charging SSANGYONG KORANDO 2012 Service Manual

SSANGYONG KORANDO 2012 Service Manual KORANDO 2012 SSANGYONG SSANGYONG https://www.carmanualsonline.info/img/67/57504/w960_57504-0.png SSANGYONG KORANDO 2012 Service Manual

Page 195 of 1082

SSANGYONG KORANDO 2012  Service Manual 06-18
Maximizes the intake air charging efficiency (Approx. 15%) -Optimizes the exhaust gas flow rate by controlling the vanes inside the turbine housing with the E-
Actuator. 1.
(2) E-Actuator (Elect

Page 219 of 1082

SSANGYONG KORANDO 2012  Service Manual 09-70000-00
(1) Checking
Using battery tester ▶
PASS (11.0 V or more): Explain to the customer that the battery is reusable.
Need to be charged (9.0 to 11.0 V): Charge the battery with a charger and

Page 223 of 1082

SSANGYONG KORANDO 2012  Service Manual 09-110000-00
Alternator (140 A)Alternator (120 A)
3) Charging
The alternator uses a new regulator which has three diodes. It consists of the delta stator, rectifier bridge, 
slip ring and brush.
Charg

Page 224 of 1082

SSANGYONG KORANDO 2012  Service Manual 09-12
2. CHARGING OPERATION
1) With Smart Key System

Page 445 of 1082

SSANGYONG KORANDO 2012  Service Manual 09-91452-01
Using battery tester ▶
PASS (11.0 V or more): Explain to the customer that the battery is reusable.
Need to be charged (9.0 to 11.0 V): Charge the battery with a charger and reinstall it

Page 449 of 1082

SSANGYONG KORANDO 2012  Service Manual 09-131452-01
2. CHARGING OPERATION
1) Vehicle without Smart key system

Page 514 of 1082

SSANGYONG KORANDO 2012  Service Manual 14-8
4. INSPECTION - CHARGING CURRENT
Perform the basic inspection. -
Setting up the testers ▶
Preparation ▶
Set up the ammeter and voltmeter as 
shown in the figure. 1.
Make sure to set up the te

Page 519 of 1082

SSANGYONG KORANDO 2012  Service Manual 14-130000-00
Specified 
valueover 11V: Normal
9 ~ 11V: Charging required
below: 9V: Over discharged, 
battery replacement required
7. INSPECTION - BATTERY
Perform the basic inspection (all electric de

Page 520 of 1082

SSANGYONG KORANDO 2012  Service Manual 14-14
2) Voltage Check (with load)
1Push the load switch to ON (to arrow 
direction) direction for less than 5 seconds. 1.
Read the measurement. 2.
Specified 
value7 ~ 9V (Red): Over discharged 
or fa

Page 523 of 1082

SSANGYONG KORANDO 2012  Service Manual 14-170000-00
2. OPERATING PROCESS
System diagram ▶
Operation ▶
EEM monitors the electric loads and battery conditions and controls the voltage to improve the fuel 
economy and battery charging eff
Page:   1-10 11-20 next >