maintenance schedule SATURN AURA 2010 User Guide

SATURN AURA 2010 User Guide AURA 2010 SATURN SATURN https://www.carmanualsonline.info/img/68/58570/w960_58570-0.png SATURN AURA 2010 User Guide

Page 327 of 428

SATURN AURA 2010 User Guide 5. Remove the valve cap from the tire’s valve stem.
Activate the TPMS sensor by increasing or
decreasing the tire’s air pressure for about
eight seconds. The horn chirp, can take up to
30 seconds

Page 377 of 428

SATURN AURA 2010 User Guide Maintenance Schedule......................................7-2
Introduction...................................................7-2
Scheduled Maintenance...................................7-3
Owner Check

Page 378 of 428

SATURN AURA 2010 User Guide Maintenance Schedule
Introduction
Notice:Maintenance intervals, checks, inspections,
recommended �uids, and lubricants are necessary
to keep this vehicle in good working condition.
Damage caused by fa

Page 379 of 428

SATURN AURA 2010 User Guide Rotation of New Tires
To maintain ride, handling, and performance of the
vehicle, it is important that the first rotation service for
new tires be performed when they have 8 000 to
13 000 km (5,000 t

Page 383 of 428

SATURN AURA 2010 User Guide Scheduled Maintenance
Service MaintenanceIMaintenanceII
Change engine oil and filter. Reset oil life system.••
Engine coolant level check.••
Windshield washer fluid level check.••
Tire i

Page 389 of 428

SATURN AURA 2010 User Guide Maintenance Record
After the scheduled services are performed, record the date, odometer reading, who performed the service, and the
type of services performed in the boxes provided. Retain all mainte

Page 420 of 428

SATURN AURA 2010 User Guide M
Maintenance Schedule
Maintenance Record....................................7-13
Maintenance Replacement Parts....................7-11
Owner Checks and Services........................... 7-8
Recomme

Page 424 of 428

SATURN AURA 2010 User Guide Safety Warnings and Symbols.............................. iv
Scheduled Maintenance..................................... 7-3
Scheduling Appointments................................... 8-8
Sealant Kit,
Page:   < prev 1-10 11-20