left-hand suspended engine
mounting rubber pad nut (105 N.m ).
aRefit:
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (MR 411,
19D, Engine mounting),
-the front left-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Exterior protection),
-the left-hand front wheel (see Wheel: Removal -
Refitting) (MR 411, 35A, Wheels and tyres).
3 - Refitting all solenoid valves
aFit:
-the petrol injection computer support,
-the engine wiring harness on the petrol injection
computer mounting.
aRefit:
-the petrol injection computer mounting bolts,
-the engine wiring harness nut on the petrol injec-
tion computer mounting,
-the petrol injection computer mounting nut.
aClip onto the petrol injection computer mounting:
-the battery wiring harness,
-the petrol injection computer wiring harness,
-the sequential gearbox computer wiring harness,
-the cooling hose.
aRefit:
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery).aFill the electric pump assembly reservoir with oil
(see Sequential gearbox oil: Specifications)
(Technical Note 6012, 04A, Lubricants) to between
32 and 38 mm above the MIN mark.
aCarry out the necessary operations using the Diag-
nostic tool (see Fault finding - Replacement of
components) (MR 413, 21B, Sequential gearbox). WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil level is at the MINIMUM mark.
Page 91 of 135
21B-31
SEQUENTIAL GEARBOX
Gear selection sensor: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aEngage first gear
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection).
aDetach from the petrol injection computer mounting:
-the cooling hose,
-the sequential gearbox computer wiring harness,
-the petrol injection computer wiring harness,
-the battery wiring harness.aRemove:
-the petrol injection computer mounting nut (1) ,
-the engine wiring harness nut (2) from the petrol in-
jection computer mounting,
-the petrol injection computer mounting bolts (3) .
aRemove the engine wiring harness from the petrol
injection computer mounting.
aRemove the petrol injection computer mounting. Equipment required
Diagnostic tool
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
WARNING
To remove the gear selection sensor it is essen-
tial that you shift to first gear before removal.
122323
122322
Page 93 of 135
21B-33
SEQUENTIAL GEARBOX
Gear selection sensor: Removal - Refitting
D4F, and JH1
21B
-the engine wiring harness on the petrol injection
computer mounting.
aRefit:
-the petrol injection computer mounting bolts,
-the engine wiring harness nut on the petrol injec-
tion computer mounting,
-the petrol injection computer mounting nut.
aClip onto the petrol injection computer mounting:
-the battery wiring harness,
-the petrol injection computer wiring harness,
-the sequential gearbox computer wiring harness,
-the cooling hose.
aRefit:
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
aCarry out the necessary operations using the Diag-
nostic tool (see Fault finding - Replacement of
components) (MR 413, 21B, Sequential gearbox).
Page 96 of 135
21B-36
SEQUENTIAL GEARBOX
Solenoid valve assembly pressure sensor: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection).
aUnclip:
-the cooling hose from the petrol injection computer
mounting,
-the sequential gearbox computer wiring harness
from the petrol injection computer mounting,
-the petrol injection computer wiring harness from
the petrol injection computer mounting,-the battery wiring harness from the petrol injection
computer mounting.
aRemove:
-the petrol injection computer mounting nut (1) ,
-the engine wiring harness nut (2) from the petrol in-
jection computer mounting,
-the petrol injection computer mounting bolts (3) .
aRemove the engine wiring harness from the petrol
injection computer mounting.
aRemove the petrol injection computer mounting. Equipment required
Diagnostic tool
IMPORTANT
Before carrying out any operation on the sequential
system, discharge the accumulator using the diag-
nostic tool.
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
Note:
To discharge the accumulator and deactivate the
pump assembly pump, (see Fault finding -
Replacement of components) (MR 413, 21B,
Sequential gearbox).
122323
122322
Page 97 of 135
21B-37
SEQUENTIAL GEARBOX
Solenoid valve assembly pressure sensor: Removal - Refitting
D4F, and JH1
21B
II - OPERATION FOR REMOVAL OF PART
CONCERNED
aDisconnect the connector (4) from the solenoid
valve unit pressure sensor.
aRemove the solenoid valve unit pressure sensor (5)
.
REFITTING
I - REFITTING PREPARATION OPERATION
aIt is essential to replace the solenoid valve unit pres-
sure sensor seal.
II - REFITTING OPERATION FOR PART
CONCERNED
aRefit the solenoid valve unit pressure sensor.
aConnect the solenoid valve unit pressure sensor
connector.
III - FINAL OPERATION
aFit:
-the petrol injection computer support,
-the engine wiring harness on the petrol injection
computer mounting.aRefit:
-the petrol injection computer mounting bolts,
-the engine wiring harness nut on the petrol injec-
tion computer mounting,
-the petrol injection computer mounting nut.
aClip:
-the battery wiring harness to the petrol injection
computer mounting,
-the petrol injection computer wiring harness to the
petrol injection computer mounting,
-the sequential gearbox computer wiring harness to
the petrol injection computer mounting,
-the cooling hose to the petrol injection computer
mounting.
aRefit:
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery).
aFill the electric pump assembly reservoir with oil
(see Sequential gearbox oil: Specifications)
(Technical Note 6012, 04A, Lubricants) to between
32 and 38 mm above the MIN mark.
aCarry out the necessary operations using the Diag-
nostic tool (see Fault finding - Replacement of
components) (MR 413, 21B, Sequential gearbox).
122317
Note:
Prepare for oil to flow out of the electro-hydraulic
unit.
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil level is at the MINIMUM mark.
Page 100 of 135
21B-40
SEQUENTIAL GEARBOX
Sequential gearbox: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),-the air filter unit (see Air filter unit: Removal - Re-
fitting) (MR 411, 12A, Fuel mixture),
-the front wheels (see Wheel: Removal - Refitting)
(MR 411, 35A, Wheels and tyres),
-the catalytic converter (see Catalytic converter:
Removal - Refitting) ,
-the front wheel arch liners (see Front wheel arch
liner: Removal - Refitting) (MR 412, 55A, Exterior
protection),
-the front bumper (see Front bumper: Removal -
Refitting) (MR 412, 55A, Exterior protection).
aDrain:
-the cooling system (see Cooling system: Drain-
ing - Refilling) (MR 411, 19A, Cooling),
-the sequential gearbox (see 21A, Manual gear-
box, Manual gearbox oils: Draining - Filling,
page 21A-2) .
aDrain the refrigerant circuit (see Refrigerant circuit:
Draining - Filling) (MR 411, 62A, Air conditioning).
aRemove:
-the engine - gearbox assembly (see Engine -
gearbox assembly: Removal - Refitting) (MR
411, 10A, Engine and peripherals),
-the hub-carrier - driveshaft assembly (see ) (MR
411, 31A, Front axle components),
-the starter (see Starter: Removal - Refitting) (MR
411, 16A, Starting - Charging),
-the crankshaft position sensor (see Crankshaft
position sensor: Removal - Refitting) (MR 411,
17B, Petrol injection). Special tooling required
Mot. 1448Remote operation pliers for
hose clips .
Equipment required
workshop hoist
load balancer
roller-type stud removal tool
Tightening torquesm
sequential gearbox
studs7 Nm
sequential gearbox bolts44 Nm
sequential gearbox nuts44 Nm
flywheel protection plate
bolts (18)44 Nm
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
AIR CONDITIONING or CLIMATE CONTROL